D.2 Recommendations for Owners

Foundation Maintenance and Owners Responsibilities: The soils surrounding and under the foundations must be protected from scour
or washout from stormwater by ensuring adequate drainage as noted above.

 

Localised concentrations of moisture such as overflows from hot water cylinders or air conditioners can lead to excessive localised

foundation movements and must also be adequately drained away from the foundations as noted above.

  

 

 

In aii types of soil conditions, if an automatic watering system irrigates w! 2.5 meters of a foundations, instability problems and excessive
foundation movements are likely to occur. Also site drainage as discussed above must be maintained.

  

 

ent’s copy of this report. (Ad

 

Ongoing foundation maintenance is documented in the CSIRO handout BTF-18, attached to the
copies available upon request.)

Refer to the attached detail sheet “General Requirements for Site Drainage”

Additional Requirements - Class A & S Sites: Trees and dense shrubs must be kept wel! away from the building foundations. Refer to
the following section “Recommendations — Builders/Owners — Trees’. In all types of soil conditions, if an automatic watering system irrigates
within 2.5 meters of a footing, instability problems may occur. Water should not be allowed to pond on the ground near the building.
hed surface grades around the building should also ensure scour of soils cannot occur. Additional field gullies and drainage might be
required. in all instances the ground should be sioped away from the foundations at a grade of no less than 1 in 20 (vertical to horizontal)
for at least 1.5m.

 

 

 

Additional Requirements - Class M, H & E Sites: Trees and dense shrubs must be kept well away from the building foundations. Refer

to the following section ‘Recommendations — Builders/Owners — Trees”.

The soil near the building should be protected against the increased moisture that occurs in gardens or permeable landscaping built
adjacent the foundations. Automatic irrigation systems must not be used adjacent structural foundations. If required, these forms of
landscaping must be constructed over impermeable membranes that drain the excessive moisture away from the foundations into correctly
installed field gullies and drains.

We strongly recommend the construction of hard landscaped paths or terrace slabs adjacent building foundations for at least a distance of
4.5m to protect the foundations from excessive moisture.

D.3. Recommendations — Builders/Owners - Trees

 

  

Trees and landscaped gardens can have a dramatic influence over the moisture content of the soils they are grown in. This can lead to
increased soil movement through shrinking and swelling. Where these trees or gardens are within close proximity of structural foundations
the soil movements can affect the structural integrity of the foundations.

For Class M, H and E sites the following recommendations for the minimum distance between trees and footings should be followed:-

 

 

 

ite Class Offset to Tree
Class M ; 0.75 xh
Class H ; TOP xh
Class E : 1.5 xh

Where ‘h’ is the mature height of the tree, further refinement of this recommendation can be pursued where tree species can be considered.
Where a row or group of trees exists the above recommendation should be doubled.

in some instances the installation of root barriers can lessen the effect of trees on foundation performance. Please contact SCG Consulting
Engineers for options.

The following table provides some guidance on mature tree heights:-
APPROXIMATE TREE HEIGHTS

 

70 to 20m Height — Acacias, Ash, Athel Tree, Candlebark, Manna Gum, Pepper Tree, Willows, Yate, Yellow Gum

 

 

20 to 30m Height — But-But, Cedars, English Oak, Lemon Gum, Palms, Planes, Sheoaks, Silky Oak, Spotted Gum, Casuarina

 

 

30 to 60m Height ~ Blue Gum, Cypress, English Elm, Figs. Karri, Pines, River Gum, Sugar Gum

 

The removal of trees from the proposed construction can also greatly affect the moisture conditions of the soil. We recommend allowing the
soil time to reach moisture equilibrium prior to construction commencing. Please contact our office for further guidance on this matter.

SCG Consulting Engineers Appendix Page 5 of 7 Appendices.1

 

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU14_0024 - Response to Information Request - Attachment 4.pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.