Two different covenant areas are proposed over the site and include:
Coastal covenant: 6 metre strip along seaward boundary. (Note: Plan of Development -
Figure 2 does not include boundary setbacks within lots within covenant area however
Vegetation Management Plan Figure 5 does include boundary setbacks in the covenant
area).
Road buffer covenant: 10 metre strip along David Low Way and includes area of land
located over the northern part of the site, 50 metres from Burgess Creek.
The applicant indicates that covenant and vegetation buffers areas total 3643m2 or 38% of the
site and enable protection and rehabilitation of vegetation along David Low Way and to Burgess
Creek.
The proposed Statutory Environmental covenants include a number of requirements including:
Retention of vegetation along David Low Way (10 metres wide) (road buffer covenant).
Vegetation management obligations.
1.5 metre black pool style, gate free fence along the entire seaward boundary to restrict
uncontrolled access to the beach.
Habitat Protection Area (road buffer covenant) – though indigenous vegetation where it
poses a serious and imminent risk to human safety, including bushfire risk, may be cut
down or trimmed to remove the risk.
Bushfire Risk and Stormwater Management Areas (coastal covenant area) – No
combustible mulch permitted. No vegetation that is a climbing vine, shrub or a tree or an
environmental weed permitted. Only ground covers with a maximum height of 150mm to be
maintained.
Council obligations include maintenance of sight lines with regard to vegetation and access
and maintain bushfire fuel loads in adjoining reserves.
The existing access to the site is proposed to be relocated further southwards to provide better
sight distances. An easement for access and services is proposed 10 metres from the David Low
Way. Carparking for the development would be provided on each individual lot and a service/bin
area is proposed within the access and services easement adjacent to proposed Lot 715.
The lots are proposed to be connected to nearby water and sewer infrastructure and stormwater
is proposed to be treated on site for each lot with a 100m2 detention basin located along the
eastern boundary of each lot. Earthworks are also proposed for the site with the existing
northern knoll excavated by 2 to 3 metres and used to fill the low vegetated portion of the site.
The site will be substantially cleared as part of investigation into Unexploded Ordnance as well
as required for fire suppression and structure protection.
The following information was submitted as part of the application and information request:
Vegetation Management Plan - Cardno
Ecological and Bushfire Assessment – Cardno
Civil Engineering Assessment - Sheehy and Partners
Specific Engineering Assessments: Dr. T. Johnston/Cardno - Coastal Hazard and Erosion,
Flooding, Acid Sulphate Soils Geotechnical Assessment Stormwater Management
Traffic Engineering Report – TTM P/L
Unexploded Ordnance Assessment - OPEC Systems
Bushfire Management Plan – prepared by Cardno
Fauna Assessment prepared by Cardno
Page 50 of 135
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.