Original source · versioned page text
Operational Works Application OPW19/0168 - DA Form 1 - Owners Consent - 3 Mitti St
Division 2 – Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
9.1) What is the total number of existing lots making up the premises?
9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes)
Subdivision (complete 10)) Dividing land into parts by agreement (complete 11))
Boundary realignment (complete 12)) Creating or changing an easement giving access to a
lot from a construction road (complete 13))
10) Subdivision
10.1) For this development, how many lots are being created and what is the intended use of those
lots:
Intended use of lots created Residential Commercial Industrial Other, please specify:
Number of lots created
10.2) Will the subdivision be staged?
Yes – provide additional details below
No
How many stages will the works include?
What stage(s) will this development
application apply to?
11) Dividing land into parts by agreement – how many parts are being created and what is the intended
use of the parts?
Intended use of parts Residential Commercial Industrial Other, please specify:
created
Number of parts created
12) Boundary realignment
12.1) What are the current and proposed areas for each lot comprising the premises?
Current lot Proposed lot
Lot on plan description Area (m2) Lot on plan description Area (m2)
12.2) What is the reason for the boundary realignment?
13) What are the dimensions and nature of any existing easements being changed and/or any
proposed easement? (attach schedule if there are more than two easements)
Page ! 5
DA Form 1 – Development Application details
Version 1.1— 22 JUNE 2018
[OCR of page images]
Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
9.1) What is the total number of existing lots making up the premises?
9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes)
Subdivision (complete 10)) Dividing land into parts by agreement (complete 11))
Boundary realignment (complete 12)) Creating or changing an easement giving access to a
lot from a construction road (complete 13))
10) Subdivision
10.1) For this development, how many lots are being created and what is the intended use of those
ol cS
Intended use of lots created | Residential Commercial Industrial Other, please specify:
Number of lots created
10.2) Will the subdivision be staged?
Yes — provide additional details below
No
How many stages will the works include?
What stage(s) will this development
application apply to?
11) Dividing land into parts by agreement — how many parts are being created and what is the intended
use of the parts?
Intended use of parts Residential Commercial Industrial Other, please specify:
created
Number of parts created
12) Boundary realignment
12.1) What are the current and proposed areas for each lot comprising the premises?
Current lot Proposed lot
Lot on plan description Area (m2) Lot on plan description Area (m2)
12.2) What is the reason for the boundary realignment?
13) What are the dimensions and nature of any existing easements being changed and/or any
proposed easement? (attach schedule if there are more than two easements)
Page 5
DA Form 1 — Development Application details
Version 1.1— 22 JUNE 2018
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.