Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2018-01-15 General Committee Agenda

of 135

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


         General Committee
              Meeting


             Monday, 15 January 2018

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Jess Glasgow, Ingrid Jackson,
             Joe Jurisevic, Frank Pardon, Brian Stockwell, Tony Wellington



                    “Noosa Shire – different by nature”
Log in to download the original file

2018-01-15 General Committee Agenda(PDF, 13MB).pdf · 13.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 79 (of 135)

Section 2

GENERAL COMMITTEE MEETING AGENDA                                15 JANUARY 2018


TABLE OF CONTENTS

ITEM                                                                        PAGE


ATTENDANCE & APOLOGIES                                                           -

PRESENTATIONS                                                                    -

REPORTS DIRECT TO GENERAL COMMITTEE                                             3

1      EXPRESSION OF INTEREST      OUTCOME    -   COOROY   RV   STOPOVER
       MANAGEMENT SERVICES                                                      3

2      132005.1133.07 REQUEST TO CHANGE A DEVELOPMENT APPROVAL FOR 145
       MULTIPLE DWELLING UNITS AND ASSOCIATED FACILITIES, SHOP,
       RESTAURANT, MULTI-FUNCTION ROOM AND GYM FOR 75 RESORT DRIVE,
       NOOSA HEADS                                                             14

3      RAL17/0501 DEVELOPMENT APPLICATION FOR RECONFIGURING A LOT (1
       LOT INTO 6 RESIDENTIAL LOTS), LOCATED AT 2 DAVID LOW WAY,
       CASTAWAYS BEACH                                                         48

4      REC16/0014 DEVELOPMENT PERMIT FOR RECONFIGURING A LOT, 1 LOT
       INTO 11 RESIDENTIAL LOTS, LOCATED AT 28 ELKHORN DRIVE, TEWANTIN         70

5      MCU16/0144 DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE
       OF PREMISES RETAIL BUSINESS TYPE 2 SHOP AND SALON AT 1 KINGSGATE
       DRIVE, TINBEERWAH                                                       81

6      PS17/0021 PLANNING & ENVIRONMENT COURT APPEAL NO 4595 OF 2017
       REFUSAL TO CHANGE ACTION NOTICE FOR SEALING OF SURVEY PLAN
       (STAGE 1) 191 HOLLETT RD, NOOSAVILLE                                   102

7      MCU17/0049 PLANNING & ENVIRONMENT COURT APPEAL D160 OF 2017
       REFUSAL OF DEVELOPMENT APPLICATION FOR HOME-BASED BUSINESS
       TYPE 3 (SWIM SCHOOL) AT 8 MCKENNA COURT, NOOSAVILLE                    106

8      ZERO EMISSIONS NOOSA ORGANISATIONAL ACTION PLAN                        109

9      ZEN - SOLAR SYSTEM SUPPLY & INSTALLATION - 1718Q043 STAGE 2            120

10     FINANCIAL PERFORMANCE REPORT - DECEMBER 2017                           126

CLOSED SESSION                                                             -




                                                                     Page 2 of 135

Section 3

GENERAL COMMITTEE MEETING AGENDA                                                           15 JANUARY 2018


REPORTS DIRECT TO GENERAL COMMITTEE
1                        EXPRESSION OF INTEREST OUTCOME - COOROY RV STOPOVER MANAGEMENT
                         SERVICES
DOCUMENT INFORM AT ION




Author                             Property Advisor, Denis Wallace
                                   Corporate Services Department

Index                              ECM/ Applications/MCU15/0003/VP16/0011/Property/17 Mary River Rd

Attachments                        1.    EOI Evaluation Summary Sheet
                                   2.    Submission Regarding the RV Stopover Operation



EXECUTIVE SUMMARY
Council established the Cooroy RV Stopover in 2015 to address an identified need to cater for
RV travellers in the Noosa hinterland. Council invested significant funds and resources to
establish and operate the stopover facility but patronage has been modest at best. A report to
Council in August 2017 indicated the current third-party management agreement to operate the
facility represents a poor financial outcome. A new Expression of Interest (EOI) process was
undertaken to seek new management proposals for the facility, with 5 submissions received from
a range of business and community entities.

Council’s EOI assessment panel scored the submission of the incumbent manager, Crimmins
Enterprises, highest and noted its management of the RV Stopover has been to a high standard
and met Council expectations. The panel considered Crimmins Enterprises to have an excellent
relevant track record and experience. Its submitted fee proposal represents a projected financial
saving of $9,015 over the existing management arrangement but the facility is still anticipated to
cost in the order $10,000 per annum to maintain.

The report considers alternate options for the Cooroy RV Stopover, including investment in new
amenities and facilities, Council management and closing the facility. The option presented by
the EOI outcome is preferred to allow the facility to remain open, whilst at the same time reducing
operating costs to contribute to Council’s ongoing financial sustainability. The EOI assessment
panel supports Crimmins Enterprises’ submission and it is recommended Council agree to enter
a new management agreement for a total term of up to 3 years.

RECOMMENDATION
That Council note the report by the Property Advisor to the General Committee Meeting dated 15
January 2018 regarding the expressions of interest process undertaken for management
services for the Cooroy RV Stopover and:
A.                       Agree to enter a new management agreement with Crimmins Enterprises for management
                         of the facility for an initial one (1) year term; and
B.                       Authorise the CEO to award two management agreement extensions of 1 year, subject to
                         satisfactory performance.




                                                                                               Page 3 of 135

Section 4

GENERAL COMMITTEE MEETING AGENDA                                               15 JANUARY 2018


REPORT
1.   Background
The purpose of this report is to provide the results of a recent Expression of Interest (EOI)
process for management services for Council’s Cooroy RV Stopover facility.
Council operates the Cooroy RV Stopover on freehold community land at 17 Mary River Road,
Cooroy. The facility was established in 2015 to address an identified need for RV travellers in
the Noosa hinterland. It was intended the facility would operate for a two year trial period and be
subject to a review.
The development approval obtained for the facility allows it to accommodate up to 40 fully self-
contained Recreational Vehicles (RV’s), subject to conditions that include:
   Maximum of 4 night stays;
   Requirement for an on-site caretaker;
   Disaster management requirements; and
   No on-site release of grey water or waste permitted.
Visitors are currently charged $10 per night per RV. Site improvements include a public waste
dump point, signage, access gates and access controls. Amenities are available on-site for the
caretaker only and all visiting RV’s must be fully self-contained. The facility is managed under a
third-party management agreement, the manager’s primary responsibilities are:
   Day-to-day operation of the facility in accordance with the development conditions and
     workplace health and safety requirements;
   Management of bookings and visitor fees;
   Appointment of on-site caretakers (for periods not exceeding 3 months);
   Providing summary reporting to Council on visitor numbers; and
   Enacting disaster management plan requirements (mainly in relation to rainfall events, as
     the site is within Cooroy Creek’s flood plain).
A report reviewing the performance of the RV Stopover was considered at Council’s August 2017
round of meetings. The report noted the facility:
   Achieves modest patronage, with 1,607 visitor nights recorded for FY2016/17 at an
     average of 5 RV’s per day;
   Operated at a loss of approximately $19k in 2016/17;
   Would require significant patronage increases to achieve cost neutrality under the current
     model; and
   Now competes with an alternate private facility established on the outskirts of Cooroy,
     known as the Cooroy No Worries RV Stop.
The report identified the current third-party management services arrangement, which involves
remuneration of $18,250 per annum plus 50% of visitor fees, as the facility’s primary cost. In
accordance with the report recommendation, Council resolved to explore ways to reduce the cost
of the management services via a new expression of interest (EOI) process.




                                                                                    Page 4 of 135

Section 5

GENERAL COMMITTEE MEETING AGENDA                                            15 JANUARY 2018


2.   Expressions of Interest
An EOI for Management Services for the Cooroy RV Stopover was advertised in the Noosa
News and Cooroy Rag and listed on Council’s website. A number of potentially interested parties
and community groups were also advised directly. Respondents were invited to submit
applications to LG Tenderbox, Council’s e-tender portal, with applications closing on 17 October
2017. The EOI supporting material comprised of:
   An EOI Invitation providing background and outlining the management services sought by
     Council;
   The facility’s MCU Development Approval;
   A schedule of operational and maintenance requirements;
   Visitor history data;
   Indicative schedule of annual interruption dates (i.e. Pony Club and Car Club event dates);
   Draft Management Agreement; and
   Site Disaster Management Plan.
There were 22 downloads of the EOI material from separate entities through the e-portal and 5
formal EOI submissions were received.
An evaluation panel comprising of Council property, governance and procurement staff reviewed
the submissions in accordance with the assessment criteria and obligations under Council’s EOI
processes. The panel’s summary evaluation spreadsheet is included as Attachment 1. Brief
discussion of the submissions is provided below.
   Ezy Adventures
The assessment panel noted the respondent’s relevant tourism industry experience but deemed
its submission to be non-conforming because provision of an on-site caretaker was not proposed.
Ezy Adventures propose to run the facility by a sole resident from Noosa Heads, which does not
comply with the EOI invitation and supporting material, including a number of identified
mandatory management responsibilities of critical importance.
   Cooroy Chamber of Commerce
The respondent was considered to have access to a network of local business and community
members and have reasonable capacity to undertake the management services. However, the
assessment panel had concerns with the proposed ongoing use of rostered volunteers to run the
site, uncertainty with the process to find and appoint caretakers and the Chamber’s lack of
relevant experience.
   Crimmins Enterprises Pty Ltd
The respondent is the incumbent manager of the RV Stopover and also manages Council’s
Boreen Point Camp Ground. The assessment panel noted Crimmins Enterprises’ management
of those facilities has been to a high standard and met Council expectations and considered the
respondent to have excellent relevant track record and experience.
   Glenbrae Operations Pty Ltd
The respondent operates the Cooroy No Worries RV Stop on the outskirts of Cooroy. The
assessment panel noted Glenbrae Operation’s facility is similar to Council’s, is understood to
have operated successfully for a number of years and is well regarded. The panel considered
the respondent’s relevant track record and experience to both be very good.
   Cooroy Future Group Inc.
The respondent was considered to have access to a network of local business and community
members and have reasonable capacity to undertake the management services. However, the
assessment panel had concerns with the proposed ongoing use of rostered volunteers to run the
site and the Group’s lack of relevant experience.

                                                                                 Page 5 of 135

Section 6

GENERAL COMMITTEE MEETING AGENDA                                                           15 JANUARY 2018


Fee Proposals
The management fee proposal (price) comprised half of the EOI assessment criteria weighting.
Based on 2016/17 visitation figures the fee proposals equated to:
                                    Cooroy           Crimmins                Glenbrae        Cooroy Future
                                 Chamber of         Enterprises             Operations              Group
                                  Commerce
Take of Fees                            100%                  100%                100%                50%
Annual Retainer                          $Nil                $5,000               $7,500           $18,000
Estimated Total
Remuneration: (based on              $16,070                $21,070             $23,570            $26,035
FY16/17 visitation)

3.       Options Review
The current management model represents one of a number of options available to Council.
Details and discussion of the primary options is provided below.
Option 1: Modified Management Model with New Cost Savings
The EOI process has resulted in potential cost savings for the management of the site. The
submission by the recommended respondent, Crimmins Enterprises, represents a saving of
$5,215 against the existing arrangements, based on:
                                                  Crimmins Enterprises’            Crimmins Enterprises’
                                                   existing management                    proposed new
                                                                 terms                management terms
Take of Fees:                                                            50%                         100%
Total Fee Take ($):                                                    $8,035                      $16,070
Annual Retainer:                                                      $18,250                       $5,000
Total Remuneration: (based on 2016/17                                 $26,285                      $21,070
visitation of 1,607 visitor nights)

In addition to this cost saving, the following further changes to the existing model are proposed:
 Council to cease using a proprietary 3rd party booking platform, licence costs for which are
   approximate $2,500 per year. RV Stopover manager to be responsible for its own booking
   arrangements.
 Public liability insurance to be the responsibility of the manager and no longer reimbursed by
   Council.
Both these responsibilities were incorporated in the EOI’s management model. A comparison of
the previous and posed trading position (using 2016/17 visitation figures) is detailed below.
Running Costs                                                           2016/17                  Proposed
Water supply (dump point and caretaker’s amenities)                      $1,000                     $1,000
Electricity supply (dump point and caretaker’s amenities)                $2,500                     $2,500
Fees for third party online booking system                               $2,500                         $-
Health Licence annual fee                                                $ 500                      $ 500
PL Insurance                                                             $1,300                         $-
Minor maintenance/civil                                                  $1,000                     $1,000
Total:                                                                   $8,800                     $5,000




                                                                                              Page 6 of 135

Section 7

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018


Estimated trading position:
    Profit / Loss                                  2016/17     Proposed
    Income
       Visitor fees retained by Council           $8,035            $-
    Expenses
       Managers’ retainer                       -$18,250       -$5,000
       Approximate Running costs                 -$8,800       -$5,000
    Total Profit/Loss                             -$19,015      -$10,000

The new management arrangement poses a forecast saving of approximately $9k over the
current trading position although does not achieve cost neutrality for the operation.
Option 2: Upgrade the Facility
Council has been approached to invest further in the RV Stopover to improve facilities and
increase visitation. A submission provided by proponents is included as Attachment 2.
Suggested improvements include:
     Open the Combined Coastal Car Club’s adjacent toilets & showers for use by the RV
      facility.
     Amend the development approval to delete the requirement for self-contained vehicles
      only.
         Provide BBQs.
         Establish a visitor information centre.
         Construct a pathway around the James Hardy building to connect to the Lower Mill area.
The Car Club has indicated it is supportive of the submission and the use of its toilets and
showers in principle, provided Council bears all costs for cleaning, maintenance, utilities and
repairs. The Club has also expressed a desire to negotiate greater flexibility for its own camping
use of the site.
Option 3: Dispense with 3rd Party Management
Council could consider abandoning the current management model and choose to appoint
caretakers directly and to collect fees either by the caretaker or an honesty box. This approach
would transfer management risks and responsibilities to Council.
Option 4: Close the Facility
This option presents the lowest financial risk. The Cooroy RV Stopover has not reached cost
neutrality through 2½ years of operation and EOI options do not provide potential to achieve that
outcome. The facility achieves only modest patronage and it is notable that a new private RV
stop has established on Cooroy’s outskirts since Council decided to address the lack of RV
facilities in the area.
It is recommended Council reappoint the facility manager under a new management
arrangement to achieve cost savings, as identified in Option 1. This option is preferred because
it:
        Maintains operation of the facility and reduces Council’s costs;
        Provides professional management of the facility and adheres to Council’s development
          approval obligations; and
        Allows the manager to retain 100% of the visitor fees, which should incentivise the
          promotion of the RV Stopover by the manager.




                                                                                    Page 7 of 135

Section 8

GENERAL COMMITTEE MEETING AGENDA                                               15 JANUARY 2018


Options 2 – 4 are not preferred because:
   The provision of amenities and investment in new facilities would result in ongoing
     additional operating costs to ratepayers (i.e. operations, maintenance and depreciation);
   Changes to provision of amenities and allowing self-contained RV’s raises conflicts with the
     site’s development approval and are not supported by Planning Assessment; and
     The facility plays a role in Cooroy’s visitor facilities and the estimated annual cost of the
       current operation is considered modest and supportable.
It is recommended Council agree to enter a 1 year management services agreement with
Crimmins Enterprises with the potential for 2 x 1 year extensions subject to satisfactory
performance and mutual agreement of the parties. The management agreement drafted
incorporates amendments to the management model and will achieve the cost savings detailed
in this report.
Previous Council Consideration
Ordinary Meeting Minutes, 28 August 2014, Item 6, Page 17
Council note the report by the Executive Officer to General Committee Meeting dated 25 August
2014 relating to the provision of a recreational vehicle (RV) stopover area, waste dump point and
associated facilities at Cooroy, and request staff to:
A.   Enter into formal negotiations with the Combined Coastal Car Club to allow for a 12 month
     trial for an RV Stopover utilising the open space included in the Club’s permit to occupy
     over part of Lot 1 SP242414, 17 Mary River Road, Cooroy;
B.   Submit an application for material change of use to allow temporary use of the site for up to
     2 years by fully self-contained compact recreational vehicles (excluding big rigs over 12.5
     m in length), subject to satisfactory arrangements being made with the Combined Coastal
     Car Club;
C.   Develop a detailed minimum design and associated estimate of costs for a waste dump
     point and associated facilities to be located within Lot 1 SP242414, 17 Mary River Road,
     Cooroy (as per Figure 2 outlined in the report), together with associated directional and
     user signage with a view to a request for funding being submitted to the quarterly budget
     review process to allow construction to occur during 2014-15;
D.   Prepare a feasibility assessment of the project to ensure that all financial and risk issues
     are addressed including the approach to the management model for the 12 month trial; and
E.   Investigate options and estimated costs to provide parking spaces for long “recreational”
     vehicles in close proximity to Cooroy town centre and revisit usage of the Council freehold
     land opposite Cooroy Library for an interim parking area for longer vehicles until a
     permanent solution can be implemented.


Ordinary Meeting Minutes, 4 June 2015, Item 4, Page 15
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 26 May 2015 regarding Application No. MCU15/0003 for a
Development Permit for a Self-Contained RV Stop & Waste Dump Point situated at 17Mary River
Road, Cooroy and:
A.   Approve the application subject to the conditions and grounds for approval contained in the
     Planning & Organisation Committee Agenda dated 26 May 2015 with the deletion of
     condition 11 and amendments to conditions 13 and 16 to read as follows:
     13.   To ensure the safety of visitors, the site must be managed by a caretaker.




                                                                                     Page 8 of 135

Section 9

GENERAL COMMITTEE MEETING AGENDA                                                     15 JANUARY 2018


       16.    The vehicle access road, passing bays, access driveways and waste dump point
              must be constructed generally in accordance with the approved plans. These works
              must be completed prior to the commencement of the use.
B.     Reaffirm Council’s position that the Combined Coastal Car Club and Cooroy Horse & Pony
       Club’s needs for use of the site will be given priority, with the area in front of club house
       and the first access driveway only used on an as needs basis after consultation with the
       Combined Coastal Car Club.
Ordinary Meeting Minutes, 17 August 2017, Item 2, Page 8
That Council note the report by the Property Advisor to the Services & Organisation Committee
Meeting dated 8 August 2017 and proceed to an Expression of Interest process for management
of Council’s RV Stop facility at 17 Mary River Road, Cooroy (Lot 1 SP242414), as detailed in the
report.

Finance
The report outlines the financial implications of Council’s options for the Cooroy RV Stopover.
Community requests to provide new amenities and facilities have not been quantified through
detailed cost benefit analysis but would likely involve considerable whole of life costs to
ratepayers.

Risks & Opportunities
The recommended option will allow Council to meet broad Cooroy community expectation by
continuing to provide the RV Stopover facility. The report identifies some community desire for
Council to invest further in the facility, but this is considered to significantly increase Council’s
financial and development compliance risks. Options associated with remote or abandoned
management of the facility would also create significant development compliance and disaster
management risks and this is considered unacceptable.

Consultation
External Consultation - Community & Stakeholder
The report details a submission made by proponents for changes to the RV Stopover. The
President of the Combined Coastal Car Club was approached for feedback on the submission.
Internal Consultation
   Procurement Advisor
   Governance Advisor
   Property Manager
   Community Development Manager
   Property Officer
Departments/Sections Consulted:

     Chief Executive Officer   X   Community Services                      X   Corporate Services
     Executive Officer         x   Community Development                       Financial Services
     Executive Support             Community Facilities                        ICT
                                   Libraries & Galleries                   x   Procurement & Fleet
                                   Local Laws                              x   Property
                                   Waste & Environmental Health                Revenue Services

X    Executive Services            Environment & Sustainable Development       Infrastructure Services
     Community Engagement          Building & Plumbing Services                Asset Management
     Customer Service              Development Assessment                      Buildings and Facilities
x    Governance                    Economic Development                        Civil Operations
     People and Culture            Environmental Services                      Disaster Management
                                   Strategic Land Use Planning                 Infrastructure Planning,
                                                                               Design and Delivery


                                                                                            Page 9 of 135

Section 10

ATTACHMENT 1




 Page 10 of 135

NOOSA SHIRE COUNCIL — Weighted Attribute Evaluation Spreadsheet - Final Evaluation
                             ee                                                                                                                                                                                                            ATTACHMENT 1

              NAME OF TENDERER                                                 PRICE
              (Conforming Tenders Only)                                    (excl of GST)
           1
           2
           3
           4
           Sp
           6
           Tp
           Sf
           Od
           MO
              NON-CONFORMING TENDERS
                                                                       |
                                                                                 1                    2                    3                   4                   5                   6                  7                   8                   9                  10
| RattA=Nonocecetemente                                               |         merce      Lommastermracs | UVa |                         Gompme       |                   |   FT
                              PARTA- Non price elements                     Commerce         Gimmins Enterprises        Pry lid            Grouyp Inc
                             LORI A- Non price cements.
                                                                                     ant score!        Resultant               i                Resultant           Resultant           Resultant           Resultant          Resultant           Resultant           Resultant
              Evaluation Giteria                      Weighting (%)                   St                score x                are               score x             score X             score x            score x             score X             score x             score x
                                                                                   x weighting            ‘ghtin;           x weighting          weightin              ight in          weightin;             ightins           weightin              ightin;            ightin

              Undertakings
              Emmissions Control Measures                   ve            40          00        70         50        60         00         °
                                                                                    2.                    Ja                  3.          2

              oa etna Sor                           Ee                            a                 a
                          Son            ane
                                a                                      OY [amor                                         [OE]               Se           | Pd
                               HARI     rie komen                         wdamece          [Omni       eerwtes |       Rene         |     Gok          |
              ‘Total Fees (Pc)                              50%               $16,070              $21,070              $23,570             $26,035               so                                      $o
              Average Fees (Pav) $......0.0c0c0cccceeee   $21,686
              Price Score                                                       126                  103                  91                   80                  0                                      0
              Normalised Price Score (Pn)                                       100                   82                  73                  64                   0                                      0
              Weighted Price Score (Pw)

                                                                                                                                                 The Contract Administrator confirms the above scores
                   Contract Administrator & Assesment Panel Member 1                                                                                     and weightings of this evaluation                          Ba
                              Assesment Panel Member 2                                Govermance Advisor (PW)
                              Assesment Panel Member 3                                                                                                Contract Administrator's signature:
                              Assesment Panel Member 4                                 Proiperty Manager (C1)
                              Assesment Panel Member 5                 pe

                                                                                                                                                                                                                                              Page 10 of 135

Section 11

GENERAL COMMITTEE MEETING AGENDA   15 JANUARY 2018


                                    ATTACHMENT 2




                                     Page 11 of 135

GENERAL COMMITTEE MEETING AGENDA                                  15 JANUARY 2018

                                                                   ATTACHMENT 2
          REPORT TO NOOSA COUNCIL ON RV PARK AT COOROY.

  This report is submitted by Doug Claydon and Ray Kelly in conjunction with the
  Cooroy Chamber of Commerce as concerns raised at a meeting of deputy
  mayor and 3 other councillors about the RVpark at Cooroy. The council
  members requested that Ray and Doug consult with the Car Cub and Pony Club
  regarding any issues they may have, this has been done. The main RVissue is
  the not having toilet facilities open for use by the RVpark users. The RV park is
  not operating at peak performance as the number of RVs that are turned away
  because of the requirement of having to be self-contained vehicles. This could
  increase the usage if the toilets were opened and the words self
5	1	1	1	12	13	1780	1257	219	40	96	contained
4	1	1	1	13	0	317	1334	1758	50	-1	
5	1	1	1	13	1	317	1334	176	40	96	vehicles
5	1	1	1	13	2	508	1334	113	50	95	only
               definition deleted from the signage and brochures. The proposal
  is for the toilet block to be opened for RVuse. The shower are to be locked
  and have a key, digital button or a card system for entry and the showers have
  a coin operated or card system , so user pays. The cleaning would be done by
  council or contractors/ caretakers. The other issues that a BBQ area be
  established within the grounds for use by all who use the grounds .A tourist
  information centre be set up until such time as the transit centre is built at the
  railway station on the eastern side of Cooroy or a proposed service station at
  the highway. Railway has been ongoing for years and may be for another
  number of years. This would be a great short term to fill the void in Cooroy for
  tourist information. This centre could be a stepping off point for introduction
  to the caravan parks of the Noosa Shire for longer stays in the Noosa Shire.
  Signage would have to be placed for direction to the Information Centre
  around the town of Cooroy. The main complaint about Information Centres
  around Australia is access with RVs , this RV stop is an ideal position to
  accommodate RVs. This information centre would be run with volunteers and
  Tourism Noosa. One concern raised by the clubs is the rallies held by the RV
  clubs the numbers should be relaxed and the RVstopover would be closed for
  that time the rally is taking place. The other issues listed below by the clubs.
  Submitters ask council to consider their concerns and grant the requests by
  the clubs in whole community spirit.
  The Submitters have many years’ experience in RV activities Doug has owned a
  RV and travelled around Australia and NZ Ray has been a caravan park

                                                                     Page 11 of 135

Section 12

GENERAL COMMITTEE MEETING AGENDA   15 JANUARY 2018




                                     Page 12 of 135

GENERAL COMMITTEE MEETING AGENDA                                 15 JANUARY 2018

 operator at Pine trees in Hasting st for 8 years and been one of the first to
 introduce electric brakes for the caravan industry in the seventies and has
 been caravanning since retirement in 2008.

 We ask council to seriously consider our submission
 Issues raised at the Car Meeting
 Permit to occupy needs to be updated to include use rights on the land and
 the boundary for RVpark. There may be some condition that if a big event
 such as caravan , car rally , horse show . The whole ground may be available.
 The need to mention utilities such as water ,power, electricity cost should be
 at council expense.
 A BBQ area should be established in the grounds.
 Car club to give min of 6 weeks’ to 10 weeks’ notice ? to hold an event so RV
 park can be closed. Or 12 months events calendar.
  The use of the showers by the R’ V Park on a pay as you use basis
  Car club has storage in the toilets this needs to change with some help to have
 a storage container on site.
 Car Oub to consider a small part of their building to lease out as an
 Information centre and use of the veranda
 Max stay 4 nights , Max R/ Vis 40 unless there is a large an event to take place.
 Use of the toilets by the car , pony , Cooroy rag at free of charge ?
  Toilets to be maintained and cleaned and grounds mowed by
 council/ caretaker.
 Issues Raised At the Pony Club Meeting.
 The movement of the RVvehicles when pony and car club events are in
 progress and the gate has that issued resolved so now not an issue.

                                                                     Page 12 of 135

Section 13

GENERAL COMMITTEE MEETING AGENDA   15 JANUARY 2018




                                     Page 13 of 135

GENERAL COMMITTEE MEETING AGENDA                                   15 JANUARY 2018

  The pony club raised the utilities issue of the electricity , that council pay for
  the RV, Car Club water account and the pony club if metered would pay for
  their water.
  There is a restriction by council to limit the number of RV Vehicles which is fine
  for the RVpark operation but at least twice or more a year caravan clubs ,
  motor home clubs have a rallies and pony club have week and weekend
  schools which attract large horse floats with RV facilities and need to take up
  some of the other side of their grounds for parking of these vehicles. With
  greater number of vehicles they can no longer be permitted by council because
  of the increase numbers. The pony club and the car club cater for these events
  to help with fund raising. This fund raising should remain with the clubs and
  not to council and it should be noted that the car club make generous
  donations to the community and would create goodwill toward council.
  The other suggestion for council consideration is a pathway around the back
  of Ritek, does not have to be concrete / bitumen just crusher dust because the
  area floods so you just place another load of crusher dust lot cheaper and is
  done all round Australia particular in flood prone areas. The path would
  continue to join up with the pathway to the library and town centre.
  The receipts from July to date is approx $50,000.00 of monies spent in Cooroy
  and districts. This being about 30% of the expenditure because many RV
  people did not place receipts in the container , forgot or got thrown away or
  did not request one. This has been verified by the recent caretaker.
  The submitters met with the car club on 3 occasions and the pony club once as
  per instruction by the councillors we met at the grounds back late last year
  and February 20017
  We the submitters request council to consider the submissions and process the
  implementation for the benefit of the whole shire and to be put on the map as
  being a really RV friendly town.

  Doug Oaydon                                   Ray Kelly

                                                                      Page 13 of 135

Section 14

GENERAL COMMITTEE MEETING AGENDA                                                                 15 JANUARY 2018


2                        132005.1133.07 REQUEST TO CHANGE A DEVELOPMENT APPROVAL FOR 145
                         MULTIPLE DWELLING UNITS AND ASSOCIATED FACILITIES, SHOP, RESTAURANT,
                         MULTI-FUNCTION ROOM AND GYM FOR 75 RESORT DRIVE, NOOSA HEADS
DOCUMENT INFORM AT ION




Author                              Coordinator Planning, Patrick Murphy
                                    Environment and Sustainable Development

Index                               ECM/ Application/ 132005.1133.07

Attachments                         1.    Current approved plans
                                    2.    Proposed plans


         APPLICATION DETAILS
         Applicant                                Altum Constructions
         Proposal                                 Material Change of Use - Change to Development Approval
         Properly Made Date                       29 November 2017
         Decision Due Date                        4 January 2018


         PROPERTY DETAILS
         Property Address                         75 Resort Drive, Noosa Heads
         RP Description                           Lot 7 SP178340 (formerly Lot 3 SP221524 & Lot 3 SP 178323)
         Land Area                                4.262ha
         Existing Use of Land                     Vacant: vegetation has been removed and earthworks associated with
                                                  approval have commenced


         STATUTORY DETAILS
         SEQRP Designation                        Urban Footprint
         Locality                                 Noosa Heads
         Zone                                     Semi-Attached Housing
         Overlays                                 Environmental Enhancement Area
                                                  Low Potential Acid Sulphate Soils
                                                  Landslide Hazard Areas
                                                  Medium Bushfire Hazard Area
         Assessment Type                          Change to Approval



RECOMMENDATION
That Council note the report by the Coordinator Planning to the General Committee Meeting
dated 15 January 2018 regarding Application No. 132005.1133.7 for a Development Permit for a
Material Change of Use for a Resort of 145 Multiple Dwelling Units and Associated Facilities -
Shop, Restaurant, Multi-Function Room and Gym situated at 75 Resort Drive Noosa Heads, and
A.                       Amend the description of the development in the Decision Notice to read Material Change
                         of Use for 137 Multiple Dwelling Units and Associated Facilities – Shop, Restaurant, Multi-
                         Function Room and Gym.




                                                                                                     Page 14 of 135

Section 15

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018


B.   Agree to change conditions 1, 2, 8, 33, 47, 64, 72, 81, and 83 as follows:
     1.   Prior to the issue of an operational works approval for civil works for each stage of
          the development, fully detailed architectural proposal plans relevant to each stage
          must be submitted for Council approval. Detailed plans must provide the following
          details as a minimum:
          1.1   Full architectural building elevations;
          1.2   Detailed roof plans and ground level contours demonstrating compliance with
                the development’s 8m/12m building height limits above natural and finished
                ground levels;
          1.3   Landscaping areas demonstrating compliance with Condition 5 herein;
          1.4   The location of proposed stormwater management/treatment devices;
          1.5   Consistency with all management plans for the development;
          1.6   Building colour schemes demonstrating compliance with Condition 8 herein; &
          1.7   Vehicle manoeuvring areas and temporary turning provisions.
     2.   Development undertaken in accordance with this approval must generally comply
          with the approved plans of development. The approved plans are listed below and
          are as amended by the conditions herein.
            Plan No.       Rev.   Plan/Document Name                                     Date
            7038-DA01      12     Altum Constrcutions Masterplan Noosa Springs           03-11-17
                                  Resort prepared by Blackburne Jackson Design
            7038-DA03      10     Carparking/Basement       prepared   by   Blackburne   29-09-17
                                  Jackson Design
            7038-DA04      11     Ground Floor prepared by Blackburne Jackson            29-09-17
                                  Design
            7038-DA05      10     First Floor prepared by Blackburne Jackson Design      29-09-17
            7038-DA06      10     Second Floor prepared by Blackburne Jackson            03-11-17
                                  Design
            7038-DA07      08     Site Section prepared by Blackburne Jackson            29-09-17
                                  Design
            7038-DA08      09     Site Section prepared by Blackburne Jackson            29-09-17
                                  Design
            7038-DA09      14     Indicative  Apartment   Layouts       prepared   by    29-09-17
                                  Blackburne Jackson Design
            7038-DA10      12     Indicative  Apartment   Layouts       prepared   by    29-09-17
                                  Blackburne Jackson Design
            7038-DA11      08     Perspective sketches      prepared   by   Blackburne   29-09-17
                                  Jackson Design
            7038-DA12      08     Perspective sketches      prepared   by   Blackburne   29-09-17
                                  Jackson Design
            7038-DA13      07     Overall staging    plan   prepared   by   Blackburne   29-09-17
                                  Jackson Design
            7038-DA14      06     Finishes Palette prepared by Blackburne Jackson        29-09-17
                                  Design
            7038-DA15      06     Resort Facilities Floor Plan prepared by Blackburne    29-09-17
                                  Jackson Design


                                                                                    Page 15 of 135

Section 16

GENERAL COMMITTEE MEETING AGENDA                                        15 JANUARY 2018


        7038-DA16   05   Facilities Elevations   prepared    by     Blackburne   29-09-17
                         Jackson Design
        7038-DA17   03   Indicative  Apartment   Layouts      prepared      by   29-09-17
                         Blackburne Jackson Design
        7038-DA19   06   Building 15 Elevations prepared by Blackburne           29-09-17
                         Jackson Design
        7038-DA20   06   Block 18 Elevations      prepared   by     Blackburne   29-09-17
                         Jackson Design
        7038-DA21   06   Building 3 Elevations prepared by Blackburne            29-09-17
                         Jackson Design
        7038-DA23   06   Block 2 Elevations prepared by Blackburne Jackson       29-09-17
                         Design
        7038-DA24   02   Block 15 Sections prepared by Blackburne Jackson        06-06-17
                         Design
        7038-DA25   03   Block 18 Sections prepared by Blackburne Jackson        29-09-17
                         Design
        DD1.1       F    Location Plan prepared by Sparks Architects             08-06-2017
        DD1.2       F    Site Plan prepared by Sparks Architects                 08-06-2017
        DD1.3       H    Unit Type 1 prepared by Sparks Architects               08-06-2017
        DD1.4       H    Unit Type 2 prepared by Sparks Architects               08-06-2017
        WD1.8       E    Ground Floor Plan Block 7 prepared by Sparks            23-08-2017
                         Architects
        DD1.6       E    First Floor Plan Block 7 prepared by Sparks             08-06-2017
                         Architects
        DD1.7       D    Roof Plan Block 7 prepared prepared by Sparks           08-06-2017
                         Architects
        DD1.8       E    Ground Floor Plan Block 8 prepared by Sparks            08-06-2017
                         Architects
        DD1.9       E    First Floor Plan Block 8 prepared by Sparks             08-06-2017
                         Architects
        DD1.10      D    Roof Plan Block 8 prepared by Sparks Architects         08-06-2017
        DD1.11      E    Ground Floor Plan Block 9 prepared by Sparks            08-06-2017
                         Architects
        DD1.12      E    First Floor Plan Block 9 prepared by Sparks             08-06-2017
                         Architects
        DD1.13      D    Roof Plan Block 9 prepared by Sparks Architects         08-06-2017
        WD2.1       B    Elevations prepared by Sparks Architects                23-08-2017
        WD2.2       B    North Elevations Block 7 prepared by Sparks             23-08-2017
                         Architects
        WD2.3       B    East Elevations Block 7 prepared by Sparks              23-08-2017
                         Architects
        WD2.4       B    South Elevations Block 7 prepared by Sparks             23-08-2017
                         Architects
        WD2.5       B    West Elevations Block 7 prepared by Sparks              23-08-2017
                         Architects
        WD2.6       B    Elevations Block 8 prepared by Sparks Architects        23-08-2017

                                                                            Page 16 of 135

Section 17

GENERAL COMMITTEE MEETING AGENDA                                         15 JANUARY 2018


        WD2.7       B    Elevations Block 9 prepared by Sparks Architects        23-08-2017
        DD3.1       D    Sections Block 7 prepared by Sparks Architects          08-06-2017
        DD3.2       B    Section Block 7 prepared by Sparks Architects           08-06-2017
        DD3.3       D    Section Block 8 prepared by Sparks Architects           08-06-2017
        DD3.4       D    Section Block 9 prepared by Sparks Architects           08-06-2017
        DD4.1       G    3D prepared by Sparks Architects                        08-06-2017
        DD4.2       G    3D prepared by Sparks Architects                        08-06-2017
        DD4.3       G    3D prepared by Sparks Architects                        08-06-2017
        DD4.4       G    3D prepared by Sparks Architects                        08-06-2017
        DD4.5       G    3D prepared by Sparks Architects                        08-06-2017
        DD4.6       G    3D prepared by Sparks Architects                        08-06-2017
        DD4.7       G    3D prepared by Sparks Architects                        08-06-2017
        7088_A01-   04   CTS 400 Site Plan – Level 1 prepared by Blackburne      03-10-17
        10_04            Jackson Design
        7088_A01-   B    CTS 100 Site Plan – Level 1 prepared by Blackburne      03-10-17
        21_B             Jackson Design
        7088_A01-   B    CTS 300 Site Plan – Level 1 prepared by Blackburne      03-10-17
        31_B             Jackson Design
        7088_02-    11   Facilities Building Level 1 – Floor Plan prepared by    03-10-17
        01_11            Blackburne Jackson Design
        7088_02-    10   Facilities Building – Roof     Plan   prepared     by   03-10-17
        02_10            Blackburne Jackson Design
        7088_A02-   C    Block 15 Basement Level – Floor Plan prepared by        04-09-17
        30_C             Blackburne Jackson Design
        7088_A02-   D    Block 15 Level 1 – Floor Plan prepared by               04-09-17
        31_D             Blackburne Jackson Design
        7088_A02-   D    Block 15 Level 2 – Floor Plan prepared by               04-09-17
        32_D             Blackburne Jackson Design
        7088_A02-   D    Block 15 Level 3 – Floor Plan prepared by               04-09-17
        33_D             Blackburne Jackson Design
        7088_A02-   C    Block 15 – Roof Plan prepared by Blackburne             04-09-17
        34_C             Jackson Design
        7088_A02-   F    Block 3 Basement Level – Floor Plan prepared by         03-10-17
        01_F             Blackburne Jackson Design
        7088_A02-   E    Block 3 Level 1 – Floor Plan prepared by Blackburne     03-10-17
        02_E             Jackson Design
        7088_A02-   D    Block 3 Level 2 – Floor Plan prepared by Blackburne     03-10-17
        03_D             Jackson Design
        7088_A02-   E    Block 3 Level 3 – Floor Plan prepared by Blackburne     03-10-17
        04_E             Jackson Design
        7088_A02-   C    Block 3 – Roof Plan prepared by Blackburne              03-10-17
        05_C             Jackson Design
        7088_A02-   C    Block 16 Basement Level – Floor Plan prepared by        04-09-17
        90_C             Blackburne Jackson Design
        7088_A02-   D    Block 16 Level 1 – Floor Plan prepared by               04-09-17

                                                                            Page 17 of 135

Section 18

GENERAL COMMITTEE MEETING AGENDA                                            15 JANUARY 2018


         91_D                  Blackburne Jackson Design
         7088_A02-      D      Block 16 Level 2 – Floor Plan prepared by             04-09-17
         92_D                  Blackburne Jackson Design
         7088_A02-      D      Block 16 Level 3 – Floor Plan prepared by             04-09-17
         93_D                  Blackburne Jackson Design
         7088_A02-      C      Block 16 – Roof Plan prepared by Blackburne           04-09-17
         94_C                  Jackson Design
         7088_A04-      07     Elevations prepared by Blackburne Jackson Design      03-10-17
         01_07
         7088_A04-      D      Block 15 - Elevations prepared by Blackburne          04-09-17
         10_D                  Jackson Design
         7088_A04-      D      Block 15 - Elevations prepared by Blackburne          04-09-17
         11_D                  Jackson Design
         7088_A04-      D      Block 3 - Elevations prepared by Blackburne           03-10-17
         01_D                  Jackson Design
         7088_A04-      D      Block 3 - Elevations prepared by Blackburne           03-10-17
         02_D                  Jackson Design
         7088_A04-      D      Block 16 - Elevations prepared by Blackburne          04-09-17
         30_D                  Jackson Design
         7088_A04-      D      Block 16 - Elevations prepared by Blackburne          04-09-17
         31_D                  Jackson Design
         7088_05-       06     Sections prepared by Blackburne Jackson Design        03-10-17
         01_06
         7088_A05-      C      Block 15 - Sections prepared by Blackburne Jackson    04-09-17
         10_C                  Design
         7088_A05-      C      Block 16 - Sections prepared by Blackburne Jackson    04-09-17
         15_C                  Design
         7088_AA05-     03     Sections prepared by Blackburne Jackson Design        29-05-17
         20_03
         7088_AO17-     01     Facilities Buildings Perspectives    prepared    by   19-05-17
         01_01                 Blackburne Jackson Design
         7088_AO17-     01     Quarry Café Views prepared by Blackburne Jackson      19-05-17
         03_01                 Design
         7088_AO17-     02     Parkside Residences     prepared    by   Blackburne   06-06-17
         03_02                 Jackson Design
         7088_AO17-     02     Parkside Terrace 15     prepared    by Blackburne     29-09-17
         04_02                 Jackson Design
         7088_AO17-     02     Parkside Terrace 15     prepared    by Blackburne     29-09-17
         05_02                 Jackson Design
         7088_AO17-     02     Parkside Residences 3 prepared by Blackburne          06-06-17
         06_02                 Jackson Design

   8.   The development’s external colour scheme shall use muted environmental tones of
        browns, greens and greys to integrate the development with its landscape setting and
        ensure the development does not visually impact on the vegetated skyline. All
        buildings shall utilise the finishes palette detailed on Plan 7038- DA14 Issue 06 Dated
        29-09-17. The use of paint finish Taubmans Tahira White is to be minimised.




                                                                                Page 18 of 135

Section 19

GENERAL COMMITTEE MEETING AGENDA                                                                15 JANUARY 2018


   33.   Carparking shall be provided within the site generally as shown on the approved
         plans. Carparking shall include 285 carpark spaces with 250 of these to be covered
         carpark spaces, and include 10 clearly defined disabled carpark spaces for the unit
         component of the development. Five carparking spaces for staff in addition to
         resident and visitor spaces are to be provided on site. Visitor and staff carparking,
         including all at grade car parking situated between Blocks 2 and 3 must be
         maintained in common property and be available to all units. Motorcycle/scooter
         parking spaces may be incorporated at a rate of 4 spaces equivalent to 1 car space.
   47.   All stormwater drainage shall be managed so that:
         a.     there is no net increase in 1 year ARI peak stormwater flows from the site at
                any stage of the development that will cause scour at any point in the receiving
                environment. Where there is an increase in 1 year ARI peak stormwater flows,
                a Hydraulic Engineer must certify that the increase will not be responsible for
                any scour in the receiving environment; and
         b.     the discharge of stormwater from construction or completed stages of the site
                does not affect the approved design residence time of the Noosa Springs Golf
                Course lake system.
   64.   Monetary contributions shall be paid to Noosa Council towards the cost of providing
         and/or upgrading various infrastructure at the rates applicable at the time of
         payment. An estimate only of the amended contribution amounts relating to this
         “Change to an Existing Approval” dated 18 January 2018 under the Council policies
         and requirements applied on the original approval is outlined in the table below:
                              PSP12 –
                              Public    Open
                              Space
                              Contributions                           PSP17       –   PSP20       –   TOTAL
                                                      PSP16       –
                                                                      Water           Pathway
          Contribution                                Sewerage                                        Contribution
                              (Not applicable in                      Supply          Trunk
          Required For:       accordance      with    Headworks                                       Amount per
                                                                      Headworks       Network
                              Council        letter   Contributions                                   Stage
                              dated 24 January                        Contributions   Contributions
                              1996 and Council
                              Decision    of      1
                              November 2007)

          Stage CTS 100       $0                      $51,653         $173,751        $27,538         $252,942
          Stage CTS 200       $0                      $17,315         $57,735         $8,919          $83,969
          Stage CTS 300       $0                      $32,283         $108,935        $17,211         $158,429
          Stage CTS 400       $0                      $8,516          $23,239         $3,599          $35,354
          Resort Facilities
          Stage CTS 500       $0                      $39,033         $129,632        $20,002         $188,667
          Stage CTS 600       $0                      $17,756         $59,914         $9,466          $87,136
          Stage CTS 700       $0                      $18,929         $63,182         $9,779          $91,890
          Stage CTS 800       $0                      $17,756         $59,914         $9,466          $87,136
          Stage CTS 900       $0                      $14,527         $49,021         $7,745          $71,293

          TOTAL
          Contribution        $0                      $217,768        $725,323        $113,725        $1,056,816
          Amount =

          Please note that these amounts are all subject to variations in the Consumer Price Index, All
          Groups Brisbane from September 2017 until the date of payment.

         All contributions must be paid prior to commencement of the use.
         Water Supply and Sewerage contributions are payable directly to Unitywater.

                                                                                                  Page 19 of 135

Section 20

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018


   72.   The development must provide waste storage and disposal facilities in accordance
         with Planning Scheme Policy 9, Waste Management, including:
         a.   an external imperviously paved area correctly sized for all refuse and recycling
              containers and suitably screened from public places and neighbouring
              properties.
         b.   a bin wash area with a cold-water tap, hose and drain outlet connected to
              sewer, via a bucket trap. The drain outlet is to be designed to prevent storm
              water entry to the sewerage system which can be achieved by a bunded area,
              with a nib wall height of 100mm maximum, enclosing a wash area of 700mm x
              700mm minimum (max 0.7m²). Alternatively, the waste area can be roofed, or
              another appropriate design approved by Council.
   81.   Noise emission from mechanical equipment (air conditioners, refrigeration equipment,
         or pool pumps etc) shall comply with the following requirements:
         a.   A person must not use equipment on any day if it makes or causes noise to be
              made:
              i.     From 10pm to 7am: Not more than the higher of either:
                      a.      40 dB(A)
                      b.      3 dB(A) above the background noise level
                      No audible noise for pool pumps apply during these hours
              ii.    From 7am to 7pm: Not more than the lower of either:
                     a. 50 dB(A)
                     b. dB(A) above the background noise level
              iii.    From 7pm to 10pm:
         b.   Not more than 3 dB(A) above the background noise level.
   83    The development shall comply with the noise management strategies contained in
         the report prepared by Ron Rumble Pty Ltd and dated November 2006, with the
         following additional details to be provided prior to issue of Operational Works to the
         reasonable satisfaction of Manager, Environmental Health Noosa Council: -
         83.1 The necessary and appropriate noise control measures incorporated into the
              façade of the apartments and within the restaurant. These measures shall
              include:
              83.1.1       Upgraded glazing and air-conditioning to the potentially affected
                           apartments;
              83.1.2       Strategically placed wing walls on balconies to screen the apartment
                           and balconies from alfresco dining areas;
              83.1.3       Installation of a roof over the outdoor dining area with absorption to the
                           underside should be explored;
              83.1.4       Revised hours of operation to no later than midnight;
         83.2 Formulate and implement a Noise Management Plan to deal with noise
              emissions from the premises including patron noise.
         83.3 The applicant must advise prospective purchasers that a noise management
              plan has been prepared to manage noise emissions related to the
              development.
         83.4 The Noise Management Plan referred to in Condition 83.2 shall be incorporated
              in perpetuity in the By-Laws of the Body Corp for the building.

                                                                                    Page 20 of 135

Section 21

GENERAL COMMITTEE MEETING AGENDA                                             15 JANUARY 2018


           83.5 The Noise Management Plan shall include a process for dealing with
                complaints and specify that the Restaurant Management and Body Corp
                Manager be responsible for dealing with any noise complaints.
C.   Refuse to amend conditions 4 and 96.
D.   Delegate the powers of Council under the Planning Act 2016 for minor change applications
     for this development to the Chief Executive Officer.
E.   Note that the report is provided in accordance with Section 63(5) of the Planning Act, 2016.


REPORT
1.   PROPOSAL
The application seeks approval to change the approved plans for the development of Precinct F
of Noosa Springs.
The applicant has provided the following schedule of changes to the plans:
   It is proposed to change the description of the development to reflect the proposed
     reduction in dwelling unit numbers anticipated by this permissible change request. The new
     description of development will be as follows:-
     Material Change of Use – 137 Multiple Dwelling Units and Associated Facilities –
     Shop, Restaurant, Multi- Function Room and Gym
   Reduce the overall number of dwelling units from 145 to 137;
   Amend the overall number of persons from 426.5 to 425.6. This proposed density remains
     consistent with the anticipated density under the Noosa Plan of 100 persons / hectare (i.e.
     4.262ha x 100 = 426.2 persons);
   Minor increase in overall gross floor area from 20.046.5m2 to 20,083m2 (nb. the original
     approved GFA was 21,950m2);
   Minor redesign of central communal facilities, wherein such changes are generally
     contained to the arrangement of ‘back of house’ servicing facilities, with no significant
     changes to either the scale or the external appears of the built form;
   Rationalisation of pedestrian networks across the development;
   Minor amendments to the driveway and parking arrangements in the southern part of the
     site to achieve access arrangements and reflect other changes proposed in Precinct E2. It
     is recognised that the amendments to the driveway will also necessitate a consequential
     amendment to the approval over the adjacent Precinct E2 (Council Ref: MCU15/0109).
   Minor amendments to the orientation of unit blocks 13 and 14 to increase the efficiency of
     the layout and function of these buildings;
   Introduction of a new 3 bedroom unit type into Block 14 and 3 new unit types into Block 2;
   Minor variations to the building heights generally as follows:-
     o    Block 3 – the height of this building has been increased by approximately 350mm
          generally as a consequence of minor changes to the floor to floor heights of individual
          levels of the building. The purpose of this change in floor to floor heights was to
          introduce greater acoustic treatment between levels. Notwithstanding this change,
          the overall building height remains below 12m;
     o    Blocks 16 and 17 – the floor to ceiling heights of individual levels has increased
          slightly for these units blocks, however the overall height remains under the
          maximum RL approved (i.e. RL44.7) under the most recent change approval. This is
          achieved by a minor change to the roof pitch for these buildings;



                                                                                 Page 21 of 135

Section 22

GENERAL COMMITTEE MEETING AGENDA                                               15 JANUARY 2018


     o     Block 20 – the overall height of this building has marginally increased as a
           consequence of associated proposed civil works, wherein the upper level of the
           building has been shifted to align with the level of adjacent driveway to facilitate
           convenient and pedestrian access to the dwellings;
   Minor amendments to the staging of the development to generally align with anticipated
     construction and titling program of delivery. Notwithstanding the proposed staging
     amendments, these have been notated for identification purposes only. The order of
     construction of individual stages has not been confirmed. Our client is seeking to retain
     flexibility in the approval conditions to allow stages to proceed individually, simultaneously
     or not in sequential order.
The proposed new dwelling configuration for individual stages can be summarised as follows:-




The proposed changes will require consequential changes to conditions to reflect the amended
site layout, proposed staging amendments and updated building number references. Accordingly,
it is requested to amend conditions 1, 2, 8, 33, 64 and Advisory Notes 1, 2 and 11
The application also proposes to amend Conditions 4, 47, 83 and 96.
The application also identifies formatting issues with existing conditions 72 and 81 and it is
requested that these be rectified as part of this application. Based on feedback from Council’s
Environmental Health Department it is also recommended to remove reference to a Local Law
which is no longer applicable within Condition 81.
Summarised versions of the current approved and proposed development plans are included as
Attachments 1 & 2. A comparison of the layout from the original, subsequent approved changes
to the development and the current proposal are shown in Figures 1 – 5 below.
The application is before Council due to the scale and significance of the development. However,
the proposed amendments are generally considered relatively minor and do not result in
significant change to the overall form of the development.




                                                                                  Page 22 of 135

Section 23

GENERAL COMMITTEE MEETING AGENDA                           15 JANUARY 2018




                      Figure 1 –Original Approved Layout




                                                             Page 23 of 135

Section 24

GENERAL COMMITTEE MEETING AGENDA                              15 JANUARY 2018




                     Figure 3 Layout Modified December 2016




                    Figure 4 Layout Modified September 2017




                                                                Page 24 of 135

Section 25

GENERAL COMMITTEE MEETING AGENDA                                                   15 JANUARY 2018




            Figure 5 – Proposed Layout – Current Change (Revised plan submitted 29.11.2017)

2.   SITE DETAILS
2.1. Background
The site is located within Precinct F of the Noosa Springs development at Noosa Springs Drive,
Noosa Heads. Noosa Springs is a master planned residential golf resort, with most development
on the site completed. The subject resort site and an adjoining multiple dwelling site (Precinct
E2) have remained undeveloped and were recently purchased by the applicant.
On the 30 August 2007 Council approved the application for a Material Change of Use - Resort
of 155 Multiple Dwelling Units & Associated Facilities (Theatre, Restaurant, Shops & Function
Rooms), which was assessed under the Superseded Planning Scheme.
Representations were then made, and on the 5 November 2007, Council agreed to amend or
delete 18 of the 102 total conditions pertaining to the development.
On 6 April 2011 an extension to the currency period of the approval for 4 years to 1 November
2015 was agreed.
On 10 September 2015 an extension to the currency period of the approval for 2 years to 1
November 2017 was agreed.
On 10 March 2016 a modification to the approval was granted which altered the general redesign
of building layouts to increase efficiency and consolidate non-residential components and remove
the theatre and function room components of the approval.
On 15 December 2016 a modification of the approval was granted which changed the description
of the approval from Material Change of Use - 155 Multiple Dwelling Units and Associated
Facilities - Theatre, Restaurant, Shops & Function Rooms to Material Change of Use for a Resort
of 151 Multiple Dwelling Units and Associated Facilities – Shop, Restaurant, Multi-Function
Room and Gym. This change also included a redesign of the building layouts and a change to a
number of conditions.
On 21 September 2017 Council agreed to further modification of the approval which changed the
description of the approval from Material Change of Use - 151 Multiple Dwelling Units and
Associated Facilities – Shop, Restaurant, Multi-Function Room and Gym to Material Change of
Use for 145 Multiple Dwelling Units and Associated Facilities – Shop, Restaurant, Multi-Function
Room and Gym. This change also included a redesign of the building layouts and a change to a
number of conditions.

                                                                                       Page 25 of 135

Section 26

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018


2.2. Site Description
The site is a 4.262ha irregularly shaped allotment located on the western slopes of a high dune
on the eastern side of the Noosa Springs development and has a frontage to Resort Drive of
approximately 315 metres. Most of the site was used as a sand quarry in the past and the terrain
varies from gentle slopes on the quarry floor to very steep slopes on the excavated batters.
Undisturbed ground surrounding the quarry slopes moderately, averaging roughly 12-15%.
A band of mature open forest is present around the extremities of the quarry area, varying in
width from 10 to 30m along Resort Drive and containing some mature trees. An area of 0.8ha of
remnant vegetation exists in the north of the site which is to be cleared for the development.
Native vegetation is also found along the ridgeline of the escarpment to the eastern boundary,
adjacent to the car park and Resort Drive to the north. Species present include koala feed trees
and koalas have been observed in the area by Noosa Springs residents, though the site is
excluded from the State’s koala habitat mapping.
The site is bounded by Council land to the east, the Noosa Springs clubhouse to the northwest
and Residential Precincts E1 to the west and Residential Precinct E2 to the south. Precinct E1
has been developed for 42 multiple dwelling units, with Precinct E2 subject to representations to
a current development application for 44 units (MCU15/0109). The representations also seek to
amend the plans and reduce the number of units to 37. The Noosa Heads sewerage treatment
plant is located to the north of the site, with land further to the south of the site being National
Park adjacent to Lake Weyba. A 3 metre wide pathway reserve runs along the eastern boundary.
Aerial photographs of the site and its surrounds are shown in Figures 6 & 7 below.




                               Figure 6 – Aerial Photograph of Locality




                                                                                   Page 26 of 135

Section 27

GENERAL COMMITTEE MEETING AGENDA                                             15 JANUARY 2018




                                   Figure 7 – Aerial Photograph

3.   STATUTORY PROCESS
The proposed change to the development approval requested by the applicant is determined to
constitute a minor change in accordance with Schedule 2 of the Planning Act 2016 on the
grounds that:
   The change would not result in a substantially different development as the use remains
     the same as that approved and the scale and bulk of the development remains generally
     consistent with the current approval. There are no new uses proposed that would create
     different or additional impacts.
   The changes do not create a new referral trigger to the State Assessment and Referral
     Agency.
   The proposed changes do not vary the level of assessment the original development
     application was impact assessable; and
   The changes do not involve prohibited development.
4.   ASSESSMENT
Plans
The submitted plans provide for a reduction in the number of units from 145 to 137 and the
amended configuration of the units. The resultant changes accord with the allowable population
density and provide for a development with a scale and bulk consistent with the current approval.




                                                                                 Page 27 of 135

Section 28

GENERAL COMMITTEE MEETING AGENDA                                               15 JANUARY 2018


The overall form of the approval is consistent with the previous approval in that the application
maintains the multiple dwelling development, together with minor ancillary activities including a
shop, café/restaurant and communal recreation facilities. The built form is maintained as the
buildings will remain a mix of 2-3 storeys with basement car parking.
The slight reduction in the number of dwelling units has not significantly altered the scale of the
multiple dwelling component of the development. The change to dwelling unit composition
involves a reduction in the number of 1 and 2 bedroom dwelling units, an increase in the number
of 3 bedroom dwelling units and the deletion of the 4 bedroom dwelling units. The reduction in 1
and 2 bedroom units results in a loss of housing diversity however there is no provision within the
planning scheme requiring a mix of bedroom numbers for new dwellings. It is likely that the
amended mix of dwelling types is in response to market demand. The minor change to the GFA
is still below that originally approved over the site.
A comparison of the proposed amendment against both the original approval and the most
recently modified approval is provided in the table below:-




                                                                                  Page 28 of 135

Section 29

GENERAL COMMITTEE MEETING AGENDA                                               15 JANUARY 2018




The minor redesign of the central communal facilities is generally contained within the back of
house areas with the building appearance and scale being maintained.
The changes to the alignment of the internal roads, parking arrangements and pedestrian
pathways are supported as they are minor and of no significant consequence.
The re-alignment of blocks 13 and 14 will be of little consequence as separation is maintained
between the two buildings.
The minor change to the staging of the development retains the flexibility in the approval
conditions to allow stages to proceed individually, simultaneously or not in sequential order.
With regards to the proposed changes to the heights of buildings 3, 16, 17 and 20:
   Block 3 is proposed to be increased by approximately 350mm to introduce greater acoustic
     treatment between levels. The overall building height remains below 12 metres with the
     majority of the roof form being well below this height. This minor increase in height is
     supported.
   It is proposed to increase the floor to ceiling heights of Blocks 16 and 17. The overall height
     is to remain under the maximum RL approved (i.e. RL44.7) and this has been achieved by
     lowering the roof pitch for these buildings. This minor change is supported.
   The applicant advises that the overall height of Block 20 is increased due to proposed civil
     works, wherein the upper level of the building has been shifted to align with the level of the
     adjacent driveway to allow for pedestrian access to the dwellings. The civil works reduce
     the extent of excavation required for the road thereby reducing the height of retaining walls
     adjacent to the north-eastern boundary. The resultant change in height for Block 20 is
     900mm and results in a section of the building being in excess of 8.0 metres. The height of
     this building is 3.80 metres lower than the adjoining building (Block 19) to the north and 7.6
     metres lower than Block 18 further north. The proposed increase in height does not
     compromise the vegetated backdrop provided by Girraween as evidenced by the visual
     assessment that was provided with the original application.
Accordingly, the amendments to the plans are supported.




                                                                                   Page 29 of 135

Section 30

GENERAL COMMITTEE MEETING AGENDA                                                   15 JANUARY 2018


Conditions
Condition 1
1.   Prior to the issue of an operational works approval for civil works for each stage of the
     development, fully detailed architectural proposal plans relevant to each stage must be
     submitted for Council approval. Detailed plans must provide the following details as a
     minimum:
     1.1      Full architectural building elevations;
     1.2      Detailed roof plans and ground level contours demonstrating compliance with the
              development’s 8m/12m building height limits above natural and finished ground
              levels;
     1.3      Landscaping areas demonstrating compliance with Condition 5 herein
     1.4      The location of proposed stormwater management/treatment devices;
     1.5      Consistency with all management plans for the development;
     1.6      Building colour schemes demonstrating compliance with Condition 8 herein; &
     1.7      Vehicle manoeuvring areas and temporary turning provisions.
     1.8      Plans demonstrating compliance with the allowable population density of 426.2
              persons.
Applicant’s requested change
The applicant requests that this condition be amended as the current set of plans demonstrate
compliance with Condition 1.8.
Assessment
The proposed amendment to condition 1 will reflect the new set of plans and is therefore
supported.
Condition 2
2    Development undertaken in accordance with this approval must generally comply with the
     approved plans of development. The approved plans are listed below and are as amended
     by the conditions herein.
       Plan No.                Rev.    Plan/Document Name                                   Date
       7038-DA01               10      Project summary prepared by Blackburne Jackson       06-06-17
                                       Design
       7038-DA03               09      Carparking/Basement    prepared   by   Blackburne    06-06-17
                                       Jackson Design
       7038-DA04               10      Ground Floor prepared by Blackburne Jackson          06-06-17
                                       Design
       7038-DA05               09      First Floor prepared by Blackburne Jackson Design    06-06-17
       7038-DA06               08      Second Floor prepared by Blackburne Jackson          06-06-17
                                       Design
       7038-DA07               07      Site Section prepared by Blackburne Jackson          06-06-17
                                       Design
       7038-DA08               08      Site Section prepared by Blackburne Jackson          06-06-17
                                       Design
       7038-DA09               13      Indicative  Apartment   Layouts     prepared    by   06-06-17
                                       Blackburne Jackson Design
       7038-DA10               11      Indicative  Apartment   Layouts     prepared    by   06-06-17
                                       Blackburne Jackson Design


                                                                                       Page 30 of 135

Section 31

GENERAL COMMITTEE MEETING AGENDA                                         15 JANUARY 2018


     Plan No.      Rev.   Plan/Document Name                                      Date
     7038-DA11     07     Perspective sketches     prepared   by     Blackburne   06-06-17
                          Jackson Design
     7038-DA12     07     Perspective sketches     prepared   by     Blackburne   06-06-17
                          Jackson Design
     7038-DA13     07     Overall staging   plan   prepared   by     Blackburne   14-06-17
                          Jackson Design
     7038-DA14     05     Finishes Palette prepared by Blackburne Jackson         06-06-17
                          Design
     7038-DA15     05     Resort Facilities Floor Plan prepared by Blackburne     06-06-17
                          Jackson Design
     7038-DA16     04     Facilities Elevations    prepared   by     Blackburne   06-06-17
                          Jackson Design
     7038-DA17     02     Indicative  Apartment   Layouts      prepared     by    06-06-17
                          Blackburne Jackson Design
     7038-DA19     05     Building 15 Elevations prepared by Blackburne           06-06-17
                          Jackson Design
     7038-DA20     05     Block 18 Elevations      prepared   by     Blackburne   06-06-17
                          Jackson Design
     7038-DA21     05     Building 3 Elevations prepared by Blackburne            06-06-17
                          Jackson Design
     7038-DA23     05     Block 2 Elevations prepared by Blackburne Jackson       06-06-17
                          Design
     7038-DA24     02     Block 15 Sections prepared by Blackburne Jackson        06-06-17
                          Design
     7038-DA25     02     Block 18 Sections prepared by Blackburne Jackson        06-06-17
                          Design
     DD1.1         F      Location Plan prepared by Sparks Architects             08-06-2017
     DD1.2         F      Site Plan prepared by Sparks Architects                 08-06-2017
     DD1.3         H      Unit Type 1 prepared by Sparks Architects               08-06-2017
     DD1.4         H      Unit Type 2 prepared by Sparks Architects               08-06-2017
     WD1.8         E      Ground Floor Plan Block 7 prepared by Sparks            23-08-2017
                          Architects
     DD1.6         E      First Floor Plan Block 7 prepared by Sparks             08-06-2017
                          Architects
     DD1.7         D      Roof Plan Block 7 prepared prepared by Sparks           08-06-2017
                          Architects
     DD1.8         E      Ground Floor Plan Block 8 prepared by Sparks            08-06-2017
                          Architects
     DD1.9         E      First Floor Plan Block 8 prepared by Sparks             08-06-2017
                          Architects
     DD1.10        D      Roof Plan Block 8 prepared by Sparks Architects         08-06-2017
     DD1.11        E      Ground Floor Plan Block 9 prepared by Sparks            08-06-2017
                          Architects
     DD1.12        E      First Floor Plan Block 9 prepared by Sparks             08-06-2017
                          Architects
     DD1.13        D      Roof Plan Block 9 prepared by Sparks Architects         08-06-2017
     WD2.1         B      Elevations prepared by Sparks Architects                23-08-2017
     WD2.2         B      North Elevations Block 7 prepared by Sparks             23-08-2017
                          Architects

                                                                             Page 31 of 135

Section 32

GENERAL COMMITTEE MEETING AGENDA                                             15 JANUARY 2018


     Plan No.         Rev.   Plan/Document Name                                      Date
     WD2.3            B      East Elevations Block 7 prepared by Sparks              23-08-2017
                             Architects
     WD2.4            B      South Elevations Block 7 prepared by Sparks             23-08-2017
                             Architects
     WD2.5            B      West Elevations Block 7 prepared by Sparks              23-08-2017
                             Architects
     WD2.6            B      Elevations Block 8 prepared by Sparks Architects        23-08-2017
     WD2.7            B      Elevations Block 9 prepared by Sparks Architects        23-08-2017
     DD3.1            D      Sections Block 7 prepared by Sparks Architects          08-06-2017
     DD3.2            B      Section Block 7 prepared by Sparks Architects           08-06-2017
     DD3.3            D      Section Block 8 prepared by Sparks Architects           08-06-2017
     DD3.4            D      Section Block 9 prepared by Sparks Architects           08-06-2017
     DD4.1            G      3D prepared by Sparks Architects                        08-06-2017
     DD4.2            G      3D prepared by Sparks Architects                        08-06-2017
     DD4.3            G      3D prepared by Sparks Architects                        08-06-2017
     DD4.4            G      3D prepared by Sparks Architects                        08-06-2017
     DD4.5            G      3D prepared by Sparks Architects                        08-06-2017
     DD4.6            G      3D prepared by Sparks Architects                        08-06-2017
     DD4.7            G      3D prepared by Sparks Architects                        08-06-2017
     7088_A01-10_03   03     CTS 4 Site Plan – Level 1 prepared by Blackburne        06-06-17
                             Jackson Design
     7088_A01-21_05   05     CTS 1 Site Plan – Level 1 prepared by Blackburne        06-06-17
                             Jackson Design
     7088_A01-31_05   05     CTS 3 Site Plan – Level 1 prepared by Blackburne        06-06-17
                             Jackson Design
     7088_A02-01_06   06     Facilities Building Level 1 – Floor Plan prepared by    06-06-17
                             Blackburne Jackson Design
     7088_A02-02_06   06     Facilities Building – Roof     Plan   prepared     by   06-06-17
                             Blackburne Jackson Design
     7088_A02-30_05   05     Block 15 Basement Level – Floor Plan prepared by        06-06-17
                             Blackburne Jackson Design
     7088_A02-31_06   06     Block 15 Level 1 – Floor Plan prepared by               06-06-17
                             Blackburne Jackson Design
     7088_A02-32_05   05     Block 15 Level 2 – Floor Plan prepared by               06-06-17
                             Blackburne Jackson Design
     7088_A02-33_05   05     Block 15 Level 3 – Floor Plan prepared by               06-06-17
                             Blackburne Jackson Design
     7088_A02-34_04   04     Block 15 – Roof Plan prepared by Blackburne             06-06-17
                             Jackson Design
     7088_A02-60_06   06     Block 3 Basement Level – Floor Plan prepared by         06-01-17
                             Blackburne Jackson Design
     7088_A02-61_06   06     Block 3 Level 1 – Floor Plan prepared by Blackburne     06-01-17
                             Jackson Design
     7088_A02-62_06   06     Block 3 Level 2 – Floor Plan prepared by Blackburne     06-01-17
                             Jackson Design
     7088_A02-63_06   06     Block 3 Level 3 – Floor Plan prepared by Blackburne     06-01-17
                             Jackson Design
     7088_A02-64_06   06     Block 3 – Roof Plan prepared by Blackburne              06-01-17

                                                                                Page 32 of 135

Section 33

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018


       Plan No.             Rev.   Plan/Document Name                                    Date
                                   Jackson Design
       7088_A02-90_02       02     Block 16 Basement Level – Floor Plan prepared by      06-06-17
                                   Blackburne Jackson Design
       7088_A02-91_02       02     Block 16 Level 1 – Floor Plan prepared by             06-06-17
                                   Blackburne Jackson Design
       7088_A02-92_02       02     Block 16 Level 2 – Floor Plan prepared by             06-06-17
                                   Blackburne Jackson Design
       7088_A02-93_02       02     Block 16 Level 3 – Floor Plan prepared by             06-06-17
                                   Blackburne Jackson Design
       7088_A02-94_02       02     Block 16 – Roof Plan prepared by Blackburne           06-06-17
                                   Jackson Design
       7088_A04-01_04       04     Elevations prepared by Blackburne Jackson Design      06-06-17
       7088_A04-10_03       03     Block 15 - Elevations prepared by Blackburne          06-06-17
                                   Jackson Design
       7088_A04-11_03       03     Block 15 - Elevations prepared by Blackburne          06-06-17
                                   Jackson Design
       7088_A04-20_04       04     Block 3 - Elevations prepared by Blackburne           06-01-17
                                   Jackson Design
       7088_A04-21_04       04     Block 3 - Elevations prepared by Blackburne           06-01-17
                                   Jackson Design
       7088_A04-30_02       02     Block 16 - Elevations prepared by Blackburne          06-06-17
                                   Jackson Design
       7088_A04-31_02       02     Block 16 - Elevations prepared by Blackburne          06-06-17
                                   Jackson Design
       7088_A05-01_04       04     Sections prepared by Blackburne Jackson Design        06-06-17
       7088_A05-10_03       03     Block 15 - Sections prepared by Blackburne Jackson    06-06-17
                                   Design
       7088_A05-15_01       01     Block 16 - Sections prepared by Blackburne Jackson    06-06-17
                                   Design
       7088_AA05-20_03      03     Sections prepared by Blackburne Jackson Design        29-05-17
       7088_AO17-01_01      01     Facilities Buildings Perspectives    prepared    by   19-05-17
                                   Blackburne Jackson Design
       7088_AO17-03_01      01     Quarry Café Views prepared by Blackburne Jackson      19-05-17
                                   Design
       7088_AO17-03_02      02     Parkside Residences     prepared    by   Blackburne   06-06-17
                                   Jackson Design
       7088_AO17-04_01      01     Parkside Terrace 15     prepared    by   Blackburne   19-05-17
                                   Jackson Design
       7088_AO17-05_01      01     Parkside Terrace 15     prepared    by   Blackburne   19-05-17
                                   Jackson Design
       7088_AO17-06_02      02     Parkside Residences 3 prepared by Blackburne          06-06-17
                                   Jackson Design
Applicant’s requested change
The applicant requests that condition 2 be updated to reflect the new set of plans.
Assessment
The proposed amendment to condition 2 will reflect the new set of plans and is therefore
supported.



                                                                                      Page 33 of 135

Section 34

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018


Condition 4
4.    The ancillary shop, restaurant/cafe, multi-function room, gym and other ancillary facilities
      shall be operated and maintained as a Resort. A letting pool service promoting and
      managing short term accommodation must also be established on site and made available
      to all owners of multiple dwelling units. The community management statement for any or
      all bodies corporate having control of the Resort or any part thereof shall incorporate this
      condition. Where the development is staged, the common resort facilities must be
      completed and operational as part of the first stage or after construction of the 64th Unit.
Applicant’s requested change
The current wording of this condition is somewhat ambiguous as to when the common resort
facilities are to be completed and operational. As per previous discussions with Council, and as
reflected in the previous Council assessment report (i.e. Planning & Environment Committee
Meeting Agenda of 6 December 2016) it is requested that this condition be amended as follows
to require that the facilities be constructed and operational prior to the commencement of use of
the 64th dwelling unit:-
4.    The ancillary shop, restaurant/cafe, multi-function room, gym and other ancillary facilities
      shall be operated and maintained as a Resort. A letting pool service promoting and
      managing short term accommodation must also be established on site and made available
      to all owners of multiple dwelling units. The community management statement for any or
      all bodies corporate having control of the Resort or any part thereof shall incorporate this
      condition. Where the development is staged, the common resort facilities must be
      completed and operational as part of the first stage or after construction prior to the
      commencement of use of the 64th Unit.
Assessment
It is not reasonable to change the wording of this condition as proposed by the applicant. The
intent of the condition is to ensure the development of the resort facilities and that the
development of these facilities occurs in a timely manner. This will also allow the initial occupants
of the resort to use the facilities. Furthermore the use of the 64th unit could occur a considerable
time after its development. Therefore, it is recommended that the wording of condition 4 remain
unchanged.


Condition 8
8.    The development’s external colour scheme shall use muted environmental tones of
      browns, greens and greys to integrate the development with its landscape setting and
      ensure the development does not visually impact on the vegetated skyline. All buildings
      shall utilise the finishes palette detailed on Plan 7038- DA14 Issue 05 Dated 06.06.2017.
      The use of paint finish Taubmans Tahira White is to be minimised.
Applicant’s requested change
To reflect the colours and finishes palette submitted as part of the change request the applicant
requests the condition be amended to:
8.    The development’s external colour scheme shall use muted environmental tones of
      browns, greens and greys to integrate the development with its landscape setting and
      ensure the development does not visually impact on the vegetated skyline. All buildings
      shall utilise the finishes palette detailed on Plan 7038- DA14 Issue 05 Dated 06.06.2017 06
      Dated 29-09-17. The use of paint finish Taubmans Tahira White is to be minimised.
Assessment
The colours and finishes palette provides for exactly the same colour finishes as previously
approved – the only change relates to the issue number and the date on the plans. Accordingly,
this minor change is supported.

                                                                                    Page 34 of 135

Section 35

GENERAL COMMITTEE MEETING AGENDA                                              15 JANUARY 2018


Condition 33
33.   Carparking shall be provided within the site generally as shown on the approved plans. All
      at grade carparking shown on the approved plans must be maintained in common property
      and available to all units. Carparking shall include 261 carpark spaces with 205 of these to
      be covered carpark spaces, and include 10 clearly defined disabled carpark spaces for the
      unit component of the development. Five carparking spaces for staff in addition to resident
      and visitor spaces are to be provided on site. Motorcycle/scooter parking spaces may be
      incorporated at a rate of 4 spaces equivalent to 1 car space.
Applicant’s requested change
It is requested that this condition be amended to reflect new car parking numbers triggered by the
proposed new unit mix as reflected on the amended architectural plans. We note that proposed
car parking numbers are in excess of the minimum requirements for both resident and visitor
parking under the Noosa Plan, as reflected in the following table:-




In addition to the number of carparks triggered for the proposed units identified in the table
above, an additional 6 car spaces are also intended to be allocated for staff parking.
Based on the above, there is an overall surplus in car spaces (circa 51 uncovered car spaces)
anticipated by the development, and it is requested that the opportunity be provided that these
surplus car spaces be able to be allocated to individual units by the developer, as exclusive use
spaces. This would increase the marketability of units without adversely impacting upon visitor
parking arrangements across the development.
In light of this, it is requested that this condition be amended to read:-
33.   Carparking shall be provided within the site generally as shown on the approved plans. All
      at grade carparking shown on the approved plans must be maintained in common property
      and available to all units. Carparking shall include 261 285 carpark spaces with 205 250 of
      these to be covered carpark spaces, and include 10 clearly defined disabled carpark
      spaces for the unit component of the development. Five carparking spaces for staff in
      addition to resident and visitor spaces are to be provided on site. Motorcycle/scooter
      parking spaces may be incorporated at a rate of 4 spaces equivalent to 1 car space
Assessment
The provision of car parking significantly exceeds the amount required under the Noosa Plan.
The applicant’s request that the surplus car parking spaces be made exclusively available to
individual units is not unreasonable, as the minimum required number of visitor spaces (35) will
remain available. In order to maintain visitor car spaces within common property, thereby
providing surety to car parking for non-residents, it is recommended that the applicant’s proposed
wording be generally accepted with a minor modification to read:
33.   Carparking shall be provided within the site generally as shown on the approved plans.
      Carparking shall include 285 carpark spaces with 250 of these to be covered carpark
      spaces, and include 10 clearly defined disabled carpark spaces for the unit component of
      the development. Five carparking spaces for staff in addition to resident and visitor spaces
      are to be provided on site. Visitor and staff carparking, including all at grade car parking
      situated between Blocks 2 and 3, must be maintained in common property and be available
      to all units. Motorcycle/scooter parking spaces may be incorporated at a rate of 4 spaces
      equivalent to 1 car space.



                                                                                  Page 35 of 135

Section 36

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018


Condition 47
47.   All stormwater drainage shall be managed so that:
      a.   there is no net increase in 1 year ARI peak stormwater flows from the site at any
           stage of the development; and
      b.   the discharge of stormwater from construction or completed stages of the site does
           not affect the approved design residence time of the Noosa Springs Golf Course lake
           system.
Applicant’s requested change
This condition currently requires no net increase in 1 year ARI peak stormwater flows from the
site at any stage of the development. As discussed through the detailed design process, and
associated operational works package associated with the development, there is a minor net
increase in the 1 year ARI event from the site of 0.08m3/s. This increase is considered minor
when compared to the total site 1 year ARI event flow of 1.709m3/2.
Although there is a minor increase in flow, it should be noted that the site is 51% impervious
which is generally in keeping with the 50% imperviousness assumed in the master drainage plan
report for the site. The pipe drainage infrastructure in Resort Drive and the stormwater property
connections to the site have been designed for the minor (10 year ARI) storm events so that the
minor net increase in the 1 year ARI can be accommodate without negatively impacting the
existing drainage infrastructure. Furthermore, the minor increase in the 1 year ARI Flow from the
site will be mitigated by the storage provided within the extensive pipe network, bio-retention
basins and swales within the site.
In light of the above, it is requested that Condition 47 be amended to read:-
47.   All stormwater drainage shall be managed so that:
      a.   there is no net increase in 1 year ARI peak stormwater flows from the site at any
           stage of the development; and
      b.   the discharge of stormwater from construction or completed stages of the site does
           not affect the approved design residence time of the Noosa Springs Golf Course lake
           system.
Assessment
The request to amend this condition was referred to Council’s Environment Officer who advised:
Condition 47(a) is applied to ensure the development meets the State Planning Policy, therefore
we cannot remove its intention completely.
The condition can be reworded to achieve the same outcome of the State Planning Policy being
that the applicant will need to demonstrate the Peak 1 year flows will not cause scour to any
receiving water ways.
Condition 47(a) can be reworded as follows:
a) there is no net increase in 1 year ARI peak stormwater flows from the site at any stage of the
development that will cause scour at any point in the receiving environment. Where there is an
increase in 1 year ARI peak stormwater flows, a Hydraulic Engineer must certify that the increase
will not be responsible for any scour in the receiving environment
It is recommended that condition 47(a) be reworded in accordance with the advice of Council’s
Environment Officer.




                                                                                  Page 36 of 135

Section 37

GENERAL COMMITTEE MEETING AGENDA                                              15 JANUARY 2018


Condition 83
83.   The development shall comply with the noise management strategies contained in the
      report prepared by Ron Rumble Pty Ltd and dated November 2006, with the following
      additional details to be provided prior to issue of Operational Works to the reasonable
      satisfaction of Manager, Environmental Health:
      83.1 The necessary and appropriate noise control measures incorporated into the façade
           of the apartments and within the restaurant. These measures should include:
            83.1.1   Upgraded glazing and air-conditioning to the potentially affected apartments,
                     and which apartments
            83.1.2   Strategically placed wing walls on balconies to screen the apartment and
                     balconies from alfresco dining areas;
            83.1.3   The possibility of a roof over the outdoor dining area with absorption to the
                     underside should be explored;
            83.1.4   Revised hours of operation to no later than midnight;
      83.2 Formulate and implement a Noise Management Plan to deal with noise emissions
           from the premises including patron noise.
      83.3 Prospective purchasers of the apartments to be advised of the noise control features,
           which have been incorporated into the design of the apartments and the hours of
           operation of the adjacent restaurant.
      83.4 The Noise Management Plan referred to in Condition 82.1.4 shall be incorporated in
           perpetuity in the By-Laws of the Body Corp for the building.
      83.5 The Noise Management Plan shall include a process for dealing with complaints and
           specify that the Restaurant Manager and Body Corp Manager be responsible for
           dealing with any noise complaints.
Applicant’s requested change
This condition requires that a Noise Management Plan be prepared to deal with noise emissions
associated with the common resort facilities, wherein such strategies comply with an acoustic
report prepared by Ron Rumble Pty Ltd and dated 2006. We note that the Ron Rumble Pty Ltd
report was prepared for and supported the original approval over the site which incorporated
resort facilities of a scale and form that were more significant than the scale of the current
approved common resort facilities. It is understood that this reduction in scale has previously
been acknowledged by Council. The gross floor area of the proposed Community facilities has
now reduced from approximately 1,341sqm (as originally approved) to (circa) 600sqm.
To advise prospective purchases of the particular noise control features that have been
implemented into the design of individual apartments is an onerous requirement given the small
scale of the facilities now proposed. Acoustic mitigation measures can be readily incorporated
into the required noise management plan. We can confirm that a noise management plan is
currently being prepared to this effect and is anticipated as being provided to Council under
separate cover.
As such, it is requested that:-
    clause 83.3 be amended to require the prospective purchasers be advised of the noise
      management plan to manage potential noise emissions associated with the development;
    the cross referencing error in clause 83.4 be amended; and
    the noise control measures identified in clause 83.1 may not all necessarily be required to
      achieve appropriate acoustic levels, and this should be reflected in the drafting of this
      condition.



                                                                                  Page 37 of 135

Section 38

GENERAL COMMITTEE MEETING AGENDA                                                 15 JANUARY 2018


In light of the above, it is respectfully requested that this condition be amended as follows:-
83    The development shall comply with the noise management strategies contained in the
      report prepared by Ron Rumble Pty Ltd and dated November 2006, with the following
      additional details to be provided prior to issue of Operational Works to the reasonable
      satisfaction of Manager, Environmental Health:-
      83.1 The necessary and appropriate noise control measures incorporated into the façade
           of the apartments and within the restaurant. These measures should may include:
            83.1.1   Upgraded glazing and air-conditioning to the potentially affected apartments,
                     and which apartments;
            83.1.2   Strategically placed wing walls on balconies to screen the apartment and
                     balconies from alfresco dining areas;
            83.1.3   The possibility of a roof over the outdoor dining area with absorption to the
                     underside should be explored;
            83.1.4   Revised hours of operation to no later than midnight;
      83.2 Formulate and implement a Noise Management Plan to deal with noise emissions
           from the premises including patron noise.
      83.3 Prospective purchasers of the apartments to be advised of the noise control features,
           which have been incorporated into the design of the apartments and the hours of
           operation of the adjacent restaurant The applicant must advise prospective
           purchasers that a noise management plan has been prepared to manage noise
           emissions related to the development.
      83.4 The Noise Management Plan referred to in Condition 82.1.4 83.2 shall be
           incorporated in perpetuity in the By-Laws of the Body Corp for the building.
      83.5 The Noise Management Plan shall include a process for dealing with complaints and
           specify that the Restaurant Management and Body Corp Manager be responsible for
           dealing with any noise complaints.
Assessment
A Noise Management Plan (NMP) was submitted with the application and reviewed by Council’s
Environmental Health Department. Based on review of the NMP it is recommended that
Condition 83.3 be reworded in accordance with the applicant’s request. It is also recommended
that the cross referencing error in Condition 83.4 be rectified and an error within the wording of
Condition 83.1.1 also be rectified.
However the applicant’s request to alter the wording of Condition 83 from “should” to “may” is not
recommended. The Environmental Health Unit has recommended that the term “should” be
replaced with “shall” and minor changes to wording of Condition 83.1.3 such that the amended
Condition is now recommended to read:
83    The development shall comply with the noise management strategies contained in the
      report prepared by Ron Rumble Pty Ltd and dated November 2006, with the following
      additional details to be provided prior to issue of Operational Works to the reasonable
      satisfaction of Manager, Environmental Health:-
      83.1 The necessary and appropriate noise control measures incorporated into the façade
           of the apartments and within the restaurant. These measures shall include:
            83.1.1   Upgraded glazing and air-conditioning to the potentially affected apartments;
            83.1.2    Strategically placed wing walls on balconies to screen the apartment and
                     balconies from alfresco dining areas;
            83.1.3    Installation of a roof over the outdoor dining area with absorption to the
                     underside should be explored;

                                                                                     Page 38 of 135

Section 39

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018


            83.1.4   Revised hours of operation to no later than midnight;
      83.2 Formulate and implement a Noise Management Plan to deal with noise emissions
           from the premises including patron noise.
      83.3 The applicant must advise prospective purchasers that a noise management plan has
           been prepared to manage noise emissions related to the development.
      83.4 The Noise Management Plan referred to in Condition 83.2 shall be incorporated in
           perpetuity in the By-Laws of the Body Corp for the building.
      83.5 The Noise Management Plan shall include a process for dealing with complaints and
           specify that the Restaurant Management and Body Corp Manager be responsible for
           dealing with any noise complaints.
Condition 96
96.   The rear 2 metres of Blocks 7, 8 and 9 is to be extensively landscaped and no structures or
      swimming pools are to be located in these areas. No access is to be provided from the rear
      of these Blocks to Resort Drive
Applicant’s requested change
It is noted that this condition has been introduced as a consequence of the most recent change
approval, and we note that previous representations were made that this condition should be
either deleted or amended to allow structures and / or swimming pools in the rear 2 metres of
these blocks. We maintain our previous position, and reiterate that this has significant design
implications for these buildings as well as will adversely impact on the area of useable outdoor
open space for future occupants of these units.
As reflected in the approved plans of development, there are only 6 plunge pools intended along
the rear of these blocks, each of which have been intentionally sited to ensure a seamless
integration into the overall design of the development, whilst also achieving a high quality
presentation to the adjacent Resort Drive.
It is understood that Council imposed the requirement that no structures or swimming pools are
to be located within a 2m landscape setback primarily to ensure that existing vegetation
(including koala food trees) along the Resort Drive frontage are retained. The proposed
development achieves this landscape outcome without the need to setback pools and structures
an additional 2 metres. In particular, a significant number of trees will be retained along the
Resort Drive frontage as required by conditions 5.5 and 6 of the most recent decision notices.
An updated Vegetation Management Plan (VMP) has been prepared (refer attached) which
demonstrates the number of trees able to be retained, subject to arborist certification during the
detailed engineering phase of the project. As reflected in the VMP “tree protection zones” and a
“tree protection fence” are proposed to delineate those trees anticipated as being retained, the
majority of which are generally clear of the construction zone for the plunge swimming pools and
boundary fences. Of those trees that are nominated as being removed by the VMP, they are
generally located within the areas of private open space for units 7, 8 & 9 and sited such that
they would significantly impede on the usability of those spaces. It is understood that buffer
planting is intended to be provided along Resort Drive in proximity of where trees are anticipated
as being removed.
In addition, in respect of trees proposed to be retained, where it is practical to do so directional
drilling techniques will be utilised to construct utility services along Resort Drive, to ensure tree
retention.
To assist Council’s assessment of the proposed change to condition 96, the following information
will be submitted under separate cover:-
    Arboricultural assessment of trees to be retained;
    Landscape Concept Plan demonstrating landscaping outcomes along the site frontage and
      within the private open space of Blocks 7 – 9.

                                                                                    Page 39 of 135

Section 40

GENERAL COMMITTEE MEETING AGENDA                                               15 JANUARY 2018


In addition to the above, it is proposed to maintain the opportunity for occasional pedestrian
access to the rear of Blocks 7, 8 & 9 for garden and pool maintenance only. The proposed
restriction to access to Resort Drive will be included within the Community Management
Statement for the development.
We therefore request that this condition be amended to read as follows:-
96.   The rear 2 metres of Blocks 7, 8 and 9 is to be extensively landscaped and no structures or
      swimming pools are to be located in these areas. No access is to be Access, where
      provided from the rear of these Blocks 7, 8 and 9 to Resort Drive, is limited to garden and
      pool maintenance access only. No vehicular access is permitted.
Assessment
The proposed change to Condition 96 is not supported as the provision of pedestrian access for
pool and garden maintenance will result in the on-going use and disturbance of the slope of road
reserve. This vegetation in the road reserve has koala habitat values and is required to be
retained and protected so these values can persist into the future. The intent of the 2m wide
landscape setback area within the development site is to ensure a development buffer to the
protected road reserve vegetation (including roots zones) is maintained. The applicant has not
provided sufficient justification to warrant accepting the proposal and sufficient doubts exists as
to the benefits their proposal brings to the retention and protection of the vegetation.
The provision of pools in the 2m landscape area, rear lot access and an informal pathway will not
preserve the koala habitat values in the road reserve and will lead to their degradation.
Accordingly, it is recommended that Condition 96 remains unchanged.


4.1. Consequential Amendments to Conditions
The amended plans will require consequential amendments to condition 64 which relates to
Infrastructure Charges, Advisory Notes 1, 2 and 11 will also be required to be updated. These
changes are required to reflect the proposed new mix of units and overall reduction in yield.
Conditions 72 and 81 require minor amendments to rectify minor formatting issues and to remove
reference to a Local Law which is no longer applicable.


5.    CONSULTATION
The application was not required to be referred to any external agencies.


6.    FUTURE POTENTIAL MINOR CHANGES
The current application is the fourth minor change application to come before Council in the past
2 years. Given the scale of the development it is understood that further minor changes will be
proposed. In order to facilitate efficient decision making on these minor matters it is
recommended that Council delegate its powers under the Planning Act 2016 for minor change
applications to the Chief Executive Officer. Applications involving more complex changes will
continue to be presented to Council for decision making.




                                                                                   Page 40 of 135

Section 41

GENERAL COMMITTEE MEETING AGENDA                                                 15 JANUARY 2018


7.     CONCLUSION & REASONS FOR DECISION
The application seeks to change the existing development approval for a resort of 145 multiple
dwellings and associated facilities within Precinct F of the Noosa Springs master planned estate.
The changes seek to reduce the number of dwelling units to 137, alter the density and GFA and
update several conditions. The proposed changes are consistent with the original development
parameters of the approval and the changes are considered to be supportable under the
Planning Act provisions.
The intent of the existing approval was for multiple dwellings with integrated resort components
and booking/management functions. The amended development will remain subject to the
approved use type and still retains common resort-type facilities of a simpler, rationalised nature.
The application is recommended for approval, subject to amended conditions. A number of
consequential changes to conditions are also required.
The proposed changes to Conditions 4 and 96 are not supported as they would result in
uncertainty with regards to the timing of the development of the resort facilities and compromise
screening vegetation within the Noosa Springs road reserve.
Departments/Sections Consulted:

     Chief Executive Officer       Community Services                      Corporate Services
     Executive Officer             Community Development                   Financial Services
     Executive Support             Community Facilities                    ICT
                                   Libraries & Galleries                   Procurement & Fleet
                                   Local Laws                              Property
                               x   Waste & Environmental Health            Revenue Services

     Executive Services            Environment & Sustainable Development   Infrastructure Services
     Community Engagement          Building & Plumbing Services            Asset Management
     Customer Service              Development Assessment                  Buildings and Facilities
     Governance                x   Economic Development                    Civil Operations
     People and Culture        x   Environmental Services                  Disaster Management
                                   Strategic Land Use Planning             Infrastructure Planning,
                                                                           Design and Delivery




                                                                                      Page 41 of 135

Section 42

ATTACHMENT 1




Page 42 of 135

OS            TFLPrPhRIrPicetrral Ef                                              aS
    O                                    g| 89                                      fy             :
    Zz vU
        6          PCr ere          Thee                                           YL  A         lel
    20            seeee celle se   glee) $\2) 02          a:                      Y €             i
    >a            PSERRRR EERE     ie       2             2833                  OAK               ,
                  Bee ele ele/a/°  elEle    a              28                      LO   ?         |
    am              ey T ey ea | ||| ml | &b)             ae                fi           1
                    bs   =| els    =\=|=  e|                                 .  /
    FF  U           °) | | 3) Eg   sleje| | |e] Bx        S328                 “
    2                    # Ee      i        =F            ReSs                      =
     Zz U                | jojo    Biel  g a3             DSoe                |     | =
        Zz                               B| g33           REBs               /         en          :
    @ m           ule fe fo fo fe fo     s|f30            a    %         ey.         Sie           7
                  1 |o |B |p a |= |= |= ulna Bi rad                     A.           =          :
    7)            SCESESEREE       Blels) | 2) 263                      SD.          Jap        oS
    zZz                                      ;                           )           =            ~
                                                                    /  ,             Ct           _
    69                   sseeeeeteed       ss                      Le                ap           A
                                         ele 8                    Of)                    FP       =
    Q O                                  S)s.8                                       7am          =
    ”                                                         :    |       |           EC        -
        O                                                    Loy         {           =   =       =
    >                                                        Pod.                    pe          =
        m                                                     S       Eo             at
    I<                                                      6        BS   ies        pes         o
    fm m                                                 fe? f,          Ss          = 9
    cn rn                                                            I 36                EL
        O                                               a?           J Re]            REE      ‘
    z                                                  C            [—— = 4H         I    =
        O                                         Lot     k         [— SF             —
        3                     ‘                     S               Sl”               =
                                                   A                                   :
        Z                                      (Ay                  Foe              =
        Fi                                       .                  =                 =  =
                                             :                    «|e Ro                oo
                                           Jo,                  a    Te EP              3       t |
                                          wf   j  ‘\            .       at               :
                                                   \                 ES                1 BL
                                                 & |     /] ] La                     [—  —
                                         LJL\\ Eb          sare                       a
                                         A  K/         BST          ~:                —
                                      4    Arf         S| fy ph  4}                   ——
                                    J            \\    .       Li} /    ee              :      —
                                     f          \\            ALL |}  :
    POL                           { f-             \\    .      TLE]                    A (C)
                                   f fi          \            | PTT                            =
    5 Se                         |  b,                      a [3/ | | Jo | ‘Se                AI
    ze                           V) )       Sh.        Gare      eU          3                 t
      7                              |                   >   .
    Mm                               |
         9                        in             ar =   — 98 Sj         a              :
      @ 4                         } \    Poy       ay    Ty                           :         |
      6 &                         [|               a}  > 2                          ~
         3                        Pl\}    Fe       Wee 4                        |   8
         g                        { |  [a          (  Rf                            a
         -                       [|                   bes                           O
         5                        r |     aie                                       a
         2                          |                     !                         Orr
         5                         |            1     Po                            Oa
                                 [/|     2n       Se                             -  or    te
                                 r )     [{=E,    =     He                          S       |
    a Eps                        PR}     Don      Spee                                ua
        5                        ‘a               =     H                                    |
     i  8 3                                      S                                     tf    ,
    ©   Ca                                        S
       : 3                         |             2    ‘suav> sisv>                        | ;
    3S f24                       |
5	1	1	1	68	4	1171	2259	22	46	0	/
5	1	1	1	68	5	1452	2274	11	12	89	\
5	1	1	1	68	6	2154	2216	83	24	0	i
4	1	1	1	69	0	838	2246	1320	89	-1	
5	1	1	1	69	1	838	2325	1	10	4	\
5	1	1	1	69	2	887	2318	1	9	69	|
5	1	1	1	69	3	2153	2246	5	10	35	3
4	1	1	1	70	0	247	2243	1979	160	-1	
5	1	1	1	70	1	247	2369	8	29	74	Ww
5	1	1	1	70	2	300	2371	12	32	32	&
5	1	1	1	70	3	354	2358	15	39	31	%
5	1	1	1	70	4	823	2339	15	22	46	|
5	1	1	1	70	5	883	2331	4	39	59	|
5	1	1	1	70	6	1007	2308	116	72	22	fy
5	1	1	1	70	7	1144	2336	10	11	0	.i/
5	1	1	1	70	8	1182	2332	61	13	16	a
5	1	1	1	70	9	1347	2336	6	11	32	x
5	1	1	1	70	10	1418	2305	25	28	17	as
5	1	1	1	70	11	2086	2243	75	45	30	=
5	1	1	1	70	12	2225	2269	1	4	55	|
4	1	1	1	71	0	300	2309	1880	109	-1	
5	1	1	1	71	1	300	2404	12	13	26	e
5	1	1	1	71	2	354	2396	18	22	36	a)
5	1	1	1	71	3	834	2367	1	9	33	i
5	1	1	1	71	4	882	2373	1	10	0	!
5	1	1	1	71	5	1203	2347	13	15	61	|
5	1	1	1	71	6	1342	2337	26	13	22	=
5	1	1	1	71	7	1419	2333	42	16	0	-
5	1	1	1	71	8	2147	2309	8	5	0	.
4	1	1	1	72	0	300	2307	1882	137	-1	
5	1	1	1	72	1	300	2412	70	32	38	i]
5	1	1	1	72	2	830	2381	52	37	46	Il]
5	1	1	1	72	3	1005	2361	210	67	57	LOLA
5	1	1	1	72	4	1318	2357	52	28	33	Wee
5	1	1	1	72	5	1422	2350	47	24	93	=
5	1	1	1	72	6	2071	2307	111	125	60	a
4	1	1	1	73	0	354	2339	1888	128	-1	
5	1	1	1	73	1	354	2443	15	24	52	=
5	1	1	1	73	2	827	2422	3	22	77	}
5	1	1	1	73	3	876	2413	18	24	83	fe
5	1	1	1	73	4	1172	2389	40	25	48	=]
5	1	1	1	73	5	1304	2391	76	17	0	SA-
5	1	1	1	73	6	2065	2339	177	24	16	Lat
4	1	1	1	74	0	826	2364	1268	94	-1	
5	1	1	1	74	1	826	2448	1	10	5	{
5	1	1	1	74	2	1136	2422	31	22	44	«||
5	1	1	1	74	3	1195	2415	14	26	0	~
5	1	1	1	74	4	1368	2408	24	23	39	—
5	1	1	1	74	5	1431	2399	58	37	44	oe
5	1	1	1	74	6	2091	2364	3	34	45	|
4	1	1	1	75	0	354	2437	1121	92	-1	
5	1	1	1	75	1	354	2503	16	26	0	:
5	1	1	1	75	2	823	2474	72	24	47	Ik
5	1	1	1	75	3	1207	2437	22	46	44	\
5	1	1	1	75	4	1245	2407	51	101	44	\
5	1	1	1	75	5	1390	2437	85	29	41	dele
4	1	1	1	76	0	332	2483	1740	104	-1	
5	1	1	1	76	1	332	2552	21	35	92	/
5	1	1	1	76	2	1135	2511	14	30	0	\
5	1	1	1	76	3	1399	2508	3	1	52	<
5	1	1	1	76	4	1420	2493	105	30	23	FA
5	1	1	1	76	5	2070	2483	2	2	81	|
4	1	1	1	77	0	222	2556	1820	131	-1	
5	1	1	1	77	1	222	2673	4	14	0	:
5	1	1	1	77	2	283	2666	21	13	0	oo
5	1	1	1	77	3	864	2607	68	42	82	\o\
5	1	1	1	77	4	1149	2609	25	17	0	<
5	1	1	1	77	5	1242	2587	45	35	41	a
5	1	1	1	77	6	1423	2576	10	10	52	-
5	1	1	1	77	7	1558	2583	21	23	32	ey
5	1	1	1	77	8	1843	2573	11	12	0	:
5	1	1	1	77	9	2030	2556	12	12	0	[
4	1	1	1	78	0	222	2584	2068	130	-1	
5	1	1	1	78	1	222	2685	83	29	20	[op
5	1	1	1	78	2	910	2646	37	26	3	0\
5	1	1	1	78	3	1074	2655	8	7	72	)
5	1	1	1	78	4	1223	2638	11	12	51	.
5	1	1	1	78	5	1625	2616	15	13	48	\
5	1	1	1	78	6	2041	2587	39	20	37	en
5	1	1	1	78	7	2278	2587	12	11	24	°
4	1	1	1	79	0	222	2622	1917	115	-1	
5	1	1	1	79	1	222	2722	3	15	80	i
5	1	1	1	79	2	262	2713	37	22	55	>9
5	1	1	1	79	3	905	2676	61	32	0	\-A\
5	1	1	1	79	4	1508	2650	12	17	9	.
5	1	1	1	79	5	1655	2640	14	13	1	,
5	1	1	1	79	6	1757	2650	8	3	50	:
5	1	1	1	79	7	2056	2622	83	5	17	=f
4	1	1	1	80	0	222	2617	2022	147	-1	
5	1	1	1	80	1	222	2760	3	2	18	‘
5	1	1	1	80	2	261	2731	44	33	52	8
5	1	1	1	80	3	871	2706	4	4	62	\
5	1	1	1	80	4	902	2715	19	16	18	8
5	1	1	1	80	5	968	2703	9	21	81	\
5	1	1	1	80	6	1055	2702	8	6	18	*
5	1	1	1	80	7	1213	2688	47	24	8	Ye
5	1	1	1	80	8	1344	2680	10	4	0	<
5	1	1	1	80	9	1416	2676	11	10	32	tr
5	1	1	1	80	10	1501	2669	7	5	0	?
5	1	1	1	80	11	1597	2665	43	24	32	2
5	1	1	1	80	12	1670	2652	15	14	6	S
5	1	1	1	80	13	1758	2655	7	5	28	3
5	1	1	1	80	14	1814	2655	9	13	42	>
5	1	1	1	80	15	1921	2642	11	11	0	«
5	1	1	1	80	16	2037	2628	4	18	0	{
5	1	1	1	80	17	2064	2643	19	5	0	.
5	1	1	1	80	18	2174	2632	18	15	23	eT
5	1	1	1	80	19	2233	2617	11	36	0	‘
4	1	1	1	81	0	223	2655	1946	136	-1	
5	1	1	1	81	1	223	2768	76	23	35	re
5	1	1	1	81	2	906	2724	97	33	18	\Ne
5	1	1	1	81	3	1226	2707	102	27	49	Wey
5	1	1	1	81	4	1506	2684	63	25	43	KS
5	1	1	1	81	5	1619	2688	21	27	22	3
5	1	1	1	81	6	1658	2690	6	8	54	/
5	1	1	1	81	7	1734	2695	19	20	9	Ye
5	1	1	1	81	8	1874	2677	11	11	35	¥
5	1	1	1	81	9	2097	2674	22	13	44	oe
5	1	1	1	81	10	2133	2656	36	19	43	Le
4	1	1	1	82	0	223	2683	1882	152	-1	
5	1	1	1	82	1	223	2809	2	2	86	|
5	1	1	1	82	2	261	2790	38	45	0	:
5	1	1	1	82	3	881	2786	27	27	83	\
5	1	1	1	82	4	939	2754	64	30	26	ok
5	1	1	1	82	5	1189	2724	50	78	0	S
5	1	1	1	82	6	1380	2714	14	52	4	XK
5	1	1	1	82	7	1589	2709	35	62	23	9
5	1	1	1	82	8	1703	2713	56	37	20	1/18
5	1	1	1	82	9	1851	2716	10	12	32	©
5	1	1	1	82	10	2089	2683	16	53	31	i
4	1	1	1	83	0	261	2715	1879	124	-1	
5	1	1	1	83	1	261	2830	11	9	25	3
5	1	1	1	83	2	961	2787	46	11	32	\2
5	1	1	1	83	3	2059	2715	81	11	44	x
4	1	1	1	84	0	224	2738	1924	119	-1	
5	1	1	1	84	1	224	2848	80	9	32	Pf
5	1	1	1	84	2	990	2795	11	39	62	Zz
5	1	1	1	84	3	1353	2783	24	12	0	“)
5	1	1	1	84	4	1573	2788	11	11	0	@
5	1	1	1	84	5	1667	2775	12	16	63	Y
5	1	1	1	84	6	2046	2738	102	25	27	fe:

     |                                  \                  A     :    BO                a
     Bo                                \ \     o>             eo  .         :            SES
   a                                                          :                           i
> i 3                                    \  \        /                     Sky
9    —-9                                   KN        :
bn                                            1          ;   :             &             .         :
@ =                                        :                  .
Oo   «c                                                )      \
:                                                                          m             “8        4
    | 3                                        \               \            —O               >     Dd
S                                               \                          6                       Z
°                                              \              —)           Zz                    |
3                                                                          Q               Il      o£
oo                                                Poe                      m             r         a
                                                                   See:    NO     \   - *       |  <
                                                                                                    —_

Section 43

Page 43 of 135

J     l                       ?      ©                          9           :                          ———————_———
                               a                      _          as

~~         BLOCK 15       BLOCK 16      BLOCK 17   =     — =       Pe       |    elie          ——

        *                                                                   0)
                                                        PLY      Q
                            hen tap wh ea                       j                                 eS
                     aa                                                                             5
                    Q       ——— a                 ~            —— /= ©                            BLOCK 6
                                                          oo                                      7B ;

                               O                          ie,  BLOCK 3}    ne | ne
                                 >
5	1	1	1	11	2	1346	1136	41	17	0	—
5	1	1	1	11	3	1445	1078	460	125	28	Lr,
5	1	1	1	11	4	2463	1045	64	125	41	©
5	1	1	1	11	5	3086	1040	95	140	76	(
3	1	1	2	0	0	339	1148	2742	67	-1	
4	1	1	2	1	0	339	1148	2742	67	-1	
5	1	1	2	1	1	339	1170	81	44	93	SECTION
5	1	1	2	1	2	431	1184	23	17	92	&
5	1	1	2	1	3	463	1170	71	44	96	SKETCH
5	1	1	2	1	4	1069	1157	45	44	16	ee
5	1	1	2	1	5	1119	1199	37	16	26	X
5	1	1	2	1	6	1590	1148	21	60	90	/
5	1	1	2	1	7	1995	1151	21	47	84	|
5	1	1	2	1	8	2079	1152	16	61	32	UI
5	1	1	2	1	9	2147	1152	22	46	8	L
5	1	1	2	1	10	3076	1183	5	17	92	\
3	1	1	3	0	0	351	1210	2733	30	-1	
4	1	1	3	1	0	351	1210	2733	30	-1	
5	1	1	3	1	1	351	1210	50	16	63	VIEW
5	1	1	3	1	2	408	1210	108	17	96	REFERENCE
5	1	1	3	1	3	1140	1212	18	20	58	L
5	1	1	3	1	4	1529	1233	9	7	35	4
5	1	1	3	1	5	3083	1210	1	11	39	|
3	1	1	4	0	0	351	1172	2725	179	-1	
4	1	1	4	1	0	351	1172	2725	179	-1	
5	1	1	4	1	1	351	1221	92	42	95	SYMBOLS
5	1	1	4	1	2	1027	1231	32	94	74	\
5	1	1	4	1	3	1161	1235	20	21	54	é
5	1	1	4	1	4	1321	1241	41	40	56	oy
5	1	1	4	1	5	1360	1238	44	21	81	=
5	1	1	4	1	6	1424	1207	144	144	38	im
5	1	1	4	1	7	1582	1207	54	71	29	Pe
5	1	1	4	1	8	2846	1203	24	94	40	>)
5	1	1	4	1	9	2915	1172	75	148	30	Zz
3	1	1	5	0	0	351	1240	2618	116	-1	
4	1	1	5	1	0	351	1240	2618	116	-1	
5	1	1	5	1	1	351	1273	84	47	96	SECTION
5	1	1	5	1	2	443	1273	92	47	96	MARKERS
5	1	1	5	1	3	754	1285	34	39	49	©
5	1	1	5	1	4	1285	1240	112	116	15	SA
5	1	1	5	1	5	1681	1311	7	7	34	ee
5	1	1	5	1	6	2170	1294	28	23	66	©
5	1	1	5	1	7	2952	1324	17	8	45	g
3	1	1	6	0	0	352	1280	2654	127	-1	
4	1	1	6	1	0	352	1280	2654	127	-1	
5	1	1	6	1	1	352	1346	125	29	96	PERSPECTIVE
5	1	1	6	1	2	484	1346	104	29	95	LOCATION
5	1	1	6	1	3	595	1346	92	29	74	MARKERS
5	1	1	6	1	4	760	1344	21	40	68	oO
5	1	1	6	1	5	1218	1370	17	37	0	S
5	1	1	6	1	6	1255	1358	38	8	28	a
5	1	1	6	1	7	1404	1315	42	59	33	S
5	1	1	6	1	8	1605	1306	122	79	49	i,
5	1	1	6	1	9	1783	1312	129	70	1	Boca
5	1	1	6	1	10	2018	1326	46	54	8	Lt
5	1	1	6	1	11	2077	1364	48	17	68	ak
5	1	1	6	1	12	2141	1280	104	94	37	a
5	1	1	6	1	13	2874	1390	2	3	72	|
5	1	1	6	1	14	2949	1331	4	1	4	“
5	1	1	6	1	15	2982	1379	24	20	30	C
3	1	1	7	0	0	214	1383	3063	949	-1	
4	1	1	7	1	0	1207	1383	1806	65	-1	
5	1	1	7	1	1	1207	1385	54	63	2	&?
5	1	1	7	1	2	1390	1403	11	41	30	mS
5	1	1	7	1	3	1484	1435	2	2	17	O\
5	1	1	7	1	4	1838	1383	83	61	35	al
5	1	1	7	1	5	2063	1404	49	41	15	aes
5	1	1	7	1	6	2786	1413	2	2	21	“
5	1	1	7	1	7	2843	1424	2	2	48	f
5	1	1	7	1	8	2970	1395	43	43	3	Ye
4	1	1	7	2	0	1420	1436	1679	78	-1	
5	1	1	7	2	1	1420	1440	52	56	85	\
5	1	1	7	2	2	2656	1478	53	36	28	AS
5	1	1	7	2	3	2755	1455	32	55	7	Ys
5	1	1	7	2	4	3033	1436	66	38	4	eS
4	1	1	7	3	0	1488	1504	1278	57	-1	
5	1	1	7	3	1	1488	1520	604	40	10	SEE:
5	1	1	7	3	2	2527	1504	239	57	50	KSEE
4	1	1	7	4	0	1618	1555	1119	28	-1	
5	1	1	7	4	1	1557	1563	66	16	12	Dc
5	1	1	7	4	2	2093	1556	243	27	22	a
5	1	1	7	4	3	2537	1555	20	20	63	0
5	1	1	7	4	4	2589	1556	148	26	41	SKS
4	1	1	7	5	0	1106	1586	459	77	-1	
5	1	1	7	5	1	1106	1621	45	42	80	&
5	1	1	7	5	2	1544	1586	21	11	0	.
4	1	1	7	6	0	2974	1657	207	198	-1	
5	1	1	7	6	1	2974	1657	207	198	34	a
4	1	1	7	7	0	522	1777	203	22	-1	
5	1	1	7	7	1	522	1777	203	22	92	132005.1133.06
4	1	1	7	8	0	504	1811	238	22	-1	
5	1	1	7	8	1	504	1811	102	22	96	NOOSA
5	1	1	7	8	2	614	1811	128	22	96	COUNCIL
4	1	1	7	9	0	479	1845	286	22	-1	
5	1	1	7	9	1	479	1845	26	22	96	21
5	1	1	7	9	2	519	1845	174	22	96	SEPTEMBER
5	1	1	7	9	3	703	1845	62	22	96	2017
4	1	1	7	10	0	214	2043	2932	159	-1	
5	1	1	7	10	1	214	2086	296	43	96	PROPOSED
5	1	1	7	10	2	534	2086	267	44	93	PRECINCT
5	1	1	7	10	3	822	2087	21	42	91	F
5	1	1	7	10	4	865	2086	406	47	95	DEVELOPMENT,
5	1	1	7	10	5	1616	2077	117	29	92	ALTUM
5	1	1	7	10	6	1747	2077	308	30	55	CONSTRUCTIONS
5	1	1	7	10	7	2143	2077	260	43	0	8enysy/#rer
5	1	1	7	10	8	2424	2076	95	39	46	ran
5	1	1	7	10	9	2991	2043	155	159	18	r=
4	1	1	7	11	0	2143	2133	821	32	-1	
5	1	1	7	11	1	2143	2133	38	12	84	issue:
5	1	1	7	11	2	2199	2133	17	12	92	09
5	1	1	7	11	3	2253	2133	40	12	81	date:
5	1	1	7	11	4	2309	2133	62	12	96	06-06-17
5	1	1	7	11	5	2595	2139	22	22	88	BI
5	1	1	7	11	6	2658	2139	31	22	96	kb
5	1	1	7	11	7	2771	2140	9	25	91	J
5	1	1	7	11	8	2820	2139	13	22	92	k
5	1	1	7	11	9	2904	2140	18	21	92	D
5	1	1	7	11	10	2961	2140	3	4	81	1
4	1	1	7	12	0	214	2145	2709	75	-1	
5	1	1	7	12	1	214	2152	206	59	96	NOOSA
5	1	1	7	12	2	439	2152	242	59	96	SPRINGS,
5	1	1	7	12	3	705	2152	207	59	96	NOOSA
5	1	1	7	12	4	934	2152	174	59	96	HEADS
5	1	1	7	12	5	1617	2176	87	31	96	FIRST
5	1	1	7	12	6	1718	2176	125	31	96	FLOOR
5	1	1	7	12	7	2145	2178	183	28	91	7038-DA05
5	1	1	7	12	8	2596	2215	10	5	0	;
5	1	1	7	12	9	2622	2145	162	75	7	nicer)
5	1	1	7	12	10	2785	2145	102	75	21	Leon
5	1	1	7	12	11	2894	2168	29	52	39	|
4	1	1	7	13	0	2962	2288	315	44	-1	
5	1	1	7	13	1	2962	2288	105	44	95	Page
5	1	1	7	13	2	3083	2288	48	35	96	43
5	1	1	7	13	3	3147	2288	42	35	95	of
5	1	1	7	13	4	3205	2288	72	35	96	135

Section 44

Page 44 of 135

a       ae              iL -     |
                                                           TD Rar eet] |                                         if      et    }
              ae       £. cat                   ]         |    il                                     pl ; ie       eee emer   | V          i
                                                                                                                                          aC
             —      TF .                                 —                                                                       Le      i
               ig          RG                ie     4            a                                =     wy, e    .    ' My   VA y
            eo             at   2                       =       < tenet                                 ad     lll        ha a
            SEES Fe                            ;            .                      ea
RECEPTION ENTRY , CAFE AND CONVENIENCE               7                                                                     ee  basa   a

                          Ps                                         ae    ‘   z
                                                                                       ain!                           i
                                                    bere ae seed                       a  bal |                       :
                        =                            Fis            7      Se               =                ies —        “—            Fn
            .                                        a                     =    Be a   pms fd]                  Sr Eh) aati i te =
       =                                    ae       i:         (—_                               =e
                                                     ia        F.         La             —

VIEW FROM OPEN SPACE TO OUTDOOR DINING                    poe
              al                 _               Bes a            ie                                            eg   PE           ences
      —    Le JF .               ff                                      }                     =             Ti! &     st        =
      hom  ha        ae     :     =                 Seer         iy oe                        (a           =     a]     is: itititiviet+iviei ++ ol
             Gi ay 1 bE           =              ie  Bit patie    oS SE:                                  SS           ittejete Sati titietet ein sy :
                   SS               =           nee rE            fA $y x                                                              a               rt
OUTDOOR DINING AND APPROACH TO OPEN SPACE  SERVICE WINDOW AND POOL ACCESS   :                APPROACH TO RESORT ENTRY                                 —_
 PROPOSED PARKRIDGE NOOSA                                                ALIUM CONSTRUCTIONS         fan                                         Es
                                                                                                     swe: oO date: 19-05-17  BI kb    J k    D  e
 NOOSA SPRINGS, NOOSA HEADS                                              PERSPECTIVES                7088_A017_01_01          “wreecture Landecape | errs
                                                                                                                                            Page 44 of 135

Section 45

Page 45 of 135

APPROVED PLANS
                 132005.1133.06                                                                                                           l
                NOOSA COUNCIL                                                           ee
              21 SEPTEMBER 2017                                                            So                             |   h      =     b      N
                                                                                                                      a Ts eZ    ios] j LS ve    LY i
                                                                                                                         r  Oi     SD ai Gi A      _
                                                                    at                                                 ros
                                                                    to                                    ep       | ’ ae           A sae || |
                                 a                                      a                   |           |      | Ya y On|
                        en           “se               te         |  Sa                               / >) al   lines hee <I Sain  oh ae
                          ms              B83               =           =      eon     A                     ra      4    we      fe aes    ;  Stir iets
                                         Bie te            ey                   NY geen daa | ——S—    -       L  hy Pd CH om mee ee   gant tn
                           :          :  eS zk                        a eh             Pied               ee                —
                   QUARRY CAFE - VIEW EXAMPLE 01 - INCLUDES GREATER ADDRESS OF RECEPTION, VIEW TO PARK AND LESS OF BLOCK 3 EAST FACADE
                                    ; _w wee                                                                               ,   -
                            _—                                                                 |   fr            PIeee |
                                                    PTT                                             ti ne    in   q il beat Te
                                                                                       774             SS             5
                                            a                                        oP                ol
                                                       |                               $               Iie           ‘     ie]    +
                              F        =]                                              ee:                 E   iS SS       eS
         .            {Hi   i               q     |   |                              +4                    ih   ha |      pl L   Pet
                       tj H Hi                                                       a4                 Zz        aoe    —        H
  cs                a                 reese     ee                                   eae               ye  ee
            te      “We a aha tole ita eit een            =   Nia            ne     _p-se= Fare |                   a Fe 4 2      :
                =                   ee                                                                         Be

 QUARRY CAFE - VIEW EXAMPLE 02 - INCLUDES GREATER ADDRESS OF CAFE, LESS VIEW TO PARK AND GREATER EXTENT OF BLOCK 3 EAST FACADE
PROPOSED PARKRIDGE NOOSA                                                ALTUM CONSTRUCTIONS          a                                            Fe
                                                                                                     sues Oh gates was       Blackburne Jackson Design
NOOSA SPRINGS, NOOSA HEADS                                               QUARRY CAFE VIEWS           7088_A017_03_01
                                                                                                                                              Page 45 of 135

Section 46

Page 46 of 135

2 \       I cn r |     3 en a |     | ne | |    ree      BLOCK 19                              mee           |
4	1	1	1	2	0	273	474	3047	106	-1	
5	1	1	1	2	1	273	534	2	2	91	|
5	1	1	1	2	2	414	501	36	79	41	»
5	1	1	1	2	3	826	508	51	66	52	a
5	1	1	1	2	4	1175	491	50	77	0	Yl
5	1	1	1	2	5	1960	490	244	33	15	lial
5	1	1	1	2	6	2552	474	768	71	19	Se
5	1	1	1	2	7	3056	470	145	86	0	ET
4	1	1	1	3	0	600	694	2693	113	-1	
5	1	1	1	3	1	600	763	4	3	37	|
5	1	1	1	3	2	1026	694	312	113	0	neat
5	1	1	1	3	3	2718	729	148	70	33	Jone
5	1	1	1	3	4	3037	722	256	62	34	ert
4	1	1	1	4	0	905	730	2130	109	-1	
5	1	1	1	4	1	963	776	250	44	41	aS
5	1	1	1	4	2	1260	783	171	40	39	er
5	1	1	1	4	3	1841	798	71	41	66	=
5	1	1	1	4	4	2678	766	131	73	30	Nay
5	1	1	1	4	5	2795	762	41	81	26	te
5	1	1	1	4	6	2917	730	118	105	4	Lo
4	1	1	1	5	0	843	801	2053	127	-1	
5	1	1	1	5	1	843	801	117	127	13	ys
5	1	1	1	5	2	1214	806	40	122	65	|
5	1	1	1	5	3	1728	854	47	48	78	O
5	1	1	1	5	4	2645	830	124	45	0	LEASS
4	1	1	1	6	0	763	848	1948	64	-1	
5	1	1	1	6	1	763	848	11	45	7	ts
5	1	1	1	6	2	1902	883	25	20	39	i
5	1	1	1	6	3	2039	862	21	50	0	Co
5	1	1	1	6	4	2336	866	36	41	0	bd
5	1	1	1	6	5	2612	871	99	39	4	Dg
4	1	1	1	7	0	855	866	2392	122	-1	
5	1	1	1	7	1	855	952	337	4	38	VEE
5	1	1	1	7	2	1214	912	215	34	28	ET
5	1	1	1	7	3	1454	903	242	85	46	Es
5	1	1	1	7	4	1922	888	108	42	12	SES
5	1	1	1	7	5	2049	914	103	45	0	ione
5	1	1	1	7	6	2574	910	42	50	0	“
5	1	1	1	7	7	2703	866	137	84	33	fae)
5	1	1	1	7	8	2867	904	29	18	0	&
5	1	1	1	7	9	3201	945	14	22	47	;
5	1	1	1	7	10	3230	886	17	29	72	f
4	1	1	1	8	0	1386	941	1813	100	-1	
5	1	1	1	8	1	1386	969	29	57	30	—_
5	1	1	1	8	2	1697	958	10	9	16	|
5	1	1	1	8	3	1751	971	78	39	26	ees
5	1	1	1	8	4	2453	954	116	56	0	Nat
5	1	1	1	8	5	2622	941	224	61	0	aeey,.S
5	1	1	1	8	6	2956	955	197	86	33	oN
5	1	1	1	8	7	3172	971	27	48	81	/
4	1	1	1	9	0	1778	990	1377	140	-1	
5	1	1	1	9	1	1778	995	843	110	29	Reggae
5	1	1	1	9	2	2354	964	86	170	36	or
5	1	1	1	9	3	2832	990	323	140	46	A
4	1	1	1	10	0	1461	1047	1680	133	-1	
5	1	1	1	10	1	1461	1101	84	21	96	BLOCK
5	1	1	1	10	2	1555	1101	13	21	96	2
5	1	1	1	10	3	1887	1069	51	67	29	al
5	1	1	1	10	4	2048	1064	374	116	0	Seated
5	1	1	1	10	5	2927	1047	180	130	29	ZO
5	1	1	1	10	6	3108	1076	33	61	14	\
4	1	1	1	11	0	1393	1127	1736	118	-1	
5	1	1	1	11	1	1393	1137	41	79	14	&g
5	1	1	1	11	2	1754	1151	23	28	12	M4
5	1	1	1	11	3	1790	1148	69	97	27	Fe
5	1	1	1	11	4	1891	1148	98	97	22	tele
5	1	1	1	11	5	2160	1186	86	21	96	BLOCK
5	1	1	1	11	6	2255	1187	13	20	96	4
5	1	1	1	11	7	2348	1176	13	16	2	¥
5	1	1	1	11	8	2551	1156	63	62	49	ge
5	1	1	1	11	9	2798	1132	44	87	28	yo
5	1	1	1	11	10	2940	1127	189	105	48	Oe
4	1	1	1	12	0	1389	1177	1483	62	-1	
5	1	1	1	12	1	1389	1192	1	3	0	f
5	1	1	1	12	2	1466	1223	43	16	42	2
5	1	1	1	12	3	1804	1200	41	30	24	ry
5	1	1	1	12	4	1876	1217	11	17	0	;
5	1	1	1	12	5	2146	1177	93	44	95	BLOCK
5	1	1	1	12	6	2242	1177	30	44	92	4
5	1	1	1	12	7	2354	1191	18	23	0	o
5	1	1	1	12	8	2455	1187	22	47	43	is
5	1	1	1	12	9	2516	1197	9	17	39	XQ
5	1	1	1	12	10	2735	1186	26	40	66	\\
5	1	1	1	12	11	2857	1199	15	13	40	3
4	1	1	1	13	0	1336	1250	1803	151	-1	
5	1	1	1	13	1	1336	1341	46	30	32	Se
5	1	1	1	13	2	1639	1330	25	17	0	e
5	1	1	1	13	3	1803	1361	3	2	29	=

                                                                                 a            @e10ck 12°  Dp
                                             ~Y                               ©]           he §    \       z fe
                                                    A Ee                   |       me  Coy Re          4  -
                                            Su                    Peis           I BLOCK 10: Ho ’
                                                   \       .      i)      ae     any       \      te og
                                                    SF
                                                                                                                   a
2                                                                                                                  }
&                                                                                                                  +
5                                                                                                                  ~
oO    een
=     PROPOSED PRECINCT F DEVELOPMENT,                   See ae ese neine    we         SD
5	1	1	1	24	12	3146	2137	99	132	65	it
5	1	1	1	24	13	3309	2122	51	85	56	=
4	1	1	1	25	0	2279	2201	809	29	-1	
5	1	1	1	25	1	2279	2202	39	12	0	sue:
5	1	1	1	25	2	2339	2201	15	13	94	10
5	1	1	1	25	3	2391	2201	41	13	66	date:
5	1	1	1	25	4	2448	2201	63	13	92	29-09-17
5	1	1	1	25	5	2756	2207	5	23	45	1
5	1	1	1	25	6	2801	2207	15	23	92	k
5	1	1	1	25	7	2839	2214	15	16	91	u
5	1	1	1	25	8	2966	2207	15	23	92	k
5	1	1	1	25	9	3074	2214	14	16	91	e
4	1	1	1	26	0	158	2204	3202	70	-1	
5	1	1	1	26	1	158	2220	34	23	56	a
5	1	1	1	26	2	321	2220	227	50	95	NOOSA
5	1	1	1	26	3	571	2220	266	54	96	SPRINGS,
5	1	1	1	26	4	866	2220	225	50	95	NOOSA
5	1	1	1	26	5	1119	2220	194	50	96	HEADS
5	1	1	1	26	6	1725	2229	81	28	96	FIRST
5	1	1	1	26	7	1819	2229	118	28	96	FLOOR
5	1	1	1	26	8	2266	2207	83	66	87	7088
5	1	1	1	26	9	2359	2241	24	28	92	-
5	1	1	1	26	10	2397	2207	92	66	78	DAOS
5	1	1	1	26	11	2738	2208	38	22	0	aE
5	1	1	1	26	12	2833	2204	75	63	0	ncane
5	1	1	1	26	13	2944	2204	100	63	0	ewmaee
5	1	1	1	26	14	3054	2208	11	41	68	|
5	1	1	1	26	15	3076	2204	77	63	27	votes
5	1	1	1	26	16	3309	2228	51	34	59	Nh

Section 47

Page 47 of 135

_       one     —    en eee |             —                            y SME           if        /
                                                                                                             ARS EE
                      oe    elena                              Gl           |  ‘tall               ET                                 LN
                                 Lee               iets}   =                            |          aa |  | A...          A         tse MS 2!
                                           M   TF :                 |                                |   i ra... Y i        k
                Cn   fig? lll att                                                                 [eee           eee       ee
                      a        re           >    Bee           eae ee                     -      Are     4   : =:    ze a i    | setstetets
                 a            Rae                re.                  a eet                     mauled
                3s               e                                   eal      ed                                                      7
           RECEPTION ENTE CAFEAND CONVENIENCE          —        -    -
                     cae          ee                         fore                                                ae
                     1p           BE vi                                    aes                    ry
                     wT                                         rE                  TTR   TITY         Te
                          saseseseees                     Es f i MS 3] E  Bees =a ie ToT m1        =  a iia ——
                                                      tear        2       eet  eli    =
                                                               eee
           VIEW FROM OPEN FACETS OUTDOOR DINING              :                                                                 ___
         eee Ta                                      es           !                   |           WM ‘ |                          i
                  ;   eo ae oper           7                 (fh A yy?                      etna  Ct a |         ttititivivivivi«icl
                  ’      gle a Hw bisa     Fe               oF    a                                a             eibaeas        my
oS                      SS a                  |            cts       abe                                         SEELEY Ete i et         <i
5        OUTDOOR DINING AND APPROACH TO OPEN SPACE SERVICE WINDOW AND POOL ACCESS  APPROACH TO RESORT ENTRY
S                                                                                                                +.
=        PROPOSED PRECINCT F DEVELOPMENT,                              ALTUM CONSTRUCTIONS      Sesonsnearon rn
a        NOOSA SPRINGS, NOOSA HEADS                                    PERSPECTIVE SKETCHES     7038 - DAI!         reacts Mevacre

Section 48

GENERAL COMMITTEE MEETING AGENDA                                                                15 JANUARY 2018



3                        RAL17/0501 DEVELOPMENT APPLICATION FOR RECONFIGURING A LOT (1 LOT
                         INTO 6 RESIDENTIAL LOTS), LOCATED AT 2 DAVID LOW WAY, CASTAWAYS
                         BEACH
DOCUMENT INFORM AT ION




Author                           Development Planner, Lisa Pienaar
                                 Environment and Sustainable Development

Index                            ECM / Application / RAL17/0501

Attachments                      1.   Subdivision Proposal Plan dated 31 October 2017

         APPLICATION DETAILS
         Applicant                           Kenlynn Pty Ltd
         Proposal                            Development Application for Reconfiguring A Lot – (1 into 6
                                             residential lots)
         Properly Made Date                  17 August 2017
         Information Request Date            6 September 2017
         Information Response Date           17 November 2017
         Decision Due Date                   19 January 2018
         PROPERTY DETAILS
         Property Address                    2 David Low Way Castaways Beach
         RP Description                      Lot 71 MCH 2854
         Land Area                           9677m²
         Existing Use of Land                Duplex
         STATUTORY DETAILS
         SEQRP Designation                   Urban Footprint
         Locality                            Noosa Plan (16 September 2013)
         Zone                                Detached Housing
         Overlays                            Biodiversity – Environmental Protection and Riparian buffer
                                             Natural Hazard: Bushfire & Acid Sulfate Soils Overlay – Low Potential
                                             Acid Sulfate Area
                                             Natural Hazard: Landslide & Flooding Overlay – Landslide Hazard
                                             Area
                                             Natural Resources Overlay – Coastal Protection Area
         Assessment Type                     Code




                                                                                                    Page 48 of 135

Section 49

GENERAL COMMITTEE MEETING AGENDA                                                          15 JANUARY 2018


RECOMMENDATION
That Council note the report by the Development Planner to the General Committee Meeting
dated 15 January 2018 regarding Application RAL17/0501 for a Development Permit for
Reconfiguring a Lot – (1 into 6 residential lots), situated at 2 David Low Way, Castaways Beach
and:
A.    Refuse the application for the following reasons:
      1.   The proposed development is contrary to the Overall and Specific Outcomes of the
           Eastern Beaches Locality Code of the Noosa Plan. The development proposes
           significant clearing that is contrary to the Locality Code which requires protection of
           the vegetated character and views from the David Low Way and protection of native
           vegetation.
      2.   The proposed development is contrary to the Biodiversity code as it involves clearing
           of vegetation that is mapped as Environmental Protection and Riparian vegetation
           under the Noosa Plan.
      3.   The proposed development will result in unacceptable impacts on the visual amenity
           and character of the area.
      4.     The applicant has not demonstrated that a compliant, safe access is able to be
             provided to the site in accordance with required standards. To achieve a safe access
             significant clearing of vegetation and earthworks in the road reserve is also likely to
             be required.
      5.     The proposal is an overdevelopment of the site with the resultant development form
             detrimentally affecting the environmental and amenity values of the site.
B.    Advise the utility service providers that there is significant vegetation within the road
      reserve adjacent 2 David Low Way, Castaways Beach that requires detailed assessment
      prior to installation of any services to minimise potential impacts on this vegetation.
C.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


REPORT
1.    PROPOSAL
This application seeks approval for a Reconfiguration of a Lot to create 1 in to 6 residential lots
and an access easement at 2 David Low Way, Castaways Beach. The boundaries of the
proposed 6 lots extend across the entire site and include vegetation buffer areas in the form of
covenants around the boundaries.
The reconfiguration proposes the following lot sizes in Table 1 below with each lot to have a
defined building envelope:
 Lot        Total      Coastal Covenant (required for     Road Buffer Covenant       Building Envelope (vegetation
 Number     Area       stormwater, fire suppression and   (vegetation to    be       to be cleared)
                       structure protection purposes      retained)
 Lot 711    3336m2     83m2                               2142m2                     527m2
                                                          (includes  covenant   to
                                                          Burgess Creek)
 Lot 712    1219m2     102m2                              171m2                      618m2
 Lot 713    1181m2     102m2                              174m2                      613m2
 Lot 714    1118m2     174m2                              105m2                      565m2
 Lot 715     942m2     113m2                              183m2                      388m2
 Lot 716    1807m2     343m2                              746m2                      257m2




                                                                                              Page 49 of 135

Section 50

GENERAL COMMITTEE MEETING AGENDA                                              15 JANUARY 2018


Two different covenant areas are proposed over the site and include:
   Coastal covenant: 6 metre strip along seaward boundary. (Note: Plan of Development -
     Figure 2 does not include boundary setbacks within lots within covenant area however
     Vegetation Management Plan Figure 5 does include boundary setbacks in the covenant
     area).
   Road buffer covenant: 10 metre strip along David Low Way and includes area of land
     located over the northern part of the site, 50 metres from Burgess Creek.
The applicant indicates that covenant and vegetation buffers areas total 3643m2 or 38% of the
site and enable protection and rehabilitation of vegetation along David Low Way and to Burgess
Creek.
The proposed Statutory Environmental covenants include a number of requirements including:
   Retention of vegetation along David Low Way (10 metres wide) (road buffer covenant).
   Vegetation management obligations.
   1.5 metre black pool style, gate free fence along the entire seaward boundary to restrict
     uncontrolled access to the beach.
   Habitat Protection Area (road buffer covenant) – though indigenous vegetation where it
     poses a serious and imminent risk to human safety, including bushfire risk, may be cut
     down or trimmed to remove the risk.
   Bushfire Risk and Stormwater Management Areas (coastal covenant area) – No
     combustible mulch permitted. No vegetation that is a climbing vine, shrub or a tree or an
     environmental weed permitted. Only ground covers with a maximum height of 150mm to be
     maintained.
   Council obligations include maintenance of sight lines with regard to vegetation and access
     and maintain bushfire fuel loads in adjoining reserves.
The existing access to the site is proposed to be relocated further southwards to provide better
sight distances. An easement for access and services is proposed 10 metres from the David Low
Way. Carparking for the development would be provided on each individual lot and a service/bin
area is proposed within the access and services easement adjacent to proposed Lot 715.
The lots are proposed to be connected to nearby water and sewer infrastructure and stormwater
is proposed to be treated on site for each lot with a 100m2 detention basin located along the
eastern boundary of each lot. Earthworks are also proposed for the site with the existing
northern knoll excavated by 2 to 3 metres and used to fill the low vegetated portion of the site.
The site will be substantially cleared as part of investigation into Unexploded Ordnance as well
as required for fire suppression and structure protection.
The following information was submitted as part of the application and information request:
   Vegetation Management Plan - Cardno
   Ecological and Bushfire Assessment – Cardno
   Civil Engineering Assessment - Sheehy and Partners
   Specific Engineering Assessments: Dr. T. Johnston/Cardno - Coastal Hazard and Erosion,
     Flooding, Acid Sulphate Soils Geotechnical Assessment Stormwater Management
   Traffic Engineering Report – TTM P/L
   Unexploded Ordnance Assessment - OPEC Systems
   Bushfire Management Plan – prepared by Cardno
   Fauna Assessment prepared by Cardno



                                                                                  Page 50 of 135

Section 51

GENERAL COMMITTEE MEETING AGENDA                                               15 JANUARY 2018


The applicant has also provided a copy of a Services Advice Notice from Unity Water which
indicates that the site is located within Unitywater’s connections area and that the applicant will
be required to demonstrate how they intend to connect the proposed lots to the existing sewer
and water mains. The concept plans provided indicate that further clearing is proposed in the
road reserve to accommodate the sewer and water mains.
A locality plan and proposal plans are detailed in Figures 1 to 5 below.




Figure 1 - Location of Site




                                                                                   Page 51 of 135

Section 52

GENERAL COMMITTEE MEETING AGENDA   15 JANUARY 2018




Figure 2 – Proposal Plan




                                     Page 52 of 135

GENERAL COMMITTEE MEETING AGENDA                                                                15 JANUARY 2018

       This plan has been prepared as a proposed subdivision                                                     =
    !   ‘The dimensions, areas and total number of lots shown
        and should not be used for any other purpose.
    @   hereon are subject to feld survey and are also to the                                                     >
        may have requirements under any reievant legisiaton »                                 Ce,                1G
        requirements of council and any other authority which
                      eee                              =                  3           <                          in
        Information om this plan for any financial dealings                      fy)            .                7c
        involving the land.                                                       /             —*               sa
                                                                                Ls                     SS        <
                                                     >,                                                    ~e    in
                                                    Oo                                      i                    ix
                                                     i                                      4          ow         w
                                                                 oF                                                 =
                                                 2                               a                   os          ft
                                                z                         Ss                                      i
                                                                                              nN                 Epa
                                                            3    ma)           ~e                                aaF
                                    ow          Qa          4    re               st                             ibe
                                                  ee      ha         .   }       \ .    ay      .                 i .
                                                         |    a oe Wigs
                                         wg, te          ae ite
                                                              :    pa                       tT bord
                                                                     j    :     a      :           2   cease
                                                         Lo                                  | .cowk
                                                         t                 a                  fe
                                    ony                       iS)

                                                          &    Bre        7                                      ow
                                                         or    eS     .     /                                    —
                                                  =a’                                   dg Ba                    =
                                                              aN        J                BBB m2                  w
                                                   ZN                                                            5
    [| Covenant (Coastal)                            Zz.                 ,           716        2                 Zz
                                                      OD                    7 “=Total Area
    [] Covenant (Road Buffer)                                                      L607 m2                        5
                                                     New Road    K          |_| covn
    [| Building Envelope                               Ln?       a .        Sy Meter                             9
                                                         Toes \)                                                 Oo
      --- New Road                             4          °        \s\ .                                         w
                                                          2                                                      >
            Easement Schedule                             aR                                                     cr
   [identifer] _Benefit_  |          type               2 te          8                                            uv
       A          712        Access/Services/Council                  i
       B        711,713     Access/Services/Council                                                              S
       c      711,712,714   Access/Services/Council                le                                            -
       D      711-713,715   Access/Serices/Council            =     OF.
       E      711-714.716   Access/Services/Council           >       s\
       F        711-715      Access/Services/Council          ~<      ;      *              Note:
           Statistics Table                                            ;            Building Envelopes reflect
    a                                                                              minimum building setbacks
   ‘ares average [atm                J                                              as Per schedule 1 of the
                                                                                  Noosa Planing Scheme.
   [Park          CT      CNC
   [Covenant         |     01am                                  Contour Note:
                                                        Contour intervals are at 1.0m (minor) and 5.0m (major)
           a                                              Seale 1:160 = Lengths ove in Metres.
                       oI                  Leet
     SY)                          |}       oe         A                                               a
   ee              ae             le                             ee                 ee
              care 0 aweey =| LEVEL DATUM: | SITE: Proposed Lots 711-718 & Emt's AF & Cov HIN & PV CUENT-    :
Figure 2— Proposal Plan

                                                                                                    Page 52 of 135

Section 53

GENERAL COMMITTEE MEETING AGENDA   15 JANUARY 2018




Figure 3 - Proposal Plan




                                     Page 53 of 135

GENERAL COMMITTEE MEETING AGENDA                                                     15 JANUARY 2018

      This pian has Deen prepared as 3 proposed subdivision                                         rh
    | and should not be used for any other purpose.
    Bb, eeoermaieup rec mtee                                                                         >
      hereon are si                                  =    ST   rT a       r              ee
      requirements of council and any other authorty which ff SS           le    ;        ey  Fo      an
      may have requirement: under any relevant iegisiaton ,  nie ge     a    SF          0
      Cereficate of Tie for this site has not been obtained ‘ae! ee ia akg Foe        c              aun
      Therefore, no refance showid be pisced on the ae   ) Ser    oe    os a i                        c
      information on this plan tor any financial dealings ne ae Pee ae a  Po: ta,
5	1	1	1	10	16	1852	549	139	72	27	i
5	1	1	1	10	17	2130	543	16	71	64	;
4	1	1	1	11	0	383	574	1811	57	-1	
5	1	1	1	11	1	383	582	100	40	91	involving
5	1	1	1	11	2	483	582	37	40	80	the
5	1	1	1	11	3	523	582	58	40	65	tend.
5	1	1	1	11	4	1054	574	20	57	2	i
5	1	1	1	11	5	1157	605	62	21	30	EE
5	1	1	1	11	6	1354	598	18	31	16	Oe
5	1	1	1	11	7	1417	597	66	29	7	Sy
5	1	1	1	11	8	1549	598	21	27	0	A
5	1	1	1	11	9	1570	594	216	31	2	Vee.
5	1	1	1	11	10	1811	585	18	50	47	|
5	1	1	1	11	11	1912	589	145	37	0	eet.
5	1	1	1	11	12	2134	584	60	42	38	‘0
4	1	1	1	12	0	1050	614	1144	51	-1	
5	1	1	1	12	1	1050	622	79	38	20	tae
5	1	1	1	12	2	1167	629	44	33	31	oe)
5	1	1	1	12	3	1401	624	33	39	26	i
5	1	1	1	12	4	1493	620	168	46	26	ee
5	1	1	1	12	5	1696	627	46	32	1	ed
5	1	1	1	12	6	1764	614	225	51	30	ee
5	1	1	1	12	7	2016	632	39	31	34	a]
5	1	1	1	12	8	2151	620	43	40	11	ES
4	1	1	1	13	0	340	632	1715	90	-1	
5	1	1	1	13	1	340	646	21	65	64	|
5	1	1	1	13	2	393	658	41	36	91	The
5	1	1	1	13	3	437	658	60	36	82	senal
5	1	1	1	13	4	505	658	55	36	54	photo
5	1	1	1	13	5	566	658	87	36	69	underay
5	1	1	1	13	6	656	669	25	19	65	it
5	1	1	1	13	7	686	658	75	36	31	denved
5	1	1	1	13	8	764	658	48	36	94	from
5	1	1	1	13	9	815	658	123	36	94	information
5	1	1	1	13	10	1080	658	17	16	37	ee
5	1	1	1	13	11	1157	659	21	40	60	XT
5	1	1	1	13	12	1325	632	80	87	27	a
5	1	1	1	13	13	1418	670	51	27	8	«?
5	1	1	1	13	14	1535	663	94	46	31	ete
5	1	1	1	13	15	1716	690	5	8	21	ase
5	1	1	1	13	16	1816	662	40	36	28	Paw
5	1	1	1	13	17	1857	652	35	50	0	ae
5	1	1	1	13	18	1921	646	134	76	20	SM
4	1	1	1	14	0	340	669	1717	95	-1	
5	1	1	1	14	1	340	715	20	18	0	o
5	1	1	1	14	2	382	693	95	29	0	supplied
5	1	1	1	14	3	481	693	29	29	93	by
5	1	1	1	14	4	515	693	154	29	74	Nearmap.com.
5	1	1	1	14	5	679	693	33	29	23	Bis
5	1	1	1	14	6	716	693	131	29	52	approximate
5	1	1	1	14	7	846	693	58	29	67	only.
5	1	1	1	14	8	1056	725	14	13	0	,
5	1	1	1	14	9	1121	699	65	34	85	=
5	1	1	1	14	10	1296	695	52	7	40	fun
5	1	1	1	14	11	1370	711	2	8	7	}
5	1	1	1	14	12	1427	697	8	13	0	\
5	1	1	1	14	13	1455	680	164	84	15	at
5	1	1	1	14	14	1644	692	8	26	0	7)
5	1	1	1	14	15	1781	692	9	33	0	fn
5	1	1	1	14	16	1838	669	59	94	30	Do
5	1	1	1	14	17	1909	669	82	94	32	feat
5	1	1	1	14	18	2052	706	5	5	13	ig
4	1	1	1	15	0	1058	729	963	40	-1	
5	1	1	1	15	1	1058	732	83	28	0	Dt
5	1	1	1	15	2	1157	739	22	23	42	a
5	1	1	1	15	3	1310	751	8	9	0	-
5	1	1	1	15	4	1342	732	21	31	11	A
5	1	1	1	15	5	1417	747	6	12	0	“
5	1	1	1	15	6	1467	729	2	2	14	:
5	1	1	1	15	7	1518	732	120	37	16	eye
5	1	1	1	15	8	1761	755	9	8	0	,
5	1	1	1	15	9	1793	729	23	20	0	}
5	1	1	1	15	10	1849	738	19	27	52	Wy
5	1	1	1	15	11	1894	760	5	4	17	4
5	1	1	1	15	12	1977	731	8	32	0	.
5	1	1	1	15	13	2010	732	11	18	0	‘
4	1	1	1	16	0	330	735	1857	76	-1	
5	1	1	1	16	1	330	778	74	12	0	==
5	1	1	1	16	2	405	765	72	34	95	New
5	1	1	1	16	3	476	765	77	34	92	Road
5	1	1	1	16	4	1079	778	4	5	1	s
5	1	1	1	16	5	1099	741	79	59	15	he
5	1	1	1	16	6	1254	768	18	34	20	-_
5	1	1	1	16	7	1353	742	58	56	31	cael
5	1	1	1	16	8	1536	758	26	40	0	,
5	1	1	1	16	9	1575	757	82	31	24	ee
5	1	1	1	16	10	1738	757	22	40	0	»
5	1	1	1	16	11	1783	738	82	73	0	ey
5	1	1	1	16	12	1880	761	53	38	8	Wis)
5	1	1	1	16	13	1974	752	34	50	20	rs
5	1	1	1	16	14	2041	776	1	3	30	)
5	1	1	1	16	15	2152	735	35	67	0	wn
4	1	1	1	17	0	1098	781	1093	38	-1	
5	1	1	1	17	1	1098	807	2	4	84	d
5	1	1	1	17	2	1152	796	2	4	59	4
5	1	1	1	17	3	1283	793	75	20	33	ee
5	1	1	1	17	4	1366	796	25	14	31	oF
5	1	1	1	17	5	1580	789	13	30	47	hd
5	1	1	1	17	6	1877	781	45	33	0	*
5	1	1	1	17	7	2049	798	2	12	0	:
5	1	1	1	17	8	2151	784	40	24	0	#5
4	1	1	1	18	0	915	792	1275	68	-1	
5	1	1	1	18	1	1010	800	38	63	47	||
5	1	1	1	18	2	1103	833	3	1	30	(ja
5	1	1	1	18	3	1258	813	118	28	25	ein
5	1	1	1	18	4	1434	795	98	52	35	mete
5	1	1	1	18	5	1594	805	54	32	33	ei
5	1	1	1	18	6	1646	792	205	68	16	wet
5	1	1	1	18	7	1868	816	62	29	42	Re
5	1	1	1	18	8	2040	816	6	6	48	|
5	1	1	1	18	9	2151	806	39	39	27	iat
4	1	1	1	19	0	910	824	1280	108	-1	
5	1	1	1	19	1	910	824	44	65	43	be.
5	1	1	1	19	2	985	843	4	8	0	:
5	1	1	1	19	3	1090	847	16	18	28	®
5	1	1	1	19	4	1224	854	46	22	36	=
5	1	1	1	19	5	1262	836	26	51	29	ae
5	1	1	1	19	6	1338	840	181	36	0	ie
5	1	1	1	19	7	1626	842	28	27	28	oa
5	1	1	1	19	8	1720	841	56	48	60	me!
5	1	1	1	19	9	1771	839	146	93	44	‘per
5	1	1	1	19	10	2040	868	4	7	0	:
5	1	1	1	19	11	2151	831	39	77	20	4
4	1	1	1	20	0	954	873	1103	35	-1	
5	1	1	1	20	1	954	877	34	23	20	7
5	1	1	1	20	2	1081	874	5	14	68	;
5	1	1	1	20	3	1205	880	55	19	9	PE
5	1	1	1	20	4	1305	891	8	6	15	ke
5	1	1	1	20	5	1352	880	22	25	22	ee
5	1	1	1	20	6	1388	876	50	29	28	in
5	1	1	1	20	7	1441	873	73	31	13	te
5	1	1	1	20	8	1561	874	262	34	28	ONS
5	1	1	1	20	9	1821	863	34	49	0	|
5	1	1	1	20	10	1948	873	109	27	15	Tees
4	1	1	1	21	0	923	887	1268	54	-1	
5	1	1	1	21	1	923	897	8	6	0	y
5	1	1	1	21	2	934	893	16	37	0	>,
5	1	1	1	21	3	997	915	18	20	66	>
5	1	1	1	21	4	1067	923	5	12	38	{
5	1	1	1	21	5	1270	911	5	12	0	Fe
5	1	1	1	21	6	1424	897	83	44	11	ee
5	1	1	1	21	7	1529	887	48	48	6	%.
5	1	1	1	21	8	1595	920	7	14	36	2
5	1	1	1	21	9	1634	889	54	40	37	bi
5	1	1	1	21	10	1751	910	22	27	0	‘
5	1	1	1	21	11	1799	908	89	33	29	ee
5	1	1	1	21	12	1931	887	63	53	19	®
5	1	1	1	21	13	2174	899	17	15	65	=
4	1	1	1	22	0	919	915	1272	59	-1	
5	1	1	1	22	1	919	926	16	17	7	AF

                                                              yh         on         NO   r   te,      |
                                   ay M,  ~         I    ae    -    a     a Bi Pride                   :
       N                                  Sige        REE ng me Se)                                  i
                                  PM  ;   ao    P+ - es Eo    7  ; SZ a Wires wr s.  ee , “Wi eh a)
                                   i SC         eh Bae             Phe              Pe at             :
                                    >    OF            ae ct        “OR        eee)      ee   ae
                                  LY Me            a sf              a              sae     Pes q
                                         DR         8    nay       Tat
                                     me ||      [ERY      Total Area       =       FF           tCsCd
                                      :             ee.  ae     27       Ble   te Mea Oe ll m ‘
                                   rs           toh                     618m      fal  ay a
                                    Nor Road       WE  yghed  PIS ee              Ise     cg
                                   Y ¥              Seis)      a           Sy         ee   SE
                                   hae   |  Wrest? ape       LFF          de. Bar) bf   oan
                                      -    ‘      te >             ) ne     ime | 3}      raat *
                                   —       2           RR ee ee ef he 7 i                   v2
                                            ’       “ae        pn     area         a            -
                                   o    7).     Ly  ag       ‘otal Are pes ave   PS te      # oa
                                   ee                         rare me eel.                   |       lo
                                   ie                          eee Agee                        |     (CS
                                                  BREE          715°    Boe eel       ig
                                                gale BAA cr       otal  area? ae as                   Oo
                                     oe  si" eh iy ra          on,           PO     etn aa   g'
                                   Pad   is    oe 1 eli at aor     ne  :  ~   win ae eC. 5 ) $.      <
                                           NS           M7                     tee            |
                                   he a    “    UC        we. yes  r    y       os    ‘s Ed     :     oO
                                   be      eS Walk     ee                   7176    [                |
                                  be oe - 4 3          it ALD       oe Rita! Area .                  vu
                                      al te      bao   PANG aT ie        rer        ,
               Note:               ae Tat        4 se AN              II                             Da
      Building Envelopes reflect   [      = 4A?         -: ahve       eee                            9
         als                            :  -. New      *       Ay      Corn        Y
      minimum building setbacks      Se ee         | Rea            ol          os                   S
       as per schedule 1 of the    hak    te         eee           ahs        igh                    =
      Noosa Planning Scheme.         “               oh       ah     ae      AY                      >
           Easement Schedule                    -     De A. aa         Me     Pages 1]               rr
    ———     Sa         |e)                                    eS FR)          ‘  a                    vU
      A         712      Access/Services/Council      ! i     ee    m hy           ae
      B       711,713   Access/Services/Council és     es        CA      eee      r.                 5
      c      711,712,714 | Access/Services/Council i.  cs    at = pn ee             .                z
      D     711-713,715  Access/Services/Council ie    a         ee  1,       .
      E     711-714.716 | Access/Services/Council ae         RAE          i  fet
      F       711-715    Access/Services/Council a      i  pee See       a eA
          Statistics Table                        te | | eels 4 Bs.        ANE hd
    oe                                             poe       a    e. rE        Sere
                         ;      ;                 - |   a        5    ‘        an <n
  |Arearange      | 042m‘ - 3336mi |           ei        A  ee   A» ;             :
  |Areaaverage | 160im’                          a                Ho ee oe
  [Road           |       2m                     ges     JE    eee         eae      ay
   Park           |    CN CS
  [Covenants SSIS              CC                        Contour Note:
                                                  Contour intervals are at 1.0m {minor and 5.0m (major)
 —                                                              ee                    es
               BEVIaIO
                      ho                        de  ee     Ue      fe       ee
                              - | Sire:     Mc 7H718 & Emt's AF & Cov HIN SPV (CUENT:     SCALE 1:760 (A3)
fess be             [meio |              ema mmett                 | Kentynn Pay Les
Figure 3 - Proposal Plan

                                                                                         Page 53 of 135

Section 54

GENERAL COMMITTEE MEETING AGENDA                             15 JANUARY 2018




Figure 4 – Vegetation Management Plan – Construction Phase




Figure 5 – Vegetation Management Plan – Occupation Phase



                                                               Page 54 of 135

Section 55

GENERAL COMMITTEE MEETING AGENDA                                               15 JANUARY 2018


2.    SITE DETAILS
2.1. Background
The site has an existing approval for a duplex under TPC 2566 issued in 1993 and reflects the
existing two buildings on the site.
The most recent approval over the site relates to a reconfiguration of a lot to create 2 lots and
access easement under REC16/0015. Due to issues relating to bushfire and effluent disposal, a
Preliminary Approval was issued by Council in September 2016. Following lodgement of
submissions and further reports addressing the above issues, Council issued a Negotiated
Decision Notice for the Reconfiguration. The applicant subsequently lodged an appeal to the
Planning and Environment Court of 16 January 2017 seeking a reduction in the approved
covenant area of the lots. Council’s experts for the appeal have been appointed and are currently
reviewing the matter with Council’s solicitor. A copy of the negotiated subdivision layout is
detailed in Figure 6 – Negotiated Subdivision Layout for REC16/0015. The approved plan
detailed two lots with significant areas of the site including existing vegetation to be retained.




Figure 6 – Negotiated Subdivision Layout for REC16/0015

The applicant had a pre-lodgement meeting prior to lodging this application proposing a 1 into 3
lot subdivision. At that meeting officers indicated a 1 into 2 lot subdivision was more appropriate
reflecting the existing approval for the duplex.
Given the site is located within the Coastal Management District the applicant was advised they
should consult with the Department of Infrastructure, Local Government and Planning (State
Assessment and Referral Agency) which they did on 30 June 2017. The Department supported
vegetation covenants along David Low Way and the northern part adjoining Burgess Creek.
The current development application was lodged on 11 August 2017, with a Council information
request issued 6 September 2017. This information request detailed sixteen items to be
addressed, including clearance of vegetation, Biodiversity provisions, Unexploded Ordnance
(UXO) clearances, bushfire, fauna, size of building envelopes, water quality and stormwater,
easement and covenant details and sight lines and access. The applicant responded to the items
raised on 10 November 2017.
                                                                                   Page 55 of 135

Section 56

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018


2.2. Site Description
The site is situated on the eastern side of David Low Way directly to the south east of the
Burgess Creek bridge near the residential suburb of Castaways Beach. The site has an area of
9677m2 with a frontage to the David Low Way of approximately 254m2. Two dwelling units are
located on the site accessed from a central driveway off David Low Way.
The site is an isolated lot that is well separated from the existing developed residential suburbs of
Sunrise and Castaways Beach by the existing David Low Way road corridor and environmental
area surrounding Burgess Creek.
The site’s elevation ranges from 4m AHD to 24m AHD and generally slopes down from the
southern corner to the existing dwelling and then falls steeply to the Burgess Creek boundary.
The slope to Burgess Creek is approximately 38%.
Dunal vegetation is located throughout the site and generally consists of Spinifex grassland,
Black Wattle, Coastal Casuarina, Acacia, Banksia, Pandanus, Carrotwood and Coastal Aspin.
The site is almost wholly located within a riparian buffer area identified by the Noosa’s Plan’s
Biodiversity Overlay.
2.3. Surrounding Land Uses
The site abuts a 92.8ha reserve to the east (Castaways Beach Park) and Burgess Creek to the
north which are zoned Open Space Conservation. Adjoining the site to the west is David Low
Way and further south-west across the road reserve are detached dwellings located off Driftwood
Drive and Caribbean Court.
3.    ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
    State Planning Policy;
    South East Queensland Regional Plan;
    Planning Regulation 2017;
    The Noosa Plan.
The statutory planning instruments relevant to this application are discussed in the sections that
follow.
3.2. State and Other Statutory Instruments
State Planning Policy
Under the State Planning Policy, the site is mapped as being affected by the following:
    Coastal Environment: Coastal Management District
    Bushfire Prone Area
    Erosion Prone Area
    Medium Storm tide inundation area
The above State Planning Policies are generally reflected in the planning scheme.




                                                                                    Page 56 of 135

Section 57

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018


Biodiversity – Matters of State Environmental Significance (MSES)
The northern portion of the site is identified by the state as being mapped as MSES - Regulated
vegetation (wetland). The applicant details that this matter was raised by SARA at a pre-
lodgement meeting wherein it was stated that the vegetated area on Lot 711 will be protected.
The applicant has addressed the MSES status in the Ecological and Bushfire Assessment Report
submitted as part of the application and contends that:
This suggestion has been investigated and it has been determined that this particular MSES
does not apply to the Site… as the regulated vegetation that occurs on the Site is not a wetland
regional ecosystem and there are no wetland areas on the Site, apart from a narrow fringe of
wetland associated with Burgess Creek.
The proposed clearing and subsequent future building works on the site will detrimentally impact
on the coastal vegetation on the site with the vegetation adjacent to Burgess Creek being subject
to understory clearing in order to gain unexploded ordnance clearance. The existing vegetation is
critical in maintaining the ecological integrity of Burgess Creek. The vegetation is also important
in maintaining soil and coastal bank stability with the site having direct frontage to a coastal
foreshore.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint area of the SEQ Regional Plan. The Regional Plan
identifies that the Urban Footprint includes established urban areas and land with the potential for
new urban development. It incorporates the full range of urban uses including housing, industry,
business, infrastructure, community facilities…… The priority for developing land in the Urban
Footprint is to accommodate urban growth. However, the Urban Footprint is not an urban zone
and does not imply that all land can be developed for urban purposes.
The proposal is considered to be an urban development which accords with the intent of the SEQ
Regional Plan. However, it is noted that the Urban Footprint principles includes that the Urban
Footprint is a tool for managing, rather than simply accommodating, regional growth.
Planning Regulation 2017
The following assessment benchmark mapping apply to the application:
   Bushfire Hazard Area – Medium Potential Bushfire Intensity
   Erosion Prone Area
The applicant has provided a Bushfire Assessment Report and Bushfire Management Plan as
part of the application. The Bushfire Management reports conclude that the level of risk is
relatively low due to David Low Way and Burgess Creek acting as fire breaks, reticulated water
on site and access for each lots for emergency services. This aspect is discussed further in the
Natural Hazards Code assessment below.
The Bushfire Management Plan proposes Asset Protection Zones wholly co-located in the
proposed covenant areas for vegetation protection. The Assets Protection Zones require the
removal of all flammable material within this area including overhanging vegetation. The co-
location of this asset protection zone in the covenant areas will result in vegetation retained no
higher than 150mm.
The application was referred to the State due to the site being located in the Coastal
Management District. The Department of Infrastructure, Local Government and Planning have
offered no objection to the proposed development and as a concurrence agency have directed
Council to impose conditions on any development approval.




                                                                                   Page 57 of 135

Section 58

GENERAL COMMITTEE MEETING AGENDA                                              15 JANUARY 2018


3.3. Statutory Instruments – Planning Scheme
The subject site is located in the Eastern Beaches Locality and is zoned Detached Housing. The
proposed development is identified as code assessable development within the zone and is
required to follow a code assessable application process, assessable against the following
codes:
   Eastern Beaches Locality Code;
   Reconfiguring a Lot Code;
   Landscaping Works Code;
   Engineering Works Codes;
   Biodiversity Overlay Code (Environmental Protection & Riparian Buffer Area); and
   Natural Hazard Overlay Code (Landslide Hazard & Bushfire Hazard).
The application has been assessed against each of the above applicable codes. The pertinent
issues arising out of the assessment against the codes are discussed below:
Locality Provisions – Overall Outcomes
The subject site is located in the Eastern Beaches Locality and is zoned Detached Housing. The
proposed development is required to follow a code assessable application process.
The Overall Outcomes for the Eastern Beaches locality detail the intent for the area with the most
pertinent to the development detailed below:
a)    New uses and works are located, designed and managed to—
      iii.  avoid significant adverse impacts on the amenity enjoyed by users of other premises,
            including acoustic and visual qualities;
      iv.   avoid significant adverse impacts on the natural environment, including native habitat
            removal, fragmentation and attrition; and
      v.    protect the natural beach experience and overall visual amenity for beach users;
j)    The locality’s complex dune system, forming protected valleys and exposed ridges leading
      to the Pacific Ocean or wetlands on the shores of Lake Weyba is protected;
l)    The especially deep eastern drainage systems including Sunshine, Burgess, Castaways,
      Marcus and Peregian Creeks are protected;
m) Particular values of the landform and landscape are maintained and protected including—
      ii.   the beach and the natural fore dune system stretching along the beachfront; and
      iii.  the coastal dunes, creeks and lagoons;
n)    The large diversity of indigenous vegetation, supported by the dunes and wetlands
      including wetland communities, stunted heath land communities and higher eucalypt
      communities, are maintained and protected for dune stability and attractive vistas from the
      David Low Way and the beach;
r)    Areas of native remnant or regrowth vegetation, including their biodiversity and habitat
      values are protected;
t)    Access to the fore dune and beachfront areas is provided via formalised communal access
      points designed to protect dunal systems;
u)    Vegetated views from the beach and the David Low Way are protected from the potential
      impacts of development;
w)    Access to the coastal areas is maintained north-south along the David Low Way and
      provides constantly changing vistas of the ocean and vegetated dune system, curving
      between densely vegetated national park to the west and wallum plains;
kk) For the Detached Housing Zone—single detached housing prevails that maintains—
      iv.     landscaping amongst buildings, retaining trees and vegetation wherever practical;



                                                                                  Page 58 of 135

Section 59

GENERAL COMMITTEE MEETING AGENDA                                                  15 JANUARY 2018


These outcomes of the locality clearly highlight the importance of maintaining the natural
environment and vegetation as well as maintaining the natural beachside experience through the
protection of vegetated views and surrounds. The site is currently well vegetated, has a limited
visual presence to the area and is separate to the existing coastal development west of David
Low Way. These current vegetated corridors of David Low Way contribute to the vegetated
landscape setting and are an important feature of the coastal area.
The proposed subdivision of the site does not give due consideration to the outcomes detailed in
the locality code, with the applicant stating that much of the vegetation on site is not of
conservation status and is to be removed. The proposed clearing works combined with the
limitations on future planting in the coastal covenant and clearing for fire management (which
includes the seaward covenant and side boundary covenant areas) and the proposed building
envelopes, provide no opportunity for retention of vegetation in lots or revegetation of the site
which is contrary to the outcomes of the locality.
The visual impacts of the proposed clearing on the current vegetation of David Low Way and
surrounding pedestrian coastal pathways are significant and do not address the outcomes of the
code which express the importance of maintaining vegetated views from the beach and the David
Low Way. The applicant has not provided any information regarding visual impacts of future
development and relies on the provision of the buffer to David Low Way.
The existing dwellings are currently visible from the northern and southern approaches of David
Low Way with the main building visible across Burgess Creek to the north (refer Figure 7 below).
Whilst this main building is to be demolished and the knoll excavated two to three meters building
height is still measured from the natural ground surface level and it is likely that portions of future
dwellings on the site will be visible from this northern portion of the David Low Way.




Figure 7 – View of existing main dwelling from David Low Way north of Burgess Creek bridge.
The existing main dwelling is also currently visible from the southern approach of the David Low
Way as illustrated in figure 8 below. As this dwelling is located on the northern part of the site
with the proposed lots located to the south, it is likely that future dwellings constructed on the site
would be visible from the David Low Way from the southern approach.




                                                                                      Page 59 of 135

Section 60

GENERAL COMMITTEE MEETING AGENDA                                                     15 JANUARY 2018




Figure 8 – View of existing main dwelling from David Low Way south of Burgess Creek bridge.



The existing smaller dwelling on the south of the site is also visible through the existing
vegetation on site and within the road reserve. The proposed clearing required for access,
building envelopes unexploded ordnance, bushfire management and coastal covenants which
restrict revegetation increases the visibility of the development in this location to the David Low
Way.
Site line clearing for the access driveway is also unclear with Council’s traffic consultant advising
that substantial clearing of vegetation and earthworks in the road reserve may be required to
achieve safe sight distances. This clearing would significantly impact on the current vegetated
road corridor.
Locality Provisions - Specific Outcomes
The proposal has also been reviewed against the Locality Code and whilst it generally complies
with many of the specific code requirements it does not meet the following Specific Outcome:
O2 The vegetated character of the David Low Way is protected and new development
recognises and protects the function, capacity and efficiency of the David Low Way as the major
north-south link throughout the coastal part of Noosa.
As detailed above, the proposal involves extensive removal of vegetation with the resultant
subdivision and future residential lots of 715 and 716 likely to be visible to the David Low Way.
Further, the Overall outcomes of the Landscaping Code reinforce retention and rehabilitation of
native wildlife habitat and riparian zones
Land Use & Works Provisions
The application has been assessed against the applicable codes detailed below
Proposed Lots
The Detached Housing zone details a minimum lot area of 600m2 and minimum average width of
17 metres for lots within the Eastern Beaches locality. The lot sizes range from 942m 2-1807m2
with the exception of larger lot 711, which is 3336m2 which includes Covenant P which serves to
provide separation to Burgess Creek. The proposal complies with the minimum requirements in
this respect.



                                                                                         Page 60 of 135

Section 61

GENERAL COMMITTEE MEETING AGENDA                                                      15 JANUARY 2018


The Code’s Overall Outcome includes provision for ‘lots avoid significant adverse effects on the
natural environment and landscape and minimise the risk of hazards for people and property’.
The proposed building envelopes range from 257m2 to 618m2, with an average size building
envelope of 494m2. The building envelopes are generally half the size of the lot. The lots contain
significant amounts of vegetation and building envelopes generally enable the landowner to
utilise the land to its greater extent with regard to building form. It would be expected that very
little of the vegetation within the proposed building envelopes will be retained. The applicant was
requested to address this issue at the information request stage, but declined to modify the
building envelopes.
Generally, the proposed building envelopes exceed the maximum building site cover of 50%
(ground floor) of the total site area required in the Eastern Beaches Locality code.
The following Specific outcomes of the Reconfiguring a Lot Code apply to this proposal.


Specific Outcome                    Probable Solutions       Proposal
O19 Stormwater run-off is           No solution provided     The applicant has proposed to provide 100m 2
managed so as not to cause any                               bioretention basins for each individual
adverse impacts on the built or                              allotment. This proposal would require
natural environment including                                conditions       ensuring    an    appropriate
changes in quality, quantity or                              Operational Works approval was sought that
location     of     stormwater                               ensured the water quality targets were
discharges.                                                  appropriately achieved, as well as covenants
                                                             placed over the basins to ensure individual lot
                                                             owners appropriately maintain the basins.
                                                             The expert geotechnical advice was that
                                                             drainage from the proposed subdivision could
                                                             rely on infiltration only. Geotechnical advice
                                                             provided for other sites along the eastern
                                                             beaches has indicated that coffee or other
                                                             floating rocks within the dunal system may
                                                             intersect concentrated water flows from the
                                                             hardstand areas and cause water to push out
                                                             the dune and cause scour. These other sites
                                                             have needed to install pipework that
                                                             discharges concentrated flows as low down
                                                             the dune slope as possible. A geotechnical
                                                             investigation to the presence of rocks within
                                                             this site would be able to give an indication if
                                                             this is required here to give a more realistic
                                                             understanding of any vegetation clearing
                                                             needed for installation of pipes for drainage
                                                             management in the event there are rock
                                                             floaters in the substrate.
O20 Filling or excavation only      No          prescribed   Proposed excavation on site and filling results
occurs where it does not            solution.                in removal of vegetation that is mapped on
adversely impact on—                                         Biodiversity Overlay maps.
a) watercourses, drainage lines
and wetlands; or
 b) vegetation on land identified
on Biodiversity Overlay Maps
OM1.1-OM9.1; or
c) water levels on properties
elsewhere.




                                                                                          Page 61 of 135

Section 62

GENERAL COMMITTEE MEETING AGENDA                                                            15 JANUARY 2018


Specific Outcome                       Probable Solutions          Proposal
O21        Land       development      S21.1 The natural           Proposal seeks to modify the site through cut
responds to the distinctive            landform      and           and filling of the site and removal of existing
landscape character of the site        landscape are not           vegetation across most of the site. Proposed
by utilising the natural features of   modified        to          modifications do not reflect the existing natural
the site, which include—               accommodate   the           undulating character of the site.
a) watercourses and drainage           development.
lines;
b) significant trees;
c) understorey vegetation;
d) rock outcrops; and
e) views
O22 Native vegetation, including       S22.1     Buffers      of   Existing vegetation around eastern boundary
individual mature trees are            existing          native    of site is to be removed. Minimal revegetation
retained, protected, maintained        vegetation around site      is proposed in this area.
and       supplemented,      with      boundaries           and
particular consideration given         environmentally
to—                                    sensitive areas are
a) roadsides;                          retained             and
                                       reinforced      through
b) the amenity of adjoining land
                                       additional planting;
uses; and
c)the         protection       of
environmentally sensitive areas.

O23      Buildings   and    other      S23.1 All lots include      It is likely that the northern lots will enable
structures do not have a               a building envelope         dwellings to protrude above the ridgeline and
significant adverse impact upon        that enables buildings      result in the unnecessary removal of
the visual amenity of surrounding      and structures to be        vegetation.
areas.                                 sited so they do not—
                                       a) protrude above
                                       ridgelines; or
                                       b)    result   in   the
                                       unnecessary removal
                                       of vegetation from the
                                       site.



Engineering Works
The bulk earthworks plan associated with the application indicates that the northern knoll that
currently supports the existing dwelling is to be excavated by 2 to 3 metres with the lower
sections of the site filled 1.0 to 2.0 metres as detailed in Figure 9 below. These earthworks
further demonstrate areas of existing vegetation that will be cleared along with extensive site
modifications.




                                                                                                 Page 62 of 135

Section 63

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018




Figure 9 – Proposed cut and fill



Biodiversity and Coastal Protection
The Noosa Plan maps the site as being included in the Environmental Protection and Riparian
Buffer Areas. In accordance with the assessment table for the Biodiversity Overlay, a
reconfiguration of a lot application that involves clearing of native vegetation triggers assessment
under the code.




Figure 10 – Subject site and Biodiversity Overlay




                                                                                   Page 63 of 135

Section 64

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018


The applicant’s consultants contend that the vegetation on site does not satisfy the requirements
for classification as either an Environmental Protection or Environmental Enhancement area
under the Noosa Plan definitions, nor should it be classed as a Riparian Buffer Area.
The site is mapped as being located in a Coastal Protection Area however a reconfiguration
application does not trigger assessment. It is noted that future dwellings on the site will require a
future application for code assessment under the Overlay with the design considering protection
of the beachfront character and provision of native landscaping.
Council’s Environmental Officer advises the provisions in the Biodiversity Overlay make it clear
that the Riparian Buffer area is for more than just vegetation protection. It relates to broader
ecosystem values/services including maintaining bank stability, avoiding incompatible uses and
any new development. The site has a very specific function in terms of its buffering and
stabilisation of the dune system. Vegetation located on the dune system is naturally restricted
and retention of the vegetation also has an important role in this area for ecosystem services
such as fauna habitat, amenity, stability, community asset protection and maintenance of the
complex dune system functions.
Natural Hazards
The site is mapped as being located in Landslide Hazard, Bushfire and Acid Sulfate Soils Areas.
A geotechnical assessment has been submitted that concludes the site is not subject to
geotechnical instability and that the proposed development will not affect geotechnical stability.
However, were there to be any future dwellings on site, a specific geotechnical report would be
required confirming that development will not impact on the stability of the site.
The northern part of the site is mapped as a Low Potential Acid Sulfate Area and the applicant
has provided an Engineering Assessment that indicates due to the elevation of the site and
sandy composition, the site is unlikely to contain acid sulphate components. Conditions may be
imposed to address this matter.
A Potential Impact Buffer associated with the Bushfire Hazard Overlay is located along the north
western half of the site. This buffer relates to vegetation on site and on the western side of the
David Low Way to the south of Burgess Creek. The applicant details that the proposed risk of
bushfire is low due to the provision of a reticulated water supply to the site, formed access to
each lot, David Low Way and Burgess Creek provide an appropriate separation to bushfire
hazard in these areas and that proposed building envelopes will be more than 60m from bushfire
prone vegetation.
Bushfire management
The applicant has not provided a comprehensive assessment of the fuel loads on the site,
however has used the hazard mapping to provide an overall assessment. The applicant
recommends a 6m Asset Protection Zone to the east, north and south of the development
footprint. Within this zone all ground covers must be kept to under 150mm at all times. The north
western half of the site is mapped as being located in a Potential Impact Buffer in a Bushfire
Prone Area. The applicant relies on the Building Standards to determine Bushfire Attack Levels
(BAL) of construction and nominates a BAL rating of 19 with a caveat stating the BAL levels will
be finally determined at design and construction stage. A BAL19 rating requires a setback of 24m
from the hazardous vegetation. The applicant states the lot closest to the hazard has a setback
of 33m.
The applicant states the development will not unduly burden emergency services. It is noted the
landscaping around the house site areas will be required to be minimal and of low flammability so
there will be no opportunity for establishing native shrubs and trees.
The applicant also states Council’s obligations to keep the development safe, is to ensure all
vegetation within the sightlines are maintained at all times and maintain bushfire loads in the
coastal reserves so as not to present an unacceptable risk to residents of the development.



                                                                                    Page 64 of 135

Section 65

GENERAL COMMITTEE MEETING AGENDA                                             15 JANUARY 2018


Furthermore, the proposed management of the northern 50m covenant area can include
removing vegetation as it poses a serious and imminent risk to human safety, including bushfire
risk. The supplied documents appear to acknowledge the bushfire risk associated with placing
more people in a bushfire prone area and proposes managing the risk by removing the
vegetation.
Unexploded Ordnance (UXO)
It is noted that the site has been determined by the applicant’s consultants as ‘likely’ being
affected by UXO and that it will be required to be investigated and remediated. The applicant has
provided an indicative de-vegetation plan (refer Figure 11 below) which details that most of the
proposed site requires clearing, including hand clearance of undergrowth to the areas outside the
development footprint for investigation of UXO. The applicant proposes clearing of 62% of the
site to facilitate the investigation and possible remediation of the site for UXO.
The undergrowth in the proposed covenant areas along the David Low Way and to Burgess
Creek is proposed to be cleared by hand/brushcutter for the purpose of a visual survey. Any
identified significant vegetation will be marked and excluded from clearing.
The UXO clearing is to be read in conjunction with the Ecological and Bushfire Assessment
Report prepared by Cardno which indicates that Covenant Areas:
    Will be created after all civil engineering works and rehabilitation works have been
      completed.
    May be disturbed for maintenance of infrastructure and services and weed control following
      which they will be rehabilitated.




Figure 11 – Indicative De-Vegetation Plan for UXO clearing shown in red

Site Access
The proposal was referred to Council’s traffic consultant to ensure access to the site was in
accordance with required standards.
Council’s consultant advises the following:
The main issues relate to achieving satisfactory sight lines at the proposed new access driveway
in accordance with Austroads guidelines, and achieving a satisfactory gradient on the access
driveway in accordance with Australian Standards. The information submitted to date does not
represent a satisfactory resolution of those issues.

                                                                                 Page 65 of 135

Section 66

GENERAL COMMITTEE MEETING AGENDA                                               15 JANUARY 2018


A condition could probably be drafted to achieve safe and satisfactory sight lines at the new
access driveway, but the associated extent of vegetation clearing and earthworks required to
achieve such an outcome, both within the road reserve in both directions from the access, and
within the site north of the access, would be greater than anticipated by the material supplied to
date, and at the end of the day I’m not convinced that the new access driveway location would
achieve a better overall safety outcome, if similar levels of vegetation clearing were also applied
to the existing driveway.
A condition could also be drafted in relation to achieving a satisfactory vertical alignment on the
new driveway from David Low Way, but the associated implications on the existing bike path
alignment are unknown and could be substantial, and the associated extent of clearing and
earthworks required within the site as a result is also unknown.
4.   CONSULTATION
4.1. Referral Agencies
The application was referred to the following Referral Agencies:
   Department of Infrastructure, Local Government and Planning (SARA)
SARA is a referral agency for contaminated land (unexploded ordnance UXO) and Tidal Works
or work in a coastal management district.
The Department has responded advising that the proposal complies with the applicable
performance outcomes of the State Development Assessment Provisions for both coastal and
unexploded ordnance and lists two conditions requiring clearance of the unexploded ordnance.
4.2. Other Referrals
The application was forwarded to the following internal Council officers:
   Environment Officer, Development Assessment
   Engineering Officer, Development Assessment
5.   CONCLUSION & REASONS FOR RECOMMENDATION
The application for a Reconfiguration of a Lot for 1 into 6 lots located at 2 David Low, Castaways
Beach is not supported and recommended for refusal. Whilst the use of the site for residential
purposes is consistent with the intent of the Detached Housing zone, the proposal is considered
to be an overdevelopment of the site based on the environmental and amenity impacts and
safety issues associated with the development.
The site is located on the eastern side of David Low Way and currently presents a well vegetated
boundary to the surrounding area. The site is well separated from the existing residential areas of
Sunrise Beach and Castaways Beach by the vegetated road reserve of David Low Way and
Burgess Creek.
The applicant contends that the development is appropriate based on an environmental
assessment that concludes the site is degraded, has high level of weed infestations, significant
exotic plantings and has limited vegetation worthy of retention apart from the northern section of
the site adjoining Burgess Creek and along the David Low Way. The applicant has subsequently
proposed a six lot subdivision that necessitates clearing of approximately 62% of the site due to
UXO clearance requirements whilst the proposed Coastal Covenants around the building
envelopes limit significant revegetation as they are to be used for fire protection and stormwater
management with low growing vegetation.
The applicant has not adequately demonstrated that the risk posed by bushfire can be managed
whilst retaining the complex dune vegetation system.




                                                                                   Page 66 of 135

Section 67

GENERAL COMMITTEE MEETING AGENDA                                                 15 JANUARY 2018


The applicant’s submission that the site is incorrectly mapped is not supported. Council’s
environmental officer has reviewed the supporting documentation and concludes that the site has
significant vegetation values that should be maintained and incorporated into any development of
the site.
The applicant has not satisfactorily demonstrated that the proposed site access is appropriate
and complies with relevant standards and it is likely to require significant earthworks and clearing
of roadside vegetation.
The applicant has not satisfactorily demonstrated that the impacts of the development will be
appropriately managed. The proposed works will result in future development having a
detrimental visual impact on the surrounding area and are inconsistent with the Noosa Plan.
Departments/Sections Consulted:
   Chief Executive Officer        Community Services                       Corporate Services
   Executive Officer              Community Development                    Financial Services
   Executive Support              Community Facilities                     ICT
                                  Libraries & Galleries                    Procurement & Fleet
                                  Local Laws                               Property
                                  Waste & Environmental Health             Revenue Services

   Executive Services         x   Environment & Sustainable Development    Infrastructure Services
   Community Engagement           Building & Plumbing Services             Asset Management
   Customer Service           x   Development Assessment                   Buildings and Facilities
   Governance                     Economic Development                     Civil Operations
   People and Culture             Environmental Services                   Disaster Management
                                  Strategic Land Use Planning              Infrastructure Planning,
                                                                           Design and Delivery




                                                                                      Page 67 of 135

Section 68

Page 68 of 135

ATTACHMENT 1
      This plan has been prepared as a proposed subdivision                                                                         >
  |   and should not be used for any other purpose
      The dimensions, areas and total number of lots shown                                                                           >
  ™@  hereon are subject to field survey and are also to the                                                                        °
      requirements of council and any other authority which       Nw                                                                a
      may have requirements under any relevant legislation.    f      /                                      on                     ag Wn
      Certificate of Title for this site has not been obtained.      /                                          q                   3
      Therefore, no reliance should be placed on the         / a                      :             te           *                  2 c
      information on this plan for any financial dealings                                             16-44)   &                    g
      involving the land.                                                                          pe KN         eo                 zA0
                                                                  f                           e-          i         of Creek        ss <
                                                            =                             f— ve    a       =]                00'S   a
                                                           ° 4                                     a                                im
                                                          Ss                     =                                       00          Ps
                                                                          LE cove           itt                                       ae
                                                        Q                Ne an             —Potal Area               oI             se
        N                                               >=                  (Ce                 ee                                  ine
                                                       S                 x  Le       — _ 8336 m2                                    aoe
                                                                         Ng             Sing                                        g* 0
                                                       x             > fie                             AD                           one
                                                N/a                 Rak                       tee                                   ibe
                                        om                          ar    Psi               Ne         SVX \                        3@8
                                                          persed  fe S bE                           eV                              3
                                                         Aone |     Ef                                   —~                           2
                                                                   SR s                                    | Ws)                      =
                                                                    36   SE —_          ree
                                                                  o sk ‘Lal      ~            \      pies       v} CovH
                                                                  Rs ie                               ee      Xf 88m
                                                                 en     (4)                                  ae
                                                                           a                                  )
                                              New Road           2 sola.                                     fos .toeme   159
                                                                 ~        1                                     Cov J
                                                59 m2    a    r     3m a 4                             27           S      39/88
                                                                    a     ;                                             CP 8391
                                                                        J
                                                                B sgl       SS                               | Coy k
                                         Pas                       20 12).
                                                                  ae eee                                 2] coy                      ”
                                                                  sO IAP                                                             cc
                                                                  =   oN
                                                                   ee                                   :                            3
                                                               ov UL.     \ \ <                  y   6    113m?                      Oo
                                                                              ‘                   F     /..Cov M
                                                               ee      oS a                         /                                <
                                                         waechetes. \ Jo sie)               T= 7m     Bldg En                        n
                                                          oO            =                  &            5emne                        =
                                                                       \\\\\\E sh            /                  \                    Oo
        Covenant (Coastal)                                  Zz.             x1                     716          8                    z
                                                              Oo              4»            mea Total Area                           =
[       Covenant (Road Buffer)                                         1208  of \ 60             L807 m                              B
                                                                                Ne                       2
                                                            New Bead      yy      \       _| Sov                                      oO
        Building Envelope                                      im          “ya     |                                                 U
                                                     %            Os ‘as                                                             O
                                                                              Do!  \      |
       ——=— New Road                                            \  3           sl.< \                                                ”
            Easement Schedule                                                                                                        ~
  Identifier|  Benefit       | ——Type.~——=*«Y|«s:«S#NWem, Road”                  \. \
                                           ¥          -         12m2             S                                                   U
     A               2.       Access/Services/Council                            ry                                                  i
     B           711,713       Access/Services/Council                            Ki                                                 >
     Cc       711,712,714     Access/Services/Council                         east  \                                                Zz
     D        711-713,715     Access/Services/Council                  =      Odds)  |
     E        711-714,716     Access/Services/Council                  >         3
     F           711-715      Access/Services/Council                ) ~<        8       \
                                                                                 af       *                Note:
          Statistics Table                                       |                |              Building Envelopes reflect
                 i   i                                                           N                  Sets
                                                                 |                              minimum building setbacks
 [Arearange | 942 m*-_3336m" |
                              1601?                                                               as per schedule 1 of the
                                                                                                 Noosa Planning Scheme.
  Pak |SSCSNT
                              3614m"                                       Contour Note:
  Total Site Area             9677 m’                            Contour intervals are at 1.0m (minor) and 5.0m (major)
                                                                    poale: beth | Uengehin ieee Un: Rete,
 fi                                       S
 SURVEYOR: LOM Bare SiOne  LEVEL DATUM: | SITE: Proposed Lots 711-716 & Emt's A-F & Cov H,J-N & P-V CLIENT:           SCALE    1:750 (A3)
 ORAWN  L6    cieeRent tala benveorneupsu ss          5 Binvil Lions lays Sootdiornye Beach    Kenlynn Pty Ltd        PLAN REF: S0054-P5
                               AHD                           i

                                                                                                                   Page 68 of 135

Section 69

Page 69 of 135

Pill     AAS                   LED 659            Zo 32                                                                               a)   38    aoe 2 $o8a 88
   @               Py>|-                                                                                                               °    zz    Sean Soca es
                                                                                                                                       (   baa                   5
                                                                                                                                                            a aaa
 3        \5)7|/3/8                                  Soa                                                                                    Ba || seegissas
                                                                                                                                                   she    q2>1un.9
                                                                                                                                       1    ao    3 3 Z 2 z3 g a a z
   :      ale      2|3                             ag 32                                                                                    Se      Ses ae phas
                                                                                                            SS                         =    a 3.  e888 Se385e
                                                                                                                        2 ~~           2    z3    eeoR 2g52238
                                                                                                                                            -     Soe itegeoa
 & 8      a\5      Lila   ”                    m|® 2&3                                                                                      os      33g 5392388
                                                                                                                                       z|   ge    SiSez039S2
             s     al?    ~~         j                                                                                                      3<      x22 A002 pe
          =        ®             =          wo     pQac                                                                                     =       8    eB  382 B
                  (=)     9      ay             |  Ue      mz                                                                               =a      22% 905835
                                                                                                                                       a|   25    Sos2BGe 838
 rs       8               @|   SLL         \s\o    33220                                                                                    ae      z25<35232
                          oa     =a aN             o       5                                                                                =. a   Sag seshe
 ea]    tt]               |    223853 3/3          Sees |g                                                                                  38      238382323
                                                                                                                                                                 se
 -e/{|@                   oO;  ass             2   Cotas                                                                                    £3      peg see se
        i                 —      Saw    ox              =}    a                                                                             a      2.    a
 -                        oO)    Cae           “| Dan g                                                                                     a= || ¢22 232238
   :                 <                             $o8                                                                                      os      FTSSBS See
                     S|   [a                   M7023                                                                                        gs     G° Basa       &
 som               =|3,   a      >rPrrD            S533                                                                                     5	1	1	1	28	7	2937	834	18	11	0	&
5	1	1	1	28	8	3114	849	132	27	0	28°09ne
5	1	1	1	28	9	3292	858	19	16	1	FF
4	1	1	1	29	0	337	608	2969	298	-1	
5	1	1	1	29	1	337	608	56	43	74	is
5	1	1	1	29	2	508	629	217	52	0	&/S/5//a\)
5	1	1	1	29	3	801	672	39	8	54	1S
5	1	1	1	29	4	899	655	130	54	0	Bee
5	1	1	1	29	5	1064	678	39	47	60	8
5	1	1	1	29	6	1184	676	97	70	0	d/o
5	1	1	1	29	7	1307	704	128	38	0	o28
5	1	1	1	29	8	2702	844	96	40	24	ae
5	1	1	1	29	9	2937	847	14	27	69	g
5	1	1	1	29	10	3114	845	133	61	0	*sie3
5	1	1	1	29	11	3292	877	14	25	45	&
4	1	1	1	30	0	322	642	2468	247	-1	
5	1	1	1	30	1	322	642	71	27	23	Pape
5	1	1	1	30	2	508	666	191	29	0	VElElyf/e
5	1	1	1	30	3	801	684	29	26	35	@
5	1	1	1	30	4	899	694	209	31	66	888888
5	1	1	1	30	5	1258	731	5	5	43	:
5	1	1	1	30	6	1363	727	11	41	53	an
5	1	1	1	30	7	2450	845	148	18	16	geno
5	1	1	1	30	8	2610	841	52	41	23	Seow
5	1	1	1	30	9	2674	841	22	41	26	Oe
5	1	1	1	30	10	2769	870	21	19	46	te
4	1	1	1	31	0	324	653	2449	244	-1	
5	1	1	1	31	1	324	653	61	41	12	23z90
5	1	1	1	31	2	508	683	68	16	21	Ne
5	1	1	1	31	3	716	696	24	15	0	~
5	1	1	1	31	4	899	710	209	33	5	DRRADD
5	1	1	1	31	5	1184	738	38	27	81	a
5	1	1	1	31	6	2191	845	15	9	38	a
5	1	1	1	31	7	2301	845	11	6	0	q
5	1	1	1	31	8	2414	855	149	30	0	meee!
5	1	1	1	31	9	2560	851	37	44	14	72:
5	1	1	1	31	10	2606	868	49	22	29	TS
5	1	1	1	31	11	2732	880	41	17	37	ee
4	1	1	1	32	0	321	675	2477	259	-1	
5	1	1	1	32	1	321	675	71	41	43	Ae
5	1	1	1	32	2	507	708	62	25	60	3/3)
5	1	1	1	32	3	633	699	107	49	36	Pg
5	1	1	1	32	4	899	729	215	40	3	BESEES
5	1	1	1	32	5	1184	771	28	25	29	<
5	1	1	1	32	6	1918	846	11	11	6	aE
5	1	1	1	32	7	2116	841	75	57	50	eee
5	1	1	1	32	8	2320	874	6	15	25	2
5	1	1	1	32	9	2375	874	289	42	21	ee
5	1	1	1	32	10	2702	904	96	30	33	eee
4	1	1	1	33	0	338	715	2454	244	-1	
5	1	1	1	33	1	338	715	55	32	32	:g
5	1	1	1	33	2	524	736	56	9	12	Me
5	1	1	1	33	3	716	749	24	16	64	8
5	1	1	1	33	4	899	760	215	47	18	BOSSSS|
5	1	1	1	33	5	1184	803	38	8	49	|e
5	1	1	1	33	6	1592	844	180	30	0	5
5	1	1	1	33	7	1909	856	29	13	49	eer
5	1	1	1	33	8	2438	903	193	31	26	gs
5	1	1	1	33	9	2697	929	95	30	39	eS
4	1	1	1	34	0	375	752	2373	208	-1	
5	1	1	1	34	1	337	734	10	17	41	3
5	1	1	1	34	2	375	752	14	3	41	5
5	1	1	1	34	3	899	791	19	16	42	©
5	1	1	1	34	4	938	791	19	16	29	@
5	1	1	1	34	5	975	791	18	16	32	oO
5	1	1	1	34	6	1437	844	142	19	13	2s
5	1	1	1	34	7	1661	854	24	15	21	=
5	1	1	1	34	8	1771	861	1	2	0	—
5	1	1	1	34	9	1977	889	3	4	4	/
5	1	1	1	34	10	2056	906	3	2	26	pre
5	1	1	1	34	11	2181	903	88	23	39	Sao
5	1	1	1	34	12	2290	918	177	22	19	Ser
5	1	1	1	34	13	2464	889	42	55	54	er
5	1	1	1	34	14	2542	932	42	22	32	es
5	1	1	1	34	15	2735	943	13	17	0	~
4	1	1	1	35	0	375	735	2718	290	-1	
5	1	1	1	35	1	375	735	81	74	37	are
5	1	1	1	35	2	697	764	48	64	92	3,
5	1	1	1	35	3	899	810	174	49	47	222222
5	1	1	1	35	4	1090	810	123	49	22	[0
5	1	1	1	35	5	1260	844	251	52	35	hee
5	1	1	1	35	6	1664	844	146	89	32	ae
5	1	1	1	35	7	1832	892	21	8	19	pet
5	1	1	1	35	8	2091	912	9	11	3	2
5	1	1	1	35	9	2140	922	144	27	11	SSS
5	1	1	1	35	10	2308	934	95	14	28	Se
5	1	1	1	35	11	2438	946	70	49	34	hae
   c                 3    ®                    Q|  2 =s+-o =                                                                                23      °  3 2333    =.
   4                           9999         —                a a      * ee     x   —)       -    4    :               —- 1/7): a        s  “4  = es
   APES                        $8 Sessz is         eae er   ated ek      ee          a            — NG                MIA ‘ID 7         ee           ey
   ‘                           SaSGGoac            *      ee a   Aa               Se       ee      SS          a    x       Ss    Op,            ie ad
                               SESE ss               ws ae ee                me        ee          :                    Boe!         Le           a.   =
   | 6                         eeecaa                              ae                                    -              E                        ~~
                               °          =                      o  o   “ha   2%      =     7, a    Mes                 = 3            .     a  ae
   3                           See Bs               FS     Ree                _          ;           |      >        ae          3           .     BR    ies
                                 2eee                              ee    eee =                 5                                          WN,     —
   g                                               Ee ig              F <7 #         :     P     eT San ae eg) a                  ed   r           =—
                                                                                                                                             are
   Elis                                                Yes ae         es vs           : ws :        =    f} ot OO. ee        wade ee 7            7
5 28                                 sa      _=  :   oy  eee    s 70 \X | wen *    ,  Ss = 1 ro oP ‘Ee een Pa) ibe 1) | P73         a ata               4
<=                    -      5    > i er           oa:           CN"  a       4   -, Va  ie ae <a fp ewhe     sel Fime f= 5a Pa   a      en          i
a8 x               i ee a         ae    re   > oe »>      : ee a              Voter ’ Ae we       23 pn     = en ae ¥,, Fe       F ae N eS   oe      |     ra |
Setl                           es Poe.     Sa te eee a      aa       ce:     ~ | syst!   a        eee   er    pang  Te Tee Pee    dete Nn   ae  oe el =~  hee
23 4\6           ie ee       ek            3 an                           im \      = amar         oe              ee Si Sel Per              a          eee
   =                  ,         mt      :     oe                  SS _en         é-eae a         p> SA    apei es   pr Emeg     Rp Ny       See       Tae
55        9       te        ee.             >    anc        Sey  2        eee bet Sf -          Se                   oe          DL ee           Reg: eee
= 3m      8       ne a:          ;           Ss   NNO        Qa          EO" 8      eed.        Saft ~— ee Ie       ig  a        Fe ee           ee       PS
o23ln   nes        ‘  a ”   = Se.            ——   re    at ad fk     Pah Nee pee        R       Sth       He 1,    fe.     ,   rt Pipe:   Se      %     rts:
Boa] S  es              i>         tS ete: a?              at       ~ ,v0) ¥  ee Seo               ae     Te Pf              RA Pee       \   ™   ss od     |
Si>     Bs             —————— ens          —       Seeet Petty sg OND   ae = . £fe- ™~    neo  By] fy) : 3   Se               fe RE        er ae ae SA eee
  =e.     5      |            J    ;      a       Lhe eee         ye      eA   Rem 5   pps    rate  © ee   peOe  bye         the Bed       AY   va   BEAT as]
3 3 e   o zs                       we              en 725 5   & ¢ or a   aN are 8     |    “%      f/f; a   sok  4       te Berd mA):     Noe       vps |
     w        _—————         ee      ea   ;        5069   -  Pe"     .    ae 1,      cH    rr  EW x, “oe wl I 1) Site  = A  LE ee ie) Pal es   a    oe Tage i Tk |
esglSrr 3 QO     = —_ ree              ore  a    ei    AA 4 6   EE        oS     € TE     OS™   ls S|   A ae         SB.        ag      ee    ra ba     ae FS
g Be    SF °            es         SS     EL GO. ae yned    ete age      oS    i  <    1g 2     [Xe       gS        o OG a >       .   ne?    ea     Pi. wa
oO: 3   op            » Sia     go!     ah               at ia Ee          oY   '     ah    S /    .   ‘    >   N/g           eh    Yak fe areas BONE e?" irae |
Het,
5	1	1	1	63	2	512	1399	17	23	42	3
5	1	1	1	63	3	560	1393	36	45	28	(3
5	1	1	1	63	4	628	1371	238	78	21	(eee,
5	1	1	1	63	5	866	1371	143	78	26	aoe
5	1	1	1	63	6	767	1403	417	98	19	ef
5	1	1	1	63	7	1211	1426	90	87	0	L
5	1	1	1	63	8	1361	1469	231	59	20	See
5	1	1	1	63	9	1658	1498	76	35	12	mail
5	1	1	1	63	10	1904	1514	114	45	0	Hie’
5	1	1	1	63	11	2034	1557	4	3	34	8
5	1	1	1	63	12	2072	1544	108	36	0	fas
5	1	1	1	63	13	2198	1549	21	43	5	Sp
5	1	1	1	63	14	2324	1559	171	43	5	sat
5	1	1	1	63	15	2622	1576	43	34	21	we
5	1	1	1	63	16	2752	1601	54	40	29	Se
5	1	1	1	63	17	2832	1575	59	64	29	a
5	1	1	1	63	18	3014	1610	100	48	0	Newli
4	1	1	1	64	0	738	1449	2381	226	-1	
5	1	1	1	64	1	738	1449	41	20	58	oe
5	1	1	1	64	2	853	1462	57	9	47	—
5	1	1	1	64	3	979	1474	21	7	11	a
5	1	1	1	64	4	1132	1485	13	10	0	i)
5	1	1	1	64	5	1206	1496	18	11	30	Go
5	1	1	1	64	6	1261	1500	63	18	35	ae
5	1	1	1	64	7	1498	1524	96	6	0	~~~.
5	1	1	1	64	8	1709	1535	8	5	25	5
5	1	1	1	64	9	1945	1562	20	5	0	hg
5	1	1	1	64	10	2013	1563	66	21	0	SOS:
5	1	1	1	64	11	2141	1571	34	20	0	»
5	1	1	1	64	12	2345	1592	4	5	0	y
5	1	1	1	64	13	2480	1604	4	3	49	my
5	1	1	1	64	14	2522	1596	48	35	20	figs
5	1	1	1	64	15	2714	1626	19	17	45	t>
5	1	1	1	64	16	2749	1636	22	12	58	©
5	1	1	1	64	17	2830	1633	58	22	22	ae
5	1	1	1	64	18	3029	1654	90	21	0	aes
4	1	1	1	65	0	378	1429	2814	269	-1	
5	1	1	1	65	1	378	1429	17	15	0	#
5	1	1	1	65	2	512	1431	77	35	42	cio
5	1	1	1	65	3	604	1437	103	58	27	‘ita
5	1	1	1	65	4	730	1475	1	4	35	6
5	1	1	1	65	5	764	1442	32	63	16	Be
5	1	1	1	65	6	882	1491	3	3	0	/
5	1	1	1	65	7	1095	1505	16	4	22	pee
5	1	1	1	65	8	1158	1501	120	27	15	eee
5	1	1	1	65	9	1312	1505	33	35	27	Pe
5	1	1	1	65	10	1502	1520	60	39	21	Me
5	1	1	1	65	11	1932	1573	46	26	17	BRE
5	1	1	1	65	12	2018	1558	47	47	24	oer
5	1	1	1	65	13	2202	1598	12	8	36	&
5	1	1	1	65	14	2340	1625	13	7	0	a
5	1	1	1	65	15	2442	1611	82	33	0	pt
5	1	1	1	65	16	2590	1631	9	11	35	aan,
5	1	1	1	65	17	2643	1638	5	19	0	.
5	1	1	1	65	18	2694	1628	105	45	14	sé:
5	1	1	1	65	19	2830	1655	54	8	24	7
5	1	1	1	65	20	3037	1661	10	9	27	ie
5	1	1	1	65	21	3070	1673	36	24	37	Np
4	1	1	1	66	0	378	1453	2820	279	-1	
5	1	1	1	66	1	378	1453	17	22	78	?
5	1	1	1	66	2	473	1453	22	31	39	5
5	1	1	1	66	3	513	1464	20	18	3	a
5	1	1	1	66	4	573	1466	9	34	45	Cc
5	1	1	1	66	5	628	1478	88	18	40	eae
5	1	1	1	66	6	745	1490	42	19	19	i
5	1	1	1	66	7	781	1485	25	35	26	fh,
5	1	1	1	66	8	812	1498	78	18	30	awa
5	1	1	1	66	9	903	1506	63	15	19	ee
5	1	1	1	66	10	1005	1510	10	15	39	Oo
5	1	1	1	66	11	1038	1517	53	13	28	ae
5	1	1	1	66	12	1111	1530	97	18	36	wee
5	1	1	1	66	13	1306	1537	51	26	27	aes
5	1	1	1	66	14	1416	1549	2	3	0	z
5	1	1	1	66	15	1523	1560	31	16	28	Sy
5	1	1	1	66	16	1722	1581	21	11	45	7]
5	1	1	1	66	17	1919	1587	7	31	0	Fg
5	1	1	1	66	18	2021	1609	13	4	25	eee
5	1	1	1	66	19	2047	1599	31	21	0	laah
5	1	1	1	66	20	2177	1622	7	5	30	0
5	1	1	1	66	21	2226	1620	8	30	65	|
5	1	1	1	66	22	2413	1637	44	12	23	eee
5	1	1	1	66	23	2496	1639	34	23	22	a
5	1	1	1	66	24	2571	1638	19	28	0	y
5	1	1	1	66	25	2671	1661	136	26	36	Pat,
5	1	1	1	66	26	2912	1684	9	6	0	v]
5	1	1	1	66	27	3003	1699	4	3	68	p
5	1	1	1	66	28	3050	1678	84	50	15	id
5	1	1	1	66	29	3165	1697	33	35	28	i
4	1	1	1	67	0	378	1474	2809	316	-1	
5	1	1	1	67	1	378	1474	17	15	65	2
5	1	1	1	67	2	418	1502	18	13	13	ol
5	1	1	1	67	3	467	1486	22	36	13	g@
5	1	1	1	67	4	512	1485	77	38	46	Sis
5	1	1	1	67	5	653	1480	33	60	27	aa
5	1	1	1	67	6	792	1495	11	37	0	s
5	1	1	1	67	7	920	1522	36	31	21	te
5	1	1	1	67	8	974	1524	51	50	29	St:
5	1	1	1	67	9	1025	1521	20	47	27	2,
5	1	1	1	67	10	1072	1542	17	25	41	4
5	1	1	1	67	11	1117	1537	54	59	45	Si,
5	1	1	1	67	12	1183	1558	7	3	3	5
5	1	1	1	67	13	1254	1556	43	22	32	ee
5	1	1	1	67	14	1336	1555	56	31	31	le
5	1	1	1	67	15	1414	1563	25	31	51	3
5	1	1	1	67	16	1590	1605	11	12	74	>
5	1	1	1	67	17	1700	1591	35	29	37	<9
5	1	1	1	67	18	1845	1596	95	59	11	Rif)
5	1	1	1	67	19	1954	1600	45	47	38	we
5	1	1	1	67	20	2031	1618	39	24	17	aut
5	1	1	1	67	21	2087	1633	52	37	58	Ig
5	1	1	1	67	22	2156	1629	22	14	0	ff
5	1	1	1	67	23	2287	1662	16	8	61	>
5	1	1	1	67	24	2340	1660	12	18	19	a
5	1	1	1	67	25	2377	1649	34	6	12	nee
5	1	1	1	67	26	2429	1654	55	35	0	3
5	1	1	1	67	27	2523	1658	28	56	35	—
5	1	1	1	67	28	2576	1674	31	28	37	ds
5	1	1	1	67	29	2744	1681	26	29	25	2
5	1	1	1	67	30	2783	1688	22	29	36	=
5	1	1	1	67	31	2963	1708	68	33	5	Se,
5	1	1	1	67	32	3043	1713	71	30	17	el
5	1	1	1	67	33	3124	1715	63	75	37	a
4	1	1	1	68	0	418	1511	2688	255	-1	
5	1	1	1	68	1	418	1511	15	28	25	°o
5	1	1	1	68	2	506	1531	28	8	95	=
5	1	1	1	68	3	628	1529	23	19	42	aoe
5	1	1	1	68	4	661	1530	45	23	55	aes
5	1	1	1	68	5	754	1540	25	23	56	—
5	1	1	1	68	6	826	1548	30	22	51	Ju
5	1	1	1	68	7	917	1570	4	4	0	S
5	1	1	1	68	8	961	1572	9	13	41	ae
5	1	1	1	68	9	1029	1560	12	26	16	¢
5	1	1	1	68	10	1059	1566	58	24	0	~R-
5	1	1	1	68	11	1195	1582	6	15	51	+
5	1	1	1	68	12	1264	1581	4	5	0	.
5	1	1	1	68	13	1399	1596	42	25	38	RO
5	1	1	1	68	14	1452	1613	21	14	1	RES
5	1	1	1	68	15	1539	1606	20	27	59	J
5	1	1	1	68	16	1581	1615	35	17	0	.:
5	1	1	1	68	17	1660	1628	63	21	76	NG
5	1	1	1	68	18	1817	1646	17	9	19	a
5	1	1	1	68	19	1868	1636	59	29	23	|p!
5	1	1	1	68	20	1949	1655	41	14	51	Opa
5	1	1	1	68	21	2050	1657	36	14	32	ees
5	1	1	1	68	22	2135	1684	4	4	10	A
5	1	1	1	68	23	2237	1670	60	22	2	EES
5	1	1	1	68	24	2313	1679	28	26	59	ay
5	1	1	1	68	25	2462	1691	2	2	46	i,
5	1	1	1	68	26	2485	1690	21	12	28	7
5	1	1	1	68	27	2553	1697	16	31	25	Sh
5	1	1	1	68	28	2637	1705	12	6	53	ay
5	1	1	1	68	29	2707	1713	53	15	10	Na
5	1	1	1	68	30	2797	1721	15	28	39	Pi
5	1	1	1	68	31	2925	1734	8	3	7	a
5	1	1	1	68	32	2983	1734	15	29	46	es
5	1	1	1	68	33	3009	1738	61	24	8	ao
5	1	1	1	68	34	3086	1748	20	18	0	/
4	1	1	1	69	0	473	1523	2725	286	-1	
5	1	1	1	69	1	473	1523	61	47	36	73
5	1	1	1	69	2	560	1533	38	62	48	S
5	1	1	1	69	3	628	1547	124	52	21	eae
5	1	1	1	69	4	789	1562	298	64	23	Fhe
5	1	1	1	69	5	1104	1588	130	44	26	ee
5	1	1	1	69	6	1259	1582	84	88	38	Baa
5	1	1	1	69	7	1401	1620	43	32	3	be
5	1	1	1	69	8	1602	1656	6	3	0	.
5	1	1	1	69	9	1702	1641	275	58	15	Sree
5	1	1	1	69	10	1949	1635	18	68	26	Ss
5	1	1	1	69	11	2029	1677	56	35	23	tt
5	1	1	1	69	12	2107	1663	118	78	40	Sees
5	1	1	1	69	13	2237	1671	101	65	14	tS
5	1	1	1	69	14	2349	1698	47	34	3	Seg
5	1	1	1	69	15	2502	1697	44	50	42	me
5	1	1	1	69	16	2580	1717	45	65	23	ag
5	1	1	1	69	17	2745	1711	115	77	19	es
5	1	1	1	69	18	2893	1752	88	42	32	aa
5	1	1	1	69	19	3064	1726	32	79	50	i
5	1	1	1	69	20	3155	1791	43	18	0	\
4	1	1	1	70	0	512	1570	2699	252	-1	
5	1	1	1	70	1	512	1570	17	13	85	5
5	1	1	1	70	2	645	1578	85	29	4	Pa
5	1	1	1	70	3	807	1602	2	3	28	Pe
5	1	1	1	70	4	854	1599	43	14	52	2
5	1	1	1	70	5	960	1611	164	27	16	eae
5	1	1	1	70	6	1234	1631	29	15	20	es
5	1	1	1	70	7	1504	1655	21	21	0	A
5	1	1	1	70	8	1735	1680	98	26	43	Ben
5	1	1	1	70	9	1856	1689	74	18	46	NY
5	1	1	1	70	10	1956	1698	57	21	48	28
5	1	1	1	70	11	2023	1707	62	29	12	fla
5	1	1	1	70	12	2116	1702	27	51	12	S
5	1	1	1	70	13	2145	1724	99	16	59	BLT
5	1	1	1	70	14	2291	1730	47	19	22	Say
5	1	1	1	70	15	2352	1732	46	16	51	as
5	1	1	1	70	16	2426	1742	40	17	0	-
5	1	1	1	70	17	2553	1752	16	4	13	x
5	1	1	1	70	18	2680	1759	96	26	4	eins
5	1	1	1	70	19	2805	1771	57	21	38	toed
5	1	1	1	70	20	2988	1787	24	19	16	Bs
5	1	1	1	70	21	3021	1772	57	45	14	Naa}
5	1	1	1	70	22	3077	1772	9	45	62	/
5	1	1	1	70	23	3198	1809	13	13	0	.
4	1	1	1	71	0	375	1575	2701	253	-1	
5	1	1	1	71	1	375	1575	18	14	0	o
5	1	1	1	71	2	513	1585	16	14	92	3
5	1	1	1	71	3	630	1602	51	16	33	5
5	1	1	1	71	4	810	1620	2	3	13	+
5	1	1	1	71	5	1021	1632	4	6	0	:
5	1	1	1	71	6	1044	1605	81	57	20	i
5	1	1	1	71	7	1159	1644	52	21	37	eR
5	1	1	1	71	8	1412	1646	100	69	40	Bg
5	1	1	1	71	9	1519	1679	19	16	50	>
5	1	1	1	71	10	1741	1695	151	34	42	OSS,
5	1	1	1	71	11	1899	1693	95	39	45	KOS
5	1	1	1	71	12	2021	1689	52	56	15	Hf
5	1	1	1	71	13	2085	1729	65	12	10	le
5	1	1	1	71	14	2215	1742	12	7	38	EL
5	1	1	1	71	15	2263	1747	68	14	15	pts
5	1	1	1	71	16	2351	1757	78	16	26	hE
5	1	1	1	71	17	2592	1782	4	3	13	Tae
5	1	1	1	71	18	2661	1770	20	22	26	tn
5	1	1	1	71	19	2673	1765	34	51	15	a
5	1	1	1	71	20	2715	1769	121	41	22	i
5	1	1	1	71	21	2804	1765	56	51	21	ale
5	1	1	1	71	22	3049	1823	27	5	56	/
4	1	1	1	72	0	375	1590	2690	265	-1	
5	1	1	1	72	1	375	1590	159	51	0	5/835
5	1	1	1	72	2	560	1597	36	42	0	|6
5	1	1	1	72	3	643	1617	26	16	12	fae
5	1	1	1	72	4	780	1593	62	90	31	fs
5	1	1	1	72	5	862	1623	70	44	32	FP
5	1	1	1	72	6	989	1642	197	50	19	a
5	1	1	1	72	7	1203	1655	205	54	24	ee
5	1	1	1	72	8	1423	1695	154	21	0	Gago®
5	1	1	1	72	9	1587	1709	92	26	31	Ss
5	1	1	1	72	10	1777	1714	192	46	0	SEP
5	1	1	1	72	11	1993	1752	16	14	32	eee
5	1	1	1	72	12	2074	1734	111	63	14	eS
5	1	1	1	72	13	2184	1763	79	23	0	As
5	1	1	1	72	14	2280	1766	4	2	32	ea
5	1	1	1	72	15	2556	1791	97	40	10	Se
5	1	1	1	72	16	2675	1794	4	6	31	ge
5	1	1	1	72	17	2835	1799	221	55	30	Bre
5	1	1	1	72	18	3055	1808	10	47	0	f
4	1	1	1	73	0	335	1629	2782	268	-1	
5	1	1	1	73	1	335	1629	58	29	54	Kz
5	1	1	1	73	2	473	1644	61	28	29	pa
5	1	1	1	73	3	561	1645	27	8	29	°°
5	1	1	1	73	4	628	1645	74	34	14	Tee
5	1	1	1	73	5	835	1667	88	28	0	pee
5	1	1	1	73	6	997	1674	75	24	22	maid
5	1	1	1	73	7	1099	1708	5	4	50	|
5	1	1	1	73	8	1161	1672	45	59	25	4
5	1	1	1	73	9	1223	1704	137	32	0	See
5	1	1	1	73	10	1444	1725	9	12	7	ad
5	1	1	1	73	11	1510	1724	117	49	25	YD
5	1	1	1	73	12	1741	1749	10	21	37	rs
5	1	1	1	73	13	1832	1745	127	46	41	Neg
5	1	1	1	73	14	1973	1768	53	37	6	eae
5	1	1	1	73	15	2027	1765	78	50	39	Ff
5	1	1	1	73	16	2197	1787	143	38	52	i.
5	1	1	1	73	17	2541	1815	47	18	40	‘ac
5	1	1	1	73	18	2606	1813	270	84	34	gE
5	1	1	1	73	19	2912	1847	53	44	28	a
5	1	1	1	73	20	3085	1880	32	14	48	eee
4	1	1	1	74	0	375	1642	2838	266	-1	
5	1	1	1	74	1	375	1660	14	4	79	=
5	1	1	1	74	2	483	1642	9	32	0	\.
5	1	1	1	74	3	658	1688	27	5	45	hen
5	1	1	1	74	4	744	1666	18	35	0	ss
5	1	1	1	74	5	820	1694	24	11	42	Pi
5	1	1	1	74	6	860	1702	4	4	26	ak
5	1	1	1	74	7	933	1711	3	3	17	5,
5	1	1	1	74	8	1009	1716	5	4	0	;
5	1	1	1	74	9	1203	1724	13	15	0	oF
5	1	1	1	74	10	1300	1733	38	16	9	meee
5	1	1	1	74	11	1384	1738	21	10	30	Ah
5	1	1	1	74	12	1474	1754	49	10	20	i
5	1	1	1	74	13	1627	1766	11	7	19	«
5	1	1	1	74	14	1654	1768	147	20	33	Ga
5	1	1	1	74	15	1812	1779	89	18	43	EDO
5	1	1	1	74	16	1912	1790	37	15	49	INS
5	1	1	1	74	17	1986	1799	11	5	39	Rig
5	1	1	1	74	18	2037	1799	10	7	47	A
5	1	1	1	74	19	2063	1802	93	22	33	A
5	1	1	1	74	20	2332	1831	4	3	24	een
5	1	1	1	74	21	2387	1829	5	5	0	r
5	1	1	1	74	22	2455	1841	11	16	56	~
5	1	1	1	74	23	2636	1850	34	22	22	WH
5	1	1	1	74	24	2787	1872	9	5	39	a
5	1	1	1	74	25	2882	1888	3	5	24	ge
5	1	1	1	74	26	3209	1902	4	3	66	|
4	1	1	1	75	0	334	1653	2780	263	-1	
5	1	1	1	75	1	334	1653	22	19	60	®
5	1	1	1	75	2	473	1668	16	19	42	BF
5	1	1	1	75	3	512	1682	22	20	37	tn
5	1	1	1	75	4	628	1688	53	29	35	pee
5	1	1	1	75	5	739	1699	104	28	33	eo
5	1	1	1	75	6	912	1716	62	27	22	Prk
5	1	1	1	75	7	1165	1737	9	7	0	eae
5	1	1	1	75	8	1356	1745	33	34	19	24
5	1	1	1	75	9	1472	1758	22	28	51	=
5	1	1	1	75	10	1600	1776	48	24	36	4
5	1	1	1	75	11	1686	1776	153	42	30	jee
5	1	1	1	75	12	1859	1781	164	49	29	ee
5	1	1	1	75	13	2026	1781	21	49	13	Fl
5	1	1	1	75	14	1978	1821	43	13	49	—
5	1	1	1	75	15	2125	1815	36	28	23	ee
5	1	1	1	75	16	2202	1799	45	66	43	fal
5	1	1	1	75	17	2252	1799	22	66	37	3
5	1	1	1	75	18	2297	1816	36	52	34	53
5	1	1	1	75	19	2384	1831	88	41	17	33
5	1	1	1	75	20	2556	1851	109	46	0	Pee
5	1	1	1	75	21	2695	1884	176	24	14	Dee
5	1	1	1	75	22	2892	1876	222	40	28	ee
4	1	1	1	76	0	327	1675	2886	294	-1	
5	1	1	1	76	1	327	1675	206	67	0	Zistes
5	1	1	1	76	2	733	1722	55	37	30	er
5	1	1	1	76	3	816	1736	130	27	21	oe
5	1	1	1	76	4	1156	1744	54	71	29	ne
5	1	1	1	76	5	1221	1763	76	22	4	3h
5	1	1	1	76	6	1309	1768	71	36	0	t-
5	1	1	1	76	7	1486	1797	8	7	37	MES
5	1	1	1	76	8	1517	1782	52	50	45	we
5	1	1	1	76	9	1613	1798	11	16	20	3
5	1	1	1	76	10	1820	1820	88	38	45	te
5	1	1	1	76	11	1912	1814	86	85	45	RE
5	1	1	1	76	12	2275	1862	185	33	48	el
5	1	1	1	76	13	2490	1869	52	34	8	es
5	1	1	1	76	14	2575	1906	118	6	27	gee)
5	1	1	1	76	15	2744	1898	13	30	12	ae
5	1	1	1	76	16	2845	1898	59	37	32	ae
5	1	1	1	76	17	2999	1910	82	38	22	i
4	1	1	1	77	0	335	1726	2874	296	-1	
5	1	1	1	77	1	335	1726	21	40	86	5
5	1	1	1	77	2	473	1730	22	44	0	f
5	1	1	1	77	3	506	1752	28	45	89	a
5	1	1	1	77	4	628	1766	12	10	33	Pe
5	1	1	1	77	5	715	1762	86	42	36	eas
5	1	1	1	77	6	851	1772	55	27	35	eee:
5	1	1	1	77	7	969	1791	33	24	17	ra
5	1	1	1	77	8	1120	1775	186	91	14	ee
5	1	1	1	77	9	1252	1812	44	63	36	a
5	1	1	1	77	10	1301	1808	34	71	32	Ze
5	1	1	1	77	11	1352	1828	9	4	15	i
5	1	1	1	77	12	1416	1834	139	36	6	Rey
5	1	1	1	77	13	1618	1842	29	43	37	al
5	1	1	1	77	14	1786	1863	62	25	44	eat
5	1	1	1	77	15	1869	1870	53	29	0	S
5	1	1	1	77	16	1940	1874	75	38	34	oes
5	1	1	1	77	17	2040	1854	25	40	18	a
5	1	1	1	77	18	2096	1889	11	16	30	ne
5	1	1	1	77	19	2153	1895	77	37	25	a
5	1	1	1	77	20	2246	1905	42	18	42	BS
5	1	1	1	77	21	2366	1886	53	56	26	ce
5	1	1	1	77	22	2437	1926	76	23	30	Spek
5	1	1	1	77	23	2542	1928	87	49	40	Pd
5	1	1	1	77	24	2653	1920	73	47	1	Ch
5	1	1	1	77	25	2818	1936	34	35	18	a
5	1	1	1	77	26	2872	1947	68	51	63	pe
5	1	1	1	77	27	2957	1981	3	4	0	:
5	1	1	1	77	28	2974	1943	116	79	15	wage
5	1	1	1	77	29	3150	1982	23	19	4	Nat
4	1	1	1	78	0	473	1774	2507	233	-1	
5	1	1	1	78	1	473	1774	16	15	55	o
5	1	1	1	78	2	724	1792	43	26	23	ot
5	1	1	1	78	3	937	1813	60	11	14	We
5	1	1	1	78	4	1039	1827	89	14	36	ee
5	1	1	1	78	5	1156	1844	47	3	17	males
5	1	1	1	78	6	1272	1844	73	16	26	BF:
5	1	1	1	78	7	1433	1861	5	2	0	.
5	1	1	1	78	8	1512	1872	3	2	27	;
5	1	1	1	78	9	1698	1882	143	28	19	Biers:
5	1	1	1	78	10	1962	1916	14	5	10	©
5	1	1	1	78	11	2005	1914	111	17	32	ae
5	1	1	1	78	12	2168	1929	2	4	17	we
5	1	1	1	78	13	2248	1925	4	5	30	eS
5	1	1	1	78	14	2369	1944	126	27	38	ae,
5	1	1	1	78	15	2526	1950	42	26	20	ee
5	1	1	1	78	16	2645	1966	24	14	29	an
5	1	1	1	78	17	2767	1978	7	2	16	E
5	1	1	1	78	18	2897	1991	83	16	15	Sead
4	1	1	1	79	0	327	1769	2722	276	-1	
5	1	1	1	79	1	327	1780	35	54	63	2
5	1	1	1	79	2	418	1797	18	27	0	e
5	1	1	1	79	3	473	1791	16	22	83	a
5	1	1	1	79	4	506	1796	27	23	20	2
5	1	1	1	79	5	604	1769	46	78	8	IS
5	1	1	1	79	6	676	1769	39	78	25	aie
5	1	1	1	79	7	747	1796	21	42	33	an
5	1	1	1	79	8	792	1820	21	30	55	4
5	1	1	1	79	9	827	1826	108	31	16	aS
5	1	1	1	79	10	1030	1861	11	7	14	age
5	1	1	1	79	11	1097	1856	82	24	44	pt
5	1	1	1	79	12	1313	1865	31	15	41	$3
5	1	1	1	79	13	1678	1914	5	4	0	é
5	1	1	1	79	14	1696	1883	13	50	1	co
5	1	1	1	79	15	1709	1887	49	42	9	AN
5	1	1	1	79	16	1772	1907	38	30	17	Sa
5	1	1	1	79	17	1845	1931	11	13	31	5
5	1	1	1	79	18	1868	1916	47	29	39	ee
5	1	1	1	79	19	1999	1927	48	28	19	Baia
5	1	1	1	79	20	2064	1937	98	29	29	Se
5	1	1	1	79	21	2179	1942	86	34	11	Sees
5	1	1	1	79	22	2321	1961	23	23	25	Be.
5	1	1	1	79	23	2466	1971	67	29	9	eA
5	1	1	1	79	24	2611	2000	19	20	0	F
5	1	1	1	79	25	2681	1988	51	49	1	3
5	1	1	1	79	26	2782	2017	3	2	30	;
5	1	1	1	79	27	2871	2002	20	32	0	=
5	1	1	1	79	28	2912	2002	24	33	1	53
5	1	1	1	79	29	2962	1991	44	54	0	ei
5	1	1	1	79	30	3033	2009	16	36	7	2
4	1	1	1	80	0	506	1818	2707	276	-1	
5	1	1	1	80	1	506	1821	28	16	82	=
5	1	1	1	80	2	652	1818	117	61	29	eo
5	1	1	1	80	3	779	1845	79	47	17	eae
5	1	1	1	80	4	1069	1877	3	1	21	a
5	1	1	1	80	5	1639	1923	28	13	0	r,
5	1	1	1	80	6	1688	1934	117	35	0	Me
5	1	1	1	80	7	1818	1949	96	22	7	sre,
5	1	1	1	80	8	1975	1964	10	15	0	e
5	1	1	1	80	9	2059	1967	56	26	26	ae
5	1	1	1	80	10	2180	1979	104	38	5	SO
5	1	1	1	80	11	2339	1988	74	33	16	ees
5	1	1	1	80	12	2464	2021	3	3	24	eer
5	1	1	1	80	13	2607	2014	70	31	26	Soest
5	1	1	1	80	14	2705	2025	55	25	8	#4
5	1	1	1	80	15	2871	2014	88	58	18	eT
5	1	1	1	80	16	2981	2047	64	29	0	Od
5	1	1	1	80	17	3199	2065	14	29	10	4
4	1	1	1	81	0	335	1847	2878	263	-1	
5	1	1	1	81	1	335	1847	27	20	79	r
5	1	1	1	81	2	628	1867	50	12	0	Eee
5	1	1	1	81	3	1696	1972	5	5	22	or
5	1	1	1	81	4	1757	1966	56	27	32	ae
5	1	1	1	81	5	1844	1973	66	22	0	t-:
5	1	1	1	81	6	2013	2011	7	5	0	*
5	1	1	1	81	7	2128	2016	3	4	22	ek
5	1	1	1	81	8	2160	2009	65	23	11	SG
5	1	1	1	81	9	2240	2013	60	24	0	hans
5	1	1	1	81	10	2340	2014	24	31	53	Re
5	1	1	1	81	11	2428	2028	36	25	48	xt
5	1	1	1	81	12	2486	2055	4	2	41	ge
5	1	1	1	81	13	2575	2048	18	18	26	a
5	1	1	1	81	14	2641	2057	16	11	21	ghey
5	1	1	1	81	15	2719	2063	3	3	46	5
5	1	1	1	81	16	2900	2068	47	23	29	=.
5	1	1	1	81	17	2965	2081	61	24	0	Poe
5	1	1	1	81	18	3182	2102	4	2	0	_
4	1	1	1	82	0	333	1848	2680	262	-1	
5	1	1	1	82	1	333	1848	23	44	2	os
5	1	1	1	82	2	1690	1966	50	49	17	ee
5	1	1	1	82	3	1820	1998	4	7	3	~
5	1	1	1	82	4	2099	2021	83	23	38	AS
5	1	1	1	82	5	2198	2050	209	3	16	See
5	1	1	1	82	6	2467	2066	2	2	33	;
5	1	1	1	82	7	2559	2067	85	14	34	tT
5	1	1	1	82	8	2956	2102	5	4	30	per
5	1	1	1	82	9	2989	2080	15	44	0	+
4	1	1	1	83	0	341	1876	2473	235	-1	
5	1	1	1	83	1	341	1876	9	34	47	Qa
5	1	1	1	83	2	418	1895	18	28	77	2
5	1	1	1	83	3	1638	1993	82	41	42	ree
5	1	1	1	83	4	1742	2010	100	28	13	i,
5	1	1	1	83	5	1851	2011	53	29	31	Ax
5	1	1	1	83	6	1918	2022	21	27	0	—
5	1	1	1	83	7	1959	2017	27	36	0	——
5	1	1	1	83	8	2075	2037	37	26	0	Pee
5	1	1	1	83	9	2171	2051	105	22	35	oe
5	1	1	1	83	10	2388	2060	44	34	53	ee
5	1	1	1	83	11	2477	2080	7	19	0	‘
5	1	1	1	83	12	2553	2075	17	9	12	ba
5	1	1	1	83	13	2582	2084	58	26	18	a
5	1	1	1	83	14	2704	2086	17	25	0	t¥s
5	1	1	1	83	15	2812	2099	2	2	56	‘
4	1	1	1	84	0	1638	2030	924	81	-1	
5	1	1	1	84	1	1638	2030	41	38	29	Ra
5	1	1	1	84	2	1990	2056	63	41	29	ee
5	1	1	1	84	3	2139	2092	13	10	30	er
5	1	1	1	84	4	2211	2081	42	28	1	a
5	1	1	1	84	5	2348	2087	72	23	32	el
4	1	1	1	85	0	159	1928	3046	289	-1	
5	1	1	1	85	1	159	1928	34	26	63	U
5	1	1	1	85	2	1754	2075	47	19	35	eu,
5	1	1	1	85	3	1848	2075	5	4	14	2
5	1	1	1	85	4	1993	2090	36	22	0	=
5	1	1	1	85	5	2132	2102	17	8	57	=
5	1	1	1	85	6	2961	2173	37	44	0	ASO
5	1	1	1	85	7	3016	2173	34	44	18	ONIN
5	1	1	1	85	8	3097	2189	12	14	23	»
5	1	1	1	85	9	3115	2173	90	44	0	ONTASABNS
4	1	1	1	86	0	1644	2079	1326	135	-1	
5	1	1	1	86	1	1644	2079	84	23	49	PF
5	1	1	1	86	2	1713	2074	18	34	41	a
5	1	1	1	86	3	1858	2101	3	2	78	:
5	1	1	1	86	4	2752	2191	4	3	84	-
5	1	1	1	86	5	2879	2180	91	34	14	AN3WdO7S
4	1	1	1	87	0	158	1957	2657	259	-1	
5	1	1	1	87	1	158	1957	27	23	71	»
5	1	1	1	87	2	331	1974	17	13	11	oo
5	1	1	1	87	3	368	1972	17	30	0	oe
5	1	1	1	87	4	419	1991	16	3	0	llc
5	1	1	1	87	5	1641	2091	45	18	28	es
5	1	1	1	87	6	2647	2183	59	37	0	AISSIE
5	1	1	1	87	7	2711	2183	63	37	0	ANNA
4	1	1	1	88	0	149	1983	3104	273	-1	
5	1	1	1	88	1	149	1983	35	23	69	@
5	1	1	1	88	2	331	1991	105	44	9	([féls
5	1	1	1	88	3	2513	2187	314	66	0	“qiwiatces’t
5	1	1	1	88	4	2847	2211	289	45	0	SABAMNS
5	1	1	1	88	5	3149	2211	104	45	56	STV
4	1	1	1	89	0	158	2010	2634	243	-1	
5	1	1	1	89	1	158	2010	27	23	86	°
5	1	1	1	89	2	331	2036	54	38	10	a”
5	1	1	1	89	3	2534	2232	48	42	36	PALE
5	1	1	1	89	4	2622	2232	77	42	13	Sere
5	1	1	1	89	5	2761	2237	31	16	22	Menino
4	1	1	1	90	0	158	2049	1847	202	-1	
5	1	1	1	90	1	158	2049	277	46	21	Bf
5	1	1	1	90	2	1867	2198	138	53	95	ans
4	1	1	1	91	0	158	2074	1704	177	-1	
5	1	1	1	91	1	158	2074	35	23	32	ol
5	1	1	1	91	2	331	2091	54	42	47	esl
5	1	1	1	91	3	1410	2199	140	52	7	O¥d
5	1	1	1	91	4	1574	2199	288	52	88	NOISIAIG
4	1	1	1	92	0	368	2126	17	11	-1	
5	1	1	1	92	1	368	2126	17	11	1	a
4	1	1	1	93	0	147	2109	1257	142	-1	
5	1	1	1	93	1	147	2109	42	82	0	S.
5	1	1	1	93	2	323	2134	36	42	4	iB
5	1	1	1	93	3	980	2199	92	51	0	NV
5	1	1	1	93	4	1072	2195	83	72	0	1d
5	1	1	1	93	5	1178	2199	226	52	88	1VSOd
4	1	1	1	94	0	159	2165	226	35	-1	
5	1	1	1	94	1	159	2171	33	15	57	_
5	1	1	1	94	2	323	2165	62	35	0	Ef5
4	1	1	1	95	0	158	2184	3177	80	-1	
5	1	1	1	95	1	158	2194	35	23	48	@
5	1	1	1	95	2	339	2195	46	35	8	[|
5	1	1	1	95	3	403	2184	2932	80	4	NWidIwsodOwadNOISIAIGaNS
5	1	1	1	95	4	2829	2155	391	130	4	ASST
4	1	1	1	96	0	158	2220	34	23	-1	
5	1	1	1	96	1	158	2220	34	23	54	ol

Section 70

GENERAL COMMITTEE MEETING AGENDA                                                                   15 JANUARY 2018


4                        REC16/0014 DEVELOPMENT PERMIT FOR RECONFIGURING A LOT, 1 LOT INTO 11
                         RESIDENTIAL LOTS, LOCATED AT 28 ELKHORN DRIVE, TEWANTIN
DOCUMENT INFORM AT ION




Author                             Development Planner, Lisa Pienaar
                                   Environment and Sustainable Development

Index                              ECM/ Application/ REC16/0014

Attachments                        1.   Proposal Plan

         APPLICATION DETAILS
         Applicant                             Elkhorn Investments (QLD) P/L TTE
         Proposal                              Development Permit to Reconfigure a Lot - 1 lot into 11 residential
                                               lots
         Properly Made Date                    17 June 2016
         Information Request Date              14 July 2016
         Information Response Date             2 November 2016
         Decision Due Date                     19 January 2018 (numerous extensions have occurred)


         PROPERTY DETAILS
         Property Address                      28 Elkhorn Drive, Tewantin
         RP Description                        Lot 70 M 37807
         Land Area                             12,920m²
         Existing Use of Land                  Dwelling and shed


         STATUTORY DETAILS
         SEQRP Designation                     Urban Footprint
         Locality                              Tewantin and Doonan
         Zone                                  Detached Housing
         Overlays                              Biodiversity
                                               Natural Hazards – Flood, Bushfire, Acid Sulphate
         Assessment Type                       Code


RECOMMENDATION
That Council note the report by the Development Planner to the General Committee Meeting
dated 15 January 2018 regarding Application REC16/0014 for a Preliminary Approval for
Reconfiguration of a Lot (1 into 11 residential lots) situated at 28 Elkhorn Drive, Tewantin and
approve the proposed, granting a Preliminary Approval for Reconfiguring a Lot (1 into 10
residential lots and drainage reserve), subject to the following conditions:
1.                       The applicant is required to submit a further code assessable application for a
                         Development Permit for Reconfiguring a Lot complying with the conditions of this
                         Preliminary Approval.




                                                                                                       Page 70 of 135

Section 71

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018


Approved Plans
2.   Development undertaken in accordance with this approval must generally comply with the
     approved plan no. 15228.1 (Rev. C), prepared by Project Urban dated 31/10/16. The
     approved plan must be amended to:
     a.    Include the area of proposed Lot 11 as “Drainage Reserve” generally in accordance
           with the submitted “Proposed Stormwater Layout V2”,
     b.    Incorporate the indented area in the front of Lots 1 & 2 within these lots;
     c.    Include dedication of Covenant areas A & B and land behind the existing dwelling
           (from the fence line) to the eastern boundary on proposed Lot 9 as conservation park;
     d.    Include a road reserve width to provide for a cul-de-sac with a circular turning area of
           sufficient size (9m minimum radius) to accommodate the single forward motion turn
           of a Waste Collection Vehicle (WCV) together with minimum 3.5m wide verge from
           the new kerb line to the property boundary adjacent to the cul-de-sac;
     e.    Where the development is to be staged, a cul-de-sac must be included at the relevant
           stage;
     f.    Maintain the road reserve width of 15m minimum to the common boundary with Lot 6
           on RP149498;
     g.    Include a footpath in the road reserve on the western side of the new road.
New Road
3.   The new road (extension of Elkhorn Drive to the adjoining property to the west (No 20
     Eagle Drive – Lot 6 RP149498) shown on the Approved Plans must be constructed in
     accordance with the conditions of this Decision Notice and dedicated as road reserve at no
     cost to Council.
4.   The road reserve for the new road through to the adjoining property to the west must be
     dedicated with the first stage of the development.
5.   The works must be undertaken in accordance with an Operational Works approval and
     must include in particular:
     a.    an “access” road in accordance with Council’s Planning Scheme Policy 5 – Engineer
           Design Standards – Roads, Drainage and Earthworks (reserve width of 15 metres
           minimum and a carriageway width of 6 metres kerb to kerb)
     b.    sealing, drainage, kerbing and channelling
     c.    construction of pedestrian footpaths as shown on the approved plans
     d.    installation of street lighting
6.   The new road must terminate in a cul-de-sac with a circular turning area of sufficient size to
     accommodate the single forward motion turn of a Waste Collection Vehicle (WCV) clear of
     private driveways on-street parking and speed control devices or if the adjoining property to
     the west (No 20 Eagle Drive - Lot 6 RP149498) has been developed or the connecting road
     dedicated. The “access” road formation must extend to and match smoothly with the
     existing formation within Lot 6 RP149498, whichever is applicable at the time of
     construction.
Stormwater Quality
7.   Prior to Council accepting water quality treatment device assets “Off Maintenance”, the
     applicant must provide Council with a Schedule of Maintenance Costs for all activities
     undertaken to maintain the bio retention basins in accordance with the most current version
     of Healthy Waterways Bio-retention Basin Maintaining Vegetated Stormwater Assets
     Guidelines. The schedule shall include records of actual costs of maintenance work
     undertaken.

                                                                                    Page 71 of 135

Section 72

GENERAL COMMITTEE MEETING AGENDA                                                  15 JANUARY 2018


Stormwater Drainage
8.    The site must be provided with a stormwater drainage system connecting to a lawful point
      of discharge. The works must be undertaken in accordance with an Operational Works
      approval.
9.    The development must be designed such that space is allocated for dedicated whole-of-
      development stormwater quality/quantity treatment infrastructure and that major and minor
      flows from the development are drained to and treated by this infrastructure. The design of
      such infrastructure should be in accordance with current best practices, guidelines and the
      Noosa Plan, including:
      a.     State Planning Policy Part E State interest policies and assessment benchmarks
             (Water Quality) and Appendix 2 – Stormwater Management Design Objectives;
      b.     Noosa Plan Planning Scheme Policy 5— Engineering Design Standards – Roads,
             Drainage and Earthworks);
      c.     Australian Rainfall and Runoff Guidelines;
      d.     Queensland Urban Drainage Manual (including Ch 4 Catchment hydrology, Ch 5
             Detention/retention systems and Ch 13 Safety aspects);
      e.     MUSIC Modelling Guidelines; and
      f.     Water Sensitive Urban Design Technical Design Guidelines for South East
             Queensland, including current versions of updated guidelines such as Bioretention
             Technical Design Guidelines
10.   If stormwater is to be discharged through an adjacent property, written consent must be
      gained from the relevant property owners prior to lodgement of an application for
      Operational Works.
Vegetation
11.   Existing native trees on the site and in the road verge must be retained in accordance with
      an Arborist Report for the development and referenced in a Development Permit for
      Operational Works. The existing native trees to be retained must be located clear of
      proposed services and generally suitable for the proposed location.
12.   Vegetation must only be removed or disturbed in accordance with a Fauna Management
      Plan (or part thereof) and endorsed through an Operational Works approval.
Dedication of Land as Reserve
13.   The land area described as Covenant A and Covenant B, including the area beyond the
      existing fence line to the eastern boundary in Lot 9 must be dedicated to Council as
      freehold land as park with the first stage of the development. The land to be dedicated is
      “non-trunk infrastructure” for the purposes of the Sustainable Planning Act 2009.
14.   A 4.5 metre wide easement for access purposes must be registered against the title of the
      property in favour of Council over the land area identified as Lot 9 on the subject site to
      provide access to the dedicated park areas.
15.   The land area to be dedicated must by unencumbered by services such as pump stations,
      services easements or similar operational uses.
Works within Protected Land
16.   The following works must be undertaken in the land required to be transferred to Council:
      a.     Timber Post and rail fencing to any newly created residential lots
      b.     Removal of any fencing between the park areas required to be dedicated and the
             esplanade


                                                                                    Page 72 of 135

Section 73

GENERAL COMMITTEE MEETING AGENDA                                               15 JANUARY 2018


      c.   Ecological restoration of the park areas required to be dedicated
      d.   Removal of any structures or foreign debris within the park areas required to be
           dedicated
      e.   Arborist assessment of the trees contained within the park areas required to be
           dedicated
      The works must be undertaken in accordance with an Operational Works approval.
Landscaping Works
17.   The development site must be landscaped. The works must be undertaken in accordance
      with an Operational Works approval and the Noosa Plan for that specific area and must
      include in particular:
      a.   Provision of 1 native street tree within the road reserve for every 8 metres of new
           road.
      b.   100mm deep mulching and landscaping to any batter within road reserves that
           exceed 1 in 4 slope (25%).
      c.   Turf and garden beds to road reserve, including retained trees.
      d.   Retaining walls within the bio-basin must be constructed or permanently faced with
           materials which provide for a natural appearance such as sandstone, bluestone,
           granite or the like.
      e.   Removal of all weeds species listed in the following standards and legislation.
           i.    declared plants under the Land Protection (Pest and Stock Route Management)
                 Act 2002 and sub-ordinate Regulation 2003.
           ii.   The Noosa Local Government Area Pest Management Plan 2015-2019
18.   All landscape works must be established and maintained in accordance with horticultural
      best practice with construction techniques that allow for healthy, sustained and vigorous
      plant growth. All plant material must be allowed to grow to full form.
19.   All entry statements, fences, batters, retaining walls and buffer/screen plantings must be
      located entirely within private land and not within the public road reserve.
20.   All landscape works must be maintained generally in accordance with the approved design
      for the life of the development.
Estate Entrance Feature
21.   Any proposed estate entrance feature must:
      a.   reflect a subdued local character, rather than an overbearing or contrived statement
      b.   comprise feature vegetation (either existing or planted) in preference to built forms
      c.   integrate with the landscape design of the balance of the estate
      d.   be constructed of durable and low maintenance materials
      e.   be treated with a graffiti resistant coating
      f.   not restrict pedestrian access
      Any estate entrance works must be undertaken in accordance with an Operational Works
      approval.
Property Access and Driveways
22.   A residential driveway must be constructed to each lot. The works must be undertaken in
      accordance with an Operational Works approval.



                                                                                   Page 73 of 135

Section 74

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018


Pedestrian and Bicycle Facilities
23.   Pedestrian and bicycle facilities must be provided for the development. The works must be
      undertaken in accordance with an Operational Works approval and must include a 2 metre
      wide footpath within the road verge for the entire length of the new extended Elkhorn Drive.
Electricity and Telecommunication Services
24.   Underground reticulated electricity and telecommunication services must be provided to
      each lot in accordance with an approval for Operational Works and the standards and
      requirements of the relevant service provider.
25.   Unless otherwise stipulated by telecommunications legislation at the time of construction,
      the development must be provided with all necessary conduits, pits and pipes to
      accommodate the future connection of optic fibre technology telecommunications.
26.   Certification must be submitted to Council from all relevant service providers which certifies
      that the development has met the requirements of this Decision Notice and all applicable
      legislation at the time of construction.
Easements
27.   A private easement for inter-lot drainage purposes must be registered over the stormwater
      drainage system (both below ground and overland flows) that conveys stormwater from an
      upstream property. The easement must benefit all upstream properties and place the
      maintenance responsibilities on the burdened lot. The easements must be a minimum 1.5
      metre wide or of sufficient width to wholly encompass the drainage structures and the
      associated overland flowpaths.
28.   Unless otherwise agreed in writing by the relevant service provider, any public or third party
      infrastructure located on the subject site must be placed within an easement registered
      against the title of the property.
29.   All easements must be designed in accordance with the planning scheme and granted at
      no cost to the Grantee. Where the Grantee is Council or a service authority, the easement
      documentation must be in accordance with the Grantee’s standard easement terms. Draft
      easement documentation must be submitted to Council for endorsement.
30.   All works must be kept clear of any existing or proposed easements on the subject land,
      unless agreed otherwise in writing by the Grantee.
Earthworks
31.   All fill and associated batters must be undertaken in accordance with an Operational Works
      approval, and contained entirely within the subject site unless written permission from the
      respective landowner(s) is provided to Council.
32.   Where the development involves excavation or filling over, or adjacent to, drainage, water
      supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
      provide a freeboard of 100mm above the finished ground surface level.
Damage to Services and Assets
33.   Any damage caused to existing services and assets as a result of the development works
      must be repaired at no cost to the asset owner at the following times:
      a.   where the damage would cause a hazard to pedestrian or vehicle safety,
           immediately; or
      b.   where otherwise, upon completion of the works associated with the development.
      Any repair work which proposes to alter the alignment or level of existing services and
      assets must first be referred to the relevant service authority for approval.



                                                                                   Page 74 of 135

Section 75

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018


REPORT
1.    PROPOSAL
The applicant originally applied for a Development Permit for 1 into 11 residential lots with access
from Elkhorn Drive. The proposal requires an extension to Elkhorn Drive, where lot sizes vary
from 601m2 to 718m2, apart from Lot 9, which includes the existing dwelling and shed with an
area of 4,249m2. Two (2) covenants are also proposed on the eastern (river) side boundary,
which seeks to exclude development in the riparian buffer and protect the Noosa River. The
applicant proposes to construct the extension to Elkhorn Drive to cul-de-sac standard or through
road, depending on the timing of the development of this site and the site adjoining to the west.
Refer Figure 1 – Proposed reconfiguration and Figure 2 – Subject and adjoining property.
The applicant on 19 October 2017 advised they are agreeable to accepting only a Preliminary
Approval for the proposal to allow the stormwater design to be further designed. This is
discussed further in Section 2.1 of this report.




Figure 1 – Proposed reconfiguration.




                                                                                   Page 75 of 135

Section 76

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018




Figure 2 – Subject and adjoining property



2.    SITE DETAILS
2.1. Background
During the application process the applicant submitted a number of preliminary stormwater
solutions for the site, some of which included significant infrastructure located within the riparian
buffer to the Noosa River; extensive filling of part of the site and a device built into the road
formation in order to drain the site predominantly to the Noosa River. To achieve a satisfactory
stormwater design, the applicant has now proposed:
    Lot 11 to be used as a detention basin to address stormwater generally flowing to the east;
      and
    Proposes to connect to the drainage reserve required for the development of the adjoining
      property to the west.
Refer Figure 3 - indicative location of stormwater solution. This will result in a reduction in
the number of lots from 11 to 10 and will require either the adjoining site to be developed and the
required drainage reserve created or alternatively the consent of the adjoining land owner to
discharge stormwater though their land. For this reason, the applicant has advised officers that
they would accept a Preliminary Approval only and amend the plans at a later date to reflect
these changes in order to receive a Development Permit.




                                                                                    Page 76 of 135

Section 77

GENERAL COMMITTEE MEETING AGENDA                                             15 JANUARY 2018




Figure 3 – indicative location of stormwater solution

2.2. Site Description
The site is located north and approximately 1 km from the Tewantin town centre on the western
bank of the Noosa River. The site has frontage to Elkhorn Drive of approximately 20 metres and
contains some mature vegetation, with some large cleared areas. The north and south eastern
corners of the site slope towards Noosa River to the east.
2.3. Surrounding Land Uses
The subject site has low density residential development to the north and south. Adjoining to the
west is a recently approved development for 22 residential lots which has been designed to
connect into the subject site.
3.    ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of the
following statutory planning instruments to the extent they are relevant to the development:
    State Planning Policy;
    South East Queensland Regional Plan;
    The Noosa Plan.
3.2. State and Other Statutory Instruments
State Planning Policy
The State Planning Policy has been deemed by the Minister for Local Government and Planning
as appropriately reflected in the Planning Scheme and therefore does not warrant a separate
assessment.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.


                                                                                 Page 77 of 135

Section 78

GENERAL COMMITTEE MEETING AGENDA                                                15 JANUARY 2018


3.3. Statutory Instruments – Planning Scheme
The application must be assessed against each of the following codes to the extent they are
relevant to the development:
    Tewantin & Doonan Locality Code
    Reconfiguring a Lot Code
    Water Sensitive Design Code
    Transport, Roads and Drainage Code
    Landscaping Code
    Waste Management Code
Locality Provisions
The subject site is located in the Tewantin & Doonan Locality and is zoned Detached Housing.
The proposed reconfiguration is consistent within the Locality provisions and the surrounding
residential area and is required to follow a code assessable application process.
Land Use & Works Provisions
The application has been assessed against applicable codes. The pertinent issues arising out of
the assessment against the codes are discussed below.
Proposed lots
All proposed lots achieve the minimum lot size requirement of 600m2 for the Tewantin Locality
and have an average lot size (excluding the large balance lot with the existing dwelling – lot 9) of
632m2. All lots meet the minimum width requirements.
The Biodiversity Overlay for the protection of vegetation applies to a small portion of the south
eastern corner of the site, while the riparian buffer applies to the eastern edge of the property.
The applicant proposes to address the Biodiversity Overlay by proposing two environmental
covenants within Lot 9. While environmental covenants would provide a level of protection for the
riparian buffer and the vegetation located in the south eastern corner, the dedication of this land
to Council for conservation purposes would afford a higher level protection. This dedication is
considered warranted given the importance of the Noosa River and riparian buffers to the river’s
water quality and as a wild life corridor. It is also recommended that a condition require the
inclusion of land behind the existing dwelling, beyond the fence line to the eastern boundary to
be also dedicated as public land/park.
The vegetation includes scattered semi-mature and mature trees comprising mango trees,
Moreton Bay Ash, Blue Gums, Turpentines and garden species. The understory is mown grass.
The supporting documents submitted with the application note that existing vegetation on site
outside the proposed covenant areas will be retained where appropriate.
There are three mature mango trees are located in proximity to the north western corner of the
proposed lot 9. It is likely two of the mango trees will remain in the lot, with one being removed to
facilitate the new road. It should be noted the clearing of orchard tree species is an exempt
activity under the planning scheme provisions for vegetation management and no permit is
required from Council to undertake this activity.
However, it is most likely that works associated with reconfiguration and future development of
the site will result in the removal of a significant amount of the site’s existing native vegetation.
The retention of large mature trees within the lots is not considered feasible nor prudent in area
intended to be developed for standard residential house lots. Some smaller groupings of trees
may be able to be retained within the lots and/or on road reserve. It is also considered the
dedication of the land areas marked Covenant A and B as public land will provide opportunity to
retain large mature trees within a public space and contribute to the ecological values associated
with the Noosa River and its riparian buffer areas.


                                                                                    Page 78 of 135

Section 79

GENERAL COMMITTEE MEETING AGENDA                                                  15 JANUARY 2018


Road Connectivity
A new road is proposed to connect to future development at the adjacent 20
Eagle Drive (Lot 6 RP149498), ultimately connecting Elkhorn Drive with Eagle Drive. The
resultant connectivity will provide for a continuous route between Elkhorn Drive and Eagle Drive.
This new route will also provide an improved outcome for residents and for services and
emergency vehicles.
However, should the adjoining property not develop at the same time there is no provision
proposed for vehicles, specifically Council’s waste collection vehicle, to turn around. In order to
provide an interim turn-around area amendments are required to the layout.
4.      CONSULTATION
4.1. Referral Agencies
No referral to IDAS Referral Agencies were required.
4.2. Other Referrals
The application was forwarded to the following internal Council officers:
      Engineering, Development Assessment
      Ecologist, Development Assessment
The application was also assessed by an external stormwater consultant on behalf of Council.
Their assessment forms part of this report.
5.      CONCLUSION & REASONS FOR DECISION
The proposal is generally compliant with the relevant sections of The Noosa Plan and is situated
in an existing residential area with close proximity to the Tewantin town centre. The lot layout is
generally sensitive to the environmental values on site and subject to some conditions is
responsive to the infrastructure required to service the development.
The request to issue a Preliminary Approval for the proposal is therefore supported.
Departments/Sections Consulted:
     Chief Executive Officer       Community Services                       Corporate Services
     Executive Officer             Community Development                    Financial Services
     Executive Support             Community Facilities                     ICT
                                   Libraries & Galleries                    Procurement & Fleet
                                   Local Laws                               Property
                                   Waste & Environmental Health             Revenue Services

     Executive Services        x   Environment & Sustainable Development    Infrastructure Services
     Community Engagement          Building & Plumbing Services             Asset Management
     Customer Service          x   Development Assessment                   Buildings and Facilities
     Governance                    Economic Development                     Civil Operations
     People and Culture        x   Environmental Services                   Disaster Management
                                   Strategic Land Use Planning              Infrastructure Planning, Design
                                                                            and Delivery




                                                                                       Page 79 of 135

The text continues on section 80.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.