Original source · versioned page text
2015-04-07 Item 2 - Attachment 1 - Pre feasibility Study of Electric Bus Routes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Name Model Origin Range Vehicle Battery Assessment
Length outcome
service the Australian
market.
Not shortlisted
EBUSCO EBUSCO Netherland 250km 12m Lithium– No proven experience
Electric YTP1 s ion in right hand drive
Buses vehicles.
/China
Not shortlisted
Eurobus EuroBus Germany 250km 12m Lithium– Had detailed discussion
2.0 ion with them and they are
unlikely to be able to
support the Australian
market.
Not shortlisted.
Skoda Pure Czech 200km 12m na No proven experience
Perun Electric in right hand drive
Electric RUNner electric vehicles.
Not shortlisted.
Proterra Eco Ride US 46 – 12m na Short range (65km).
BE35 65km Small bus. No proven
experience in right
hand drive vehicles.
Not shortlisted.
Do not manufacture
Bombardier na Canada Variable 12m na buses so they need to
+ Primove work with a bus
manufacturer.
Involved in the
manufacture of
PRIMOVE on-board
equipment and
batteries.
Bombardier together
with Solaris (as bus
manufacturer) was
considered. But Solaris
was not shortlisted and
the opportunity to work
with Bombardier as less
likely for this specific
project
Not shortlisted.
New Flyer na Canada na 12.1m Lithium– No proven experience
(JV ion in right hand drive
Mitsubishi) vehicles.
Not shortlisted
GHD | Feasibility Study of Electric Bus Routes in Noosa - Planning Report | 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.