and costly due to extra fuel and wear and tear (estimated to cost $200,000 over 10 years).
Therefore, needed to upgrade to new technology. Airport decided to review new
technology. After conducting a cost and benefit analysis and taking into account the
environmental and social benefits the electric bus was determined as the best option
Route is 50km per day (i.e. 900 meter routes @ 50 trips a day)
Pilot was conducted with two (2) buses with the key criteria being kWh/km. Two
manufacturers participated namely; BYD and contract buses
6 week trial period with two (2) buses
Passengers were engaged to get feedback – overall very positive response
Key criteria was reliability of buses, ability to operate daily without any issues, use of
power, noise, size of the bus to be suitable for airport bus dimensions (wider and longer
than standard buses), driver and passenger experience
Cultural difference dealing with BYD in China. Some training was undertaken to deal
with cultural differences between the authority and BYD
Experienced significant delays in prototype (i.e. 7 months late). 35 remaining buses
due in December were 4 months late. However, the delay was not just BYD as there were
modifications to interior/exterior requirements which had to be addressed
BYD had difficulty meeting demands for the exterior of the bus and this required
additional modifications and follow up
Airport staff has visited BYD five (5) times and another further two (2) visits were required
In Netherlands, there is a strong advantage for purchasing bus compared to leasing due
to government incentives
Tender included maintenance for next 10 years (responsibility of BYD), local maintenance
company to carry this out. Airport supplied nearby maintenance contacts to BYD
Infrastructure
Tender included installation of charger poles, underground electrical infrastructure
installed by local company (charging capacity – 60kW)
Chargers were not deployed along the route. Airport used overnight charges at the base
Airport has moderate sea climate. Generally between 15°C and 30°C, so climate impacts
on the bus or infrastructure could not be accounted for
Solar field at the airport powers the buses. Solar field is large enough to power all buses.
There was no business case for solar panels on roof as no profits generated
4.4.4 Adelaide City Council -Tindo E bus
The Adelaide City Council is the capital city’s administrative body for local governance in
South Australia. It commenced operating an electric community bus in February 2008
following tests conducted during 2007. This was the first electric vehicle in the world to be
charged using solar power. Council’s electric bus was named “Tindo” based upon a local
indigenous Kaurna term for the sun.
Pilot details and feedback
Information provided was from Council’s project team members involved in the set up and
operation of the electric bus
34 | GHD | Proposal for Noosa Council & TransLink Division - Planning Report
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.