Original source · versioned page text
2015-04-07 Item 2 - Attachment 1 - Pre feasibility Study of Electric Bus Routes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
4.4.1 Tel Aviv, ‘Dan’ bus operator, BYD pilot Dan is the second largest bus operator in Israel. It is the principal operator within metropolitan of Tel Aviv area (Gush Dan), and also several intercity lines to Jerusalem. Pilot details and feedback Currently running Dan Route 5 (Tel Aviv) and route 61 (Ramat Gan-Tel Aviva) Focused on two (2) key routes that are inner city very high load routes. Bus goes approximately 160km per day on this route This is the first pilot bus for Dan. Planning on expanding the electric fleet Current trial is 12 months. 8 months already conducted Considered Solaris and VDL, but both were more costly than the BYD vehicle and could not compete with the specs and the service levels No indication of price they paid, but cheaper than European models Key criterion was based on the current performance of the diesel bus on the same route. Key was to provide a reliable bus with a good experience for the driver and passengers Maintenance has been very low cost. Expected to be a significant saving compared to diesel fleet Driver training is critical – for the same bus route, some drivers returned the bus with 7% and others with 40% residual charge. Training is critical in order to maximize range and create more consistency across the fleet Target of pilot is reduction of emissions and improvement in maintenance cost - so far this is being achieved Key issues and problems with the bus related to the development of specific requirements to fit Israeli standards. Significant modifications were required on this front. Important to note that BYD were very good with dealing with these modifications and were actively flying people over to manage the process in a very proactive and professional way Air-conditioning can be an issue as it is quite energy intensive (i.e. 10-15 kW). Some issues with the air conditioning system were repaired. The system is generally very energy intensive and BYD are working to develop an improved system Maintenance teams were very responsive often flying people to Israel within 24 hours Infrastructure A 60 kW charger (2x30kW) is deployed at the depot. This is charged at the end of the day with an overnight charge. Drivers are responsible for charging. There have been some issues with drivers not plugging in properly, so there is need for training on this front. The system provided by BYD is quite advanced with automatic and pre-set timers, but the experience is that the system should be used in its simplest form so that the driver gets a real time confirmation of charging. Generally a simple and effective charging solution There has been an issue with the accuracy of the charging unit metering devise. Therefore, the operator has deployed an external meter provided by the utility to measure the exact amount of electricity being charged Some issues with deploying charging infrastructure in public areas, but the depot installation was smooth 32 | GHD | Proposal for Noosa Council & TransLink Division - Planning Report
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.