2015-04-07 Item 2 - Attachment 1 - Pre feasibility Study of Electric Bus Routes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
period) which allows for a longer term operational comparison of the current Sunbus diesel bus with both electric bus models. Financial Model Results Over the investment horizon of 15 years, the BYD bus has been found to be the cheapest in terms of upfront purchase costs (Optare +12%). However, the Optare Solo 10M is likely to be the most cost effective option to run in terms of maintenance and servicing. There are marginal differences in fuel efficiency between the two buses, it was surmised that fuel efficiency is not a good basis to distinguish electric bus options. Over the investment horizon of 15 years, the total NPC discounted costs for the Optare electric bus came to an estimated -$624,849 and -$1,074,230 for BYD. The total NPC discounted cost per kilometre came to -$0.33 for Optare and -$0.56 for BYD, respectively. The cost analysis indicates that the Optare solution to be lower from a total NPC discounted cost and cost per kilometre standpoint. This outcome is due mainly to the extended operational life of the Optare with a stated operational life of 25 years as against the BYD at 15 years. Operational Model Results The operational model shows discounted fuel savings of $269,866 and $214,049 for Optare and BYD fleet deployment over the standard Sunbus diesel fleet for the 10 year leasing period. However, these savings were not sufficient to offset the additional operational costs incurred in deployment of electric buses on Route 627. The charging and scheduling limitations of the electric buses – requiring an additional bus to be run on the route – make electric bus deployment an expensive option. Project Risks Identified risks for the project include: New technology - The introduction of an electric bus brings higher degrees of technical and financial uncertainty due to higher up front capital costs combined with the implementation of new technologies Uncertainty surrounding battery life and the performance Uncertainty surrounding “real-world” performance outcomes during the trial given location specific variations in ambient temperatures, braking intensity, and accommodation of air-conditioning load Uncertainty surrounding the Green House Gas (GHG) performance of electric vehicles when powered using electricity generated by non-renewable energy sources Any loss of passenger carrying capacity given final configuration of the chosen bus option and capacity to accommodate unexpected fluctuations in route demand For the above reasons a trial is recommended to test this new technology Study Recommendations Route 627 is recommended to be used as the electric bus trial route GHD | Proposal for Noosa Council & TransLink Division - Planning Report
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.