2015-04-07 Item 2 - Attachment 1 - Pre feasibility Study of Electric Bus Routes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Table 16 Electric Bus Trial Risk Matrix
Almost
Descriptors Rare Unlikely Moderate Likely
Certain
Catastrophic
New Battery
Major
Technology Performance
Operational
Moderate
Risks
Bus Capacity
Minor
Risk
Not Realising
Positive
Insignificant
GHG
Impacts
7.6 Potential funding sources
In recent years, the scale of available grants and funding to support initiatives such as the
Noosa electric vehicle trial has been scaled back considerably. Entities which may have
previously provided grants or funding such as Australian Renewable Energy Agency
(ARENA) or the Commonwealth Department of Industry are responding to increased
budgetary pressures and a reduced emphasis on carbon mitigation policy in recent years.
Although more general in nature, the following recently announced grant may be available
for the trial and is worth exploring:
National Stronger Regions Fund (NSRF)
The NSRF offers $1 B over the next five (5) years to support investment in priority economic
and infrastructure areas. The fund is targeted at local government and incorporated not-for-
profit organisations. The NSRF is the successor to the Regional Development Australia Fund
(RDAF), the comparable nature of the two programs means it may be rolled out as follows:
RDAF provided $438.5M averaging just over $200M per year, and the new NSRF looks to
continue this with $1B over 5 years
Under NSRF, the grants will be between $20,000 and $10M. Under RDAF, the smallest
grant was $69,870 and the largest grant was $15M with the overall average being just
over $2.5M1
Noosa Council Public Transport Levy
The option of a Public Transport levy to fund the trial is also open to Council. However, as
this is for provision of new technology on an existing bus route, it may be difficult to gain
1
GrantReady
http://community.grantready.com.au/Find_Grants/Search/index.aspx?itemDetails=11189&cId=&itemDetailsSubTopi
c=228
GHD | Feasibility Study of Electric Bus Routes in Noosa - Planning Report | 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.