Original source · versioned page text
Recor Engineering Plans as submitted with Further Advice response
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
COOROY SOCIAL HOUSING
45 MAPLE ST, COOROY AND 9 MYALL ST COOROY, QLD
MYALL RISE PTY LTD
ST
DRAWING LIST
PLE
MA
DWG NO DWG TITLE
OPAL ST
C001 COVER SHEET LOCALITY AND DRAWING INDEX
C002 GENERAL NOTES
C003 EXISTING LAYOUT PLAN
ELM ST
GARNE
T ST
C010 OVERALL LAYOUT PLAN
GARNE
T ST
C020 BULK EARTHWORKS LAYOUT PLAN
C021 BULK EARTHWORKS SECTIONS
C022 SWALE LONGITUDINAL SECTION
VICTOR
Y LN
C030 EROSION AND SEDIMENT CONTROL LAYOUT PLAN
RUBY ST C031 EROSION AND SEDIMENT CONTROL DETAILS
C040 ROADWORKS AND DRAINAGE LAYOUT PLAN
ST
MYA
E C041 DRIVEWAY LONGITUDINAL SECTION
PL
E ST
LL S
MA
C042 DRIVEWAY TYPICAL SECTIONS
AL LN
T
WATTL
C043 FOOTPATH DETAIL PLAN
HOSPIT
ST C044 SETOUT PLAN
ELM
C046 FOOTPATH LONGITUDINAL SECTIONS
C047 FOOTPATH CROSS SECTIONS
C048 LINEMARKING LAYOUT PLAN
TOPAZ ST
C049 PAVEMENT DETAILS
C050 STORMWATER CATCHMENT LAYOUT PLAN
ST
MAPLE
C052 STORMWATER LONGITUDINAL SECTIONS
MY
C053 STORMWATER CALCULATION TABLE
AL
L
C054 DETENTION TANK DETAILS
ST
C060 TURNING PATH DRIVEWAY SHEET 1
C061 TURNING PATH DRIVEWAY SHEET 2
C062 TURNING PATH DRIVEWAY SHEET 3
LOCALITY PLAN
SCALE: NTS
NOT FOR CONSTRUCTION
---- ---- ---- ---- ---- North Point Approved Project Address Title
---- ---- ---- ---- ----
EOIN WHITMORE
45 MAPLE ST, COOROY AND 9 MYALL COVER SHEET LOCALITY AND DRAWING INDEX
N
---- ---- ---- ---- ---- 31423 06/08/2026 ST COOROY
---- ---- ---- ---- ---- For and on behalf of RECOR Pty Ltd.
C 06/08/2026 ISSUED FOR OPERATIONAL WORKS CS EW Scale ENGINEERING & PROJECT SERVICES Client Details Project Name Sheet Size
SUNSHINE COAST | BRISBANE
B 15/06/2026 ISSUED FOR APPROVAL - ARCHITECTURAL UPDATE CS EW NTS www.recor.au | ABN 89 647 469 707 MYALL RISE PTY LTD COOROY SOCIAL HOUSING A1
A 17/04/2026 ISSUED FOR OWP APPROVAL AY EW COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's Project Number Drawing Number Revision
client. This drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as
Rev Date Revision Description Drawn Check DO NOT SCALE, IF IN DOUBT ASK 'Issued For Construction' in the revision description. P0478-26-001 C001 C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 4 (of 34)
Section 2
GENERAL NOTES 22. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE MATTER AND STONES, WITH MAXIMUM PARTICLE SIZE OF 100MM AND CAPABLE INSPECTIONS:
BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF OF BEING COMPACTED INTO COHERENT FILLING TO THE SPECIFIED
1. ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN. THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, ROAD STANDARD. THE MATERIAL SHALL HAVE A MAXIMUM PLASTICITY INDEX OF 15%, THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS
RESERVE, PARKS/OPENSPACE, EASEMENTS. A SHRINK-SWELL INDEX OF LESS THAN OR EQUAL TO 1% AND A MINIMUM C.B.R. BEFORE ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO
2. ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. OF 10%. PROVIDE A MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED INSPECTIONS.
CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY SHOULD THE CONTRACTOR FAIL TO REQUEST AN INSPECTION, THE CONTRACTOR
23. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION
SETOUT THE WORKS. WILL BE RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE WORKS TO BE
DRAWINGS AND APPROVALS ON SITE AT ALL TIMES. 7. ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE
INSPECTED TO THE SATISFACTION OF RECOR. ANY INSPECTIONS THAT FAIL ARE TO
CONTENT FOR STANDARD COMPACTION.
3. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT BE RE-INSPECTED WITH ALL REINSPECTION COSTS TO BE PAID BY THE
24. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN CONTRACTOR.
SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND 8. ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE
CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT CONSTRUCTION CODE (2013). PROPERTY BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF RETAINING
GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED STANDARD a. PRESTART
WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS IN CUT. RETAINING
DRAWINGS AND SPECIFICATIONS U.N.O. 25. CONTOURS IN ADJACENT PROPERTIES HAVE BEEN GENERATED USING LIDAR WALLS ARE TO BE PREPARED IN ACCORDANCE WITH STRUCTURAL ENGINEERS
TOPOGRAPHY DATA FROM THE NOOSA-GYMPIE 2015 PROJECT AND JOINED TO SPECIFICATIONS, AND IN CONFORMANCE WITH CONSTRUCTION b. EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT
4. SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF SURVEY DATA FOR CONCEPTUAL PURPOSES ONLY. DUE TO THE NATURE OF REQUIREMENTS OF GEOTECHNICAL REPORT. AND EROSION CONTROL MEASURES UNSUITABLE GROUND
THE TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND LIDAR TOPOGRAPHY, DISCREPANCIES BETWEEN SURVEY LEVELS AND
LOCAL AUTHORITY REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT ADJOINING LEVELS MAY ARISE. IN THESE INSTANCES, SURVEY LEVELS ARE TO 9. REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR CONFIRMATION c. SIDE AND CUT OFF DRAINS
THEIR COST INCLUSIVE OF ANY ADDITIONAL COSTS INCURRED BY RECOR. TAKE PRECEDENCE. OF RETAINING WALL COLOUR AND FINISH.
d. STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL
5. EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS SUCH STANDARD SIGNS AND LINE MARKING NOTES 10. ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 2' SOIL
THEIR ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS TAKEN BY ENGINEERING SUPERVISION IN ACCORDANCE WITH APPENDIX B OF AS 3798.
RECOR OR THE PRINCIPAL FOR THE ACCURACY AND COMPLETENESS OF THIS 1. GENERAL e. STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT
a. ALL SIGNS AND PAVEMENT MARKING IS TO BE IN ACCORDANCE WITH THE THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL PROVIDE
INFORMATION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS HAVE BEEN
ACCURATELY ESTABLISH THE LOCATION AND LEVEL OF ALL EXISTING QUEENSLAND TRANSPORT MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES
CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS f. STORMWATER STRUCTURE BASE SLABS
SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY DISCREPANCIES (CURRENT EDITION). AND THE CONTROLLED FILL IS SUITABLE FOR PURPOSE TO THE REQUIRED
SHALL BE REPORTED TO THE SUPERINTENDENT. CONTRACTOR TO LOCATE 2. SIGNS BEARING CAPACITY UNDER THE PLATFORM/STRUCTURES AS SPECIFIED BY
AND PROTECT SERVICES AS REQUIRED DURING PROPOSED WORKS. g. PAVEMENT SUBGRADE
a. ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1906.1:2007 UNLESS NOTED THE GEOTECHNICAL REPORT.
OTHERWISE.
6. THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND 11. ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED TO h. PAVEMENT REINFORCING
b. SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO EDGE OF
SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN ON 98% STANDARD MAXIMUM DRY DENSITY OR A DRY DENSITY INDEX OF AT
THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING SERVICES CLASHES SIGN: LOCATION CLEARANCE NO KERB 600 BEHIND GUIDE POSTS BARRIER
LEAST 75% IN ACCORDANCE WITH THE GEOTECHNICAL REPORT IN LAYERS OF i. PAVEMENT PRIOR TO SEALING (PRESEAL)
PRIOR TO COMMENCEMENT OF CIVIL WORKS. CONTRACTOR TO IMMEDIATELY KERB 300 FROM FACE MOUNTABLE KERB 500 FROM FACE OF KERB.
250MM LOOSE THICKNESS (PRIOR TO COMPACTION).
REPORT ANY DISCREPANCIES TO RECOR AND AWAIT FORMAL DIRECTION c. PARKING CONTROL SIGNS TO BE MOUNTED TO FACE APPROACHING TRAFFIC
PRIOR TO COMMENCING CIVIL WORKS. j. RETAINING WALL FOOTING REINFORCING
AT 45° TO KERB OR CARRIAGEWAY EDGE. ALL OTHER SIGNS TO BE TURNED 12. COMPACTION TESTING TO BE CARRIED OUT AT A MINIMUM OF TWO TESTS PER
AWAY BY 5° FROM THE NORMAL TO APPROACHING HEADLIGHT. VERTICAL LIFT WHERE STRUCTURAL FILL HEIGHTS EXCEED 300MM IN
7. ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL ACCORDANCE WITH AS3798. CONTRACTOR TO UNDERTAKE ALL EARTHWORKS k. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL
3. SIGN SUPPORTS
BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS, TESTING IN ACCORDANCE WITH GEOTECHNICAL ENGINEER AND LOCAL
a. SLEEVED SIGNS SUPPORTS ARE TO BE PROVIDED IN ALL AREAS WHERE THEY
CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS. AUTHORITY REQUIREMENTS. l. STEEL REINFORCEMENT OF CONCRETE STRUCTURES
ARE IN A PAVED SURFACE.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO 4. LINEMARKING
a. REDUNDANT LINEMARKING IS TO BE GROUND OFF. 13. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN m. PRACTICAL COMPLETION
AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR REINSTATEMENT ACCORDANCE WITH LANDSCAPE DRAWINGS.
TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF b. THERMOPLASTIC LINEMARKING TO BE USED FOR ALL CONCRETE.
INFRASTRUCTURE OWNER/MANAGER / AUTHORITY/COUNCIL. n. ON MAINTENANCE
14. ALL NEW WORKS TO MATCH NEATLY INTO EXISTING LEVELS.
9. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL
JOINTING NOTES o. OFF MAINTENANCE
15. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED
WORKPLACE HEALTH AND SAFETY REQUIREMENTS. 1. ALL JOINTING AND CONCRETE TO BE IN ACCORDANCE WITH THE MANAGEMENT PLANS.
REQUIREMENTS OF AS3727.1:2016.
p. ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER
10. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE 2. SAW CUT JOINTS MUST BE:
16. CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES ARE DEVELOPMENT APPROVAL)
a. BETWEEN 1 AND 1 OF CONCRETE PAVEMENT DEPTHS.
PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE,
INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE DOWNS, SILT FENCE ETC IN
CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL MEASURES 4 3
ACCORDANCE WITH EROSION AND SEDIMENT CONTROL PLAN
NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND b. CLEARED OF ANY DEBRIS FROM THE CUTTING METHOD.
INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW VIBRATION
c. PERFORMED WITHIN 6 TO 12 HOURS OF FINISHING CONCRETE POURS. 17. ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS OR
EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.
3. DOWELL BARS MUST BE INSTALLED EXACTLY 90° TO THE FACE OF JOINT TO RETAINING WALLS (TEMPORARY OR PERMANENT) AS PER RELEVANT
ALLOW EXPANSION AND CONTRACTION MOVEMENTS. AUSTRALIAN STANDARDS AND LEGISLATION.
11. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THESE
4. JOINTING LAYOUT TO BE CONFIRMED BY SUPERINTENDANT PRIOR TO
DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN
CONSTRUCTION COMMENCING. LAYOUT SHOULD AVOID ACUTE ANGLES IN THE 18. DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON UNPAVED
CONFIRMATION THAT WORKS CAN COMMENCE.
CONCRETE SLAB AND AVOID MISMATCHED JOINTS. ROADS, ACCESS TRACKS AND STOCKPILES AT A SUFFICIENT LEVEL TO
5. JOINT SEALANTS WHERE USED MUST ADHERE TO SIDE OF JOINT FACES ONLY SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS ARE TO COVER
12. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL AND SHALL NOT EXTEND ABOVE SIDES OF JOINTS ONTO THE SLAB SURFACE. OR ENCLOSE STOCKPILES WHERE REASONABLY PRACTICAL TO RESTRICT
CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT 6. DOWEL BARS ARE TO BE DUST MOVEMENT.
REQUIREMENTS. UNLESS OTHERWISE ADVISED BY RECOR CONTRACTOR TO a. FOR 100MM THICK SLAB, 12MM Ø OF LENGTH 300MM AND SPACED AT 400MM
NOTE COUNCILS ADAC REQUIREMENTS.
CENTRES 19. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS
13. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT b. FOR 125MM THICK SLAB, 16MM Ø OF LENGTH 350MM AND SPACED AT 300MM DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN
APPROVALS. CENTRES CONFIRMATION THAT WORKS CAN COMMENCE.
c. FOR 150MM THICK SLAB, 20MM Ø OF LENGTH 400MM AND SPACED AT 300MM
14. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL, 20. ALL EXCAVATIONS ARE TO BE CONDUCTED IN ACCORDANCE WITH THE
CENTRES
LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL REQUIREMENTS OF THE GEOTECHNICAL ENGINEER AS OUTLINED IN THE
CONSTRUCTION. GEOTECHNICAL INVESTIGATION REPORT BY TECTONIC. TEMPORARY
UNSURCHARGED CUTS IN LOOSE TO VERY LOOSE SAND TO BE FORMED AT
EARTHWORKS NOTES 1V:2H, AND IN MEDIUM DENSE SAND AT 1V:1H FOR BATTERS UP TO 3M IN
15. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION
1. FOR DETAILED GEOTECHNICAL INFORMATION, REFER GEOTECHNICAL HEIGHT. DEEPER CUTS ARE TO BE ASSESSED BY THE GEOTECHNICAL
WORKS COMMENCING ON SITE.
INVESTIGATION REPORT BY GEOTECHNICAL ENGINEER. IT IS RECOMMENDED ENGINEER.
THAT THE GEOTECHNICAL CONSULTANT BE CONTACTED TO CONFIRM THE
16. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS
SOIL CONDITIONS PRIOR TO EARTHWORKS COMMENCING. 21. WHERE THE ABOVE TEMPORARY BATTER SLOPES CAN NOT BE ACHIEVED,
AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.
TEMPORARY SHORING WILL BE REQUIRED UNDER THE ADVICE OF A
2. GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 100MM SPECIALIST SHORING CONTRACTOR.
17. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING
OVER THE EXTENT OF THE WORKS UNLESS DIRECTED OTHERWISE AND
PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT
STOCKPILED WHERE REQUIRED FOR FILL OF LANDSCAPING AREAS. TOPSOIL 22. EXCAVATIONS IN PROXIMITY TO EXISTING STRUCTURES WILL REQUIRE
OF ANY WORKS ON SITE.
MATERIALS MUST NOT BE USED IN STRUCTURAL FILL. SPECIFIC DESIGN TO PREVENT UNDERMINING WHICH SHOULD BE CARRIED
3. UNSUITABLE NATURAL MATERIALS SUCH AS SATURATED, LOOSE OR SOFT OUT BY A SUITABLY QUALIFIED AND EXPERIENCED RPEQ STRUCTURAL
18. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED MATERIALS ENCOUNTERED SHOULD BE REMOVED DURING SUBGRADE ENGINEER.
IN THE APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO PREPARATION FOR BULK EARTHWORKS. ALL UNSUITABLE MATERIAL TO BE
ENSURE ALL TREE ROOTS AND STUMPS ARE COMPLETELY REMOVED AND REMOVED FROM SITE AT CONTRACTORS EXPENSE. 23. CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT ANY
BACKFILLED TO LEVEL 1 SUPERVISION. CONTRACTOR TO ALLOW TO MULCH
CONSTRUCTED CUT/FILL BATTERS AND RETAINING STRUCTURES ON THE SITE
ALL CLEARED VEGETATION ANDSTOCKPILE ON SITE OR REMOVE FROM SITE
4. COMPACTION OF THE EXPOSED SAND SUBGRADE REQUIRES SUBSTANTIAL HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM FACTOR OF
AS DIRECTED.
VOLUMES OF WATER COMBINED WITH VIBRATORY COMPACTION EQUIPMENT. SAFETY AGAINST GEOTECHNICAL FAILURES TO THEIR SATISFACTION.
CARE MUST BE TAKEN TO ENSURE THERE ARE NO IMPACTS ON SURROUNDING
19. DRAWINGS TO BE READ IN CONJUNCTION WITH ARCHITECT, SURVEYOR,
STRUCTURES. MATERIAL TO BE COMPACTED IN ACCORDANCE WITH 24. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS INCLUSIVE OF
HYDRAULICS, ETC. CONSULTANT AND CONTRACTOR DRAWINGS.
GEOTECHNICAL REPORT AND AS1289. TOPSOIL LAYER. REFER TO STRUCTURAL ENGINEERING DRAWINGS FOR
BUILDING SLAB THICKNESSES AND HYDRAULIC DRAWINGS FOR SUB-FLOOR
20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY:
5. A MINIMUM 150MM THICK GRANULAR WORKING PLATFORM MAY BE REQUIRED DRAINAGE FOR DETERMINATION OF REQUIRED BULK EARTHWORKS SURFACE.
ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS
ON SOIL SUBGRADES ALONG HAUL ROADS AND LAYDOWN AREAS TO IMPROVE
WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS
TRAFFICABILITY. SPECIFIC PLATFORM DESIGN WOULD BE REQUIRED PRIOR TO 25. ANY PRELOADING REQUIRED IS TO OCCUR IN ACCORDANCE WITH THE
ASSOCIATED WITH IMPLEMENTATION OF THE TMP.
MOBILISATION AND TRAFFICKING OF ANY HEAVY MOBILE PLANT ON THE SITE. GEOTECHNICAL ENGINEERS REQUIREMENTS. CONTRACTOR TO ALLOW FOR
THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO UNDERTAKE
21. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL AUTHORITY
6. IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND COMPACTED THE PRELOADING OPERATIONS.
APPROVALS RECEIVED FOR THE PROJECT AND IN ACCORDANCE WITH OPW
WHERE UNSUITABLE NATURAL MATERIALS ARE LOCATED AND AS OTHERWISE
APPROVALS BY COUNCIL.
NECESSARY TO OBTAIN SUBGRADE/PLATFORM LEVEL. IMPORTED GENERAL 26. REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.
FILL MATERIAL SHALL BE CLEAN GRADED MATERIAL FREE OF ORGANIC
BEFORE YOU DIG
SERVICE LOCATIONS ENERGY SERVICE PROVIDERS TELECOMMUNICATIONS
IT IS THE RESPONSIBILITY OF THE PRINCIPAL AGL SERVICE PROVIDERS elstra Manual of Uniform Traffic Control Devices
CONTRACTOR TO CONTACT ALL RELEVANT ERGON. AUSTRALIA
SERVICE AUTHORITIES TO VERIFY THE
ENERGY
energex ' yes' Telstra visionstream
LOCATION OF ALL EXISTING SERVICES PRIOR origin OPTUS WARNING: OPTIC FIBRE NOTE: ALL SIGNS & LINE MARKING TO BE IN
TO THE START OF CONSTRUCTION NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM EXTREME CARE TO BE TAKEN WHILE EXCAVATING IN THE
PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED VICINITY OF OPTIC FIBRE CABLES. LOCATIONS ARE TO ACCORDANCE WITH THE MANUAL OF
PRIOR TO START OF CONSTRUCTION. PHONE DBYD PRIOR TO START OF CONSTRUCTION. PHONE DBYD
BE CONFIRMED PRIOR TO START OF CONSTRUCTION. UNIFORM TRAFFIC CONTROL DEVICES.
NOT FOR CONSTRUCTION SERVICE LOCATIONS ON 1100 FOR DETAILS. SERVICE LOCATIONS ON 1100 FOR DETAILS.
---- ---- ---- ---- ---- North Point Approved Project Address Title
---- ---- ---- ---- ----
EOIN WHITMORE
45 MAPLE ST, COOROY AND 9 MYALL GENERAL NOTES
---- ---- ---- ---- ---- 31423 06/08/2026 ST COOROY
---- ---- ---- ---- ---- For and on behalf of RECOR Pty Ltd.
C 06/08/2026 ISSUED FOR OPERATIONAL WORKS CS EW Scale ENGINEERING & PROJECT SERVICES Client Details Project Name Sheet Size
SUNSHINE COAST | BRISBANE
B 15/06/2026 ISSUED FOR APPROVAL - ARCHITECTURAL UPDATE CS EW www.recor.au | ABN 89 647 469 707 MYALL RISE PTY LTD COOROY SOCIAL HOUSING A1
A 17/04/2026 ISSUED FOR OWP APPROVAL AY EW COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's Project Number Drawing Number Revision
client. This drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as
Rev Date Revision Description Drawn Check DO NOT SCALE, IF IN DOUBT ASK 'Issued For Construction' in the revision description. P0478-26-001 C002 C
Section 3
113.6
NOTES:
116.2
1. FOR GENERAL NOTES REFER DWG 002, WHICH IS TO BE REQUESTED AND
VIEWED PRIOR TO COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED.
FH
EXISTING LINEMARKING 0.
0 2. THE CONTRACTOR WILL MAKE HIMSELF FULLY AWARE OF THE EXISTING
ExT
12
TO BE RETAINED FEATURES OF THIS SITE AND ENSURE ANY ADDITIONAL WORKS NOT
3
RP52184 SHOWN ON THIS PLAN ARE INCLUDED IN THE CONTRACT.
PP
Ex W
3. LOCATION AND DEPTH OF EXISTING SERVICES BASED ON SURVEY, DBYD
AND COUNCIL RECORDS. IT IS THE CONTRACTORS RESPONSIBILITY TO
Ex
CONFIRM ACTUAL LOCATION AND DEPTH PRIOR TO CARRYING OUT ANY
W
.4 X
X
120 EXCAVATION OR TRENCHING WORKS.
EX
O/H E
O/H E
IST
X
4. CONTRACTOR TO LOCATE AND PROTECT ALL EXISTING SERVICES ON SITE
EX
ING ASSE
/
6.0
11
EXISTING GRAVEL DRIVEWAY PRIOR TO COMMENCEMENT OF WORKS.
IST AS ExW
ExT
/X
X
DN T ID
8
5.
TO BE REMOVED 11
ING SET
120
150
X 5. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR TO ANY
.6
DN ID
12
ExW
IRO 34
0. DEMOLITION WORKS COMMENCING ON SITE.
PP
1 0 0 204
6
X
X
201 W
N W 91
Ex
AC 0277
6. ALL VEGETATION WITHIN THE LIMIT OF WORKS TO BE CLEARED, MULCHED
Ex
Ex
E
CONTRACTOR TO EXCAVATE AND
AT
120
120
.8
AND REMOVED FROM SITE IN ACCORDANCE WITH APPROVED VEGETATION
WA
E
.8
ER
LOCATE EXISTING ELECTRICAL
CLEARING PLAN (BY OTHERS) OR IF SCHEDULED STOCKPILE FOR USE BY
TE
X
X
CONNECTION AND PROTECT
MA
116.8
LANDSCAPER.
RM
DURING CONSTRUCTION WORK
IN
0
5.
11
.0 114.8
.4
A
O/H E
121
121
112
ExT
IN
4
.0
7. CONTRACTOR TO LOCATE ALL EXISTING UTILITIES ON SITE AND MAKE
RP112204
T
X
EXISTING TREES TO BE
X
SUITABLE ARRANGEMENTS TO HAVE DISCONNECTED PRIOR TO
ES
CLEARED AND GRUBBED DEMOLITION WORKS BEGINNING.
.2
X
ExW
119
114.2
EXISTING FENCE CONTRACTOR TO EXCAVATE,
PL
.2
121
Ex
X /
TO BE REMOVED LOCATE AND REMOVE OR CAP 8. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON
Ex
MA
.0
113.4
W
115.6
113
X
121.4
Ex
Ex
EXISTING WATER CONNECTIONS
E
O/H E
115
X THIS DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE
4.0
W
xS
12
E
11
E WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
115.2
0.
.8 WM
MY
12
PP
4
EXISTING CARPARK
.4
0.6
121.8
LINEMARKING TO BE 121 X/ 15
118.6
AL
12
X
11 9. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING
X
118.0
REMOVED BY C5605 7.0
0.
118.2
8
L
PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO
ExT
SANDBLASTING OR
ST
COMMENCEMENT OF ANY WORKS ON SITE.
O/H E
GRINDING
115.0
.6
121
11
X
115
X
CONTRACTOR TO EXCAVATE, 10. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES,
8.
ExW
EXISTING CONCRETE
0
X
LOCATE AND REMOVE OR CAP
.8
Ex
ROADS AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE
TO BE REMOVED
Ex
.6
11
W
EXISTING SEWER CONNECTIONS
114.8
U.N.O.
Ex
Ex
118
E
6.
0
E
W
X
.8
X
X
121 EXISTING 150Ø SEWER MAIN 11. WHERE NECESSARY, CONTRACTOR SHALL OBTAIN ALL NECESSARY
/
ExS
ASSET ID 2528441
/
/
114.6
S
APPROVALS TO CARRY OUT SERVICES RELOCATION OR ALTERATIONS.
X USIL 110.74
11
DSIL 110.35
ExT
X
6.2
X
114.4
.0
122
122.0
X
EXISTING CONCRETE
114.2
DRIVEWAY TO BE REMOVED NOTE:
ExW
X
119.8
Ex
Section 4
X
AND MAKE GOOD
Ex
EXCEPT WHERE NOTED ON PLAN AND ASSOCIATED DESIGN DRAWINGS, ALL
W
122.2
Ex
Ex
E
EXISTING BUILDING TO BE
IN-GROUND SERVICES WITHIN THE PROPERTY BOUNDARY INCLUDING BUT
E
119.6
X
W
REMOVE AND EXISTING
122
0.2 NOT LIMITED TO: STORMWATER DRAINAGE, SEWERAGE, WATER, GAS,
114.0
12 CONTRACTOR TO EXCAVATE,
.2
DWELLING MADE GOOD
X
114
ExS
4 X ELECTRICAL AND COMMUNICATIONS TO BE SAFELY BE DISCONNECTED,
X
LOCATE AND REMOVE OR CAP
115
2.
K
119.4
115
X
REMOVED FROM SITE AND CAPPED OFF AT SITE BOUNDARY. CONTRACTOR
12
.8
115
EXISTING SEWER CONNECTIONS
.0
115
X TO ARRANGE ALL NECESSARY APPLICATIONS AND PERMITS WITH THE
.2
ExT
115
.4
116
0.0 18 RELEVANT AUTHORITIES. SERVICES TO BE CAPPED IN ACCORDANCE WITH
.6
12
/
.8
/X
.0
C5605 RELEVANT SERVICE PROVIDER SPECIFICATIONS AND STANDARD DETAILS
3.8
119.2
X
X
11
Ex
1
Ex
122.6
Ex
W
E
RP99323
Ex
X
12
E
113
W
12
X
12
121
0.4
ExW
0.
/ X
12
PP
12
12
0.
.8 8
12
.6
12
122
6
12
1.
1.2
12
1.4
.0
11
ExS
1.6
8 EXISTING BUILDING
2.0
2.2
8.0
2.4
118.2
TO REMAIN
X
WM
X
X
H
123.0
X X / X X X X / X X X X/ X X
X
FH LEGEND:
Ex
X
IL:1
Ex
E
Ex
118.8
19.3
E
25 EXISTING CONTOURS (0.1m INTERVAL)
W
119.0
.2
X /
123 EXISTING BUILDING
SW
CONTRACTOR TO EXCAVATE ALL PALMS TO BE
5
119.2
P
119.4
123. AND LOCATE EXISTING WATER CLEARED AND GRUBBED REMOVED ADJACENT BOUNDARY
2
119.6
ExS
ExS
119.8
2
CONNECTION AND PROTECT
6
1.
.
120.0
121
12
ExT
113.6
DURING CONSTRUCTION WORK 19 PROPOSED BOUNDARY
C5605
3 2
X
120.2
.6
12
3
EXISTING POWER POLE EXISTING FENCE
RP99323 RP99323
TO BE RELOCATED TO
ACCOMMODATE NEW X X X EXISTING FENCE TO BE REMOVED
120.
Ex
123.8
FOOTPATH.
Ex
Ex
E
EXISTING BUILDING
120.6
4
EXISTING TREES TO BE
E
X
W
EXISTING PITS TO BE RAISED CLEARED AND GRUBBED / EXISTING KERB
TO NEW VERGE LEVELS X
ExS
OH EXISTING OVERHEAD ELECTRICAL
ExS
X
X
ExT
X X /X E EXISTING UNDERGROUND ELECTRICAL
SW EXISTING STORMWATER
Ex
W EXSTING WATER
Ex
1
Ex
E
E
W
123.4
SP161937
S EXISTING SEWER
ExS
T EXISTING TELSTRA
EXISTING TREES
2
3.
11
EXISTING TREES TO BE REMOVED
NOT FOR CONSTRUCTION
---- ---- ---- ---- ---- North Point Approved Project Address Title
---- ---- ---- ---- ----
EOIN WHITMORE
45 MAPLE ST, COOROY AND 9 MYALL EXISTING LAYOUT PLAN
N
---- ---- ---- ---- ---- 31423 06/08/2026 ST COOROY
---- ---- ---- ---- ---- For and on behalf of RECOR Pty Ltd.
C 06/08/2026 ISSUED FOR OPERATIONAL WORKS CS EW Scale ENGINEERING & PROJECT SERVICES Client Details Project Name Sheet Size
SUNSHINE COAST | BRISBANE
B 15/06/2026 ISSUED FOR APPROVAL - ARCHITECTURAL UPDATE CS EW SCALE
2 0 2 4 6 8 10
(metres)
www.recor.au | ABN 89 647 469 707 MYALL RISE PTY LTD COOROY SOCIAL HOUSING A1
A 17/04/2026 ISSUED FOR OWP APPROVAL CS EW 1 : 200 (FULL SIZE) COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's Project Number Drawing Number Revision
client. This drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as
Rev Date Revision Description Drawn Check DO NOT SCALE, IF IN DOUBT ASK 'Issued For Construction' in the revision description. P0478-26-001 C003 C
The text continues on section 5.