Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Recor Engineering Plans as submitted with Further Advice response

of 34

Original PDF page 8, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          SEDIMENT RELEASE GUIDELINES                                                   a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD BE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           DIVERTED AROUND THE WORK SITE WHERE POSSIBLE.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          1.   ALL RELEASES OF STORMWATER CAPTURED ONSITE, UNLESS                       b. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               OTHERWISE NOTED IN THIS STANDARD, MUST NOT EXCEED THE                       INSTALLED AND BE OPERATIONAL BEFORE COMMENCING
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               FOLLOWING LIMITS:                                                           UP-SLOPE EARTHWORKS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ·    50mg/L OF TOTAL SUSPENDED SOLIDS (TSS) AS A MAXIMUM                      c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED,
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               CONCENTRATION;                                                              EXPOSED SURFACES TO BE EITHER MULCHED, COVERED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ·    TURBIDITY (NTU) VALUE LESS THAN 10% ABOVE BACKGROUND;                       WITH EROSION CONTROL BLANKETS OR TURFED IF
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ·    pH VALUE MUST BE IN THE RANGE 6.5 TO 8.5 EXCEPT WHERE,                      EARTHWORKS ARE EXPECTED TO BE DELAYED FOR MORE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               AND TO THE EXTENT THAT, THE NATURAL RECEIVING WATERS                        THAN 14 DAYS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               LIE OUTSIDE THIS RANGE.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          2.   THE CONCENTRATION OF TSS RELEASED BY DEWATERING MAY               SEDIMENT FENCE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               ONLY EXCEED 50mg/L WHERE IT CAN BE DEMONSTRATED AND               10. FOR SEDIMENT FENCE STANDARD DETAIL AND SPECIFICATION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               SUPPORTED THROUGH DOCUMENTATION THAT:                                 REFER TO INTERNATIONAL EROSION CONTROL ASSOCIATION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ·    FURTHER SIGNIFICANT RAINFALL IS FORECAST TO OCCUR                     AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWINGS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               BEFORE THE TSS CONCENTRATION IS LIKELY TO BE REDUCED                  SF-01 AND SF-02 SEDIMENT FENCE.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               TO 50m                                                            TEMPORARY CONSTRUCTION ENTRY/EXIT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ·    g/L;                                                              11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL AND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ·    RELEASING A HIGHER CONCENTRATION OF TOTAL SUSPENDED                   SPECIFICATION REFER TO INTERNATIONAL EROSION CONTROL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               SOLIDS WILL RESULT IN A BETTER ENVIRONMENTAL OUTCOME                  ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               BY PROVIDING STORAGE FOR THE CAPTURE AND TREATMENT OF                 DRAWINGS EXIT-01 AND EXIT-02 CONSTRUCTION EXIT - ROCK




                                                                                                                                                       ExT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               RUN-OFF FROM THE IMMINENT RAINFALL AND RUN-OFF.                       PAD (CONSTRUCTION SITES ONLY), EXIT-03 - ROCK PADS FOR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ·    ALL REASONABLE AND PRACTICABLE STEPS HAVE BEEN TAKEN                  BUILDING SITES AND EXIT-04 AND EXIT-05 CONSTRUCTION EXIT -
                                                                                                                                                       PP                                                                                                                                                                                                                                                                                                                                                                                                                      TO TREAT THE WATER WITHIN BEST-PRACTICE TIME FRAMES;                  VIBRATION GRID.




                                                                                                                                     ExW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ·    FLOCCULENT HAS BEEN APPROPRIATELY APPLIED AND THE                 KERB INLET
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               CONCENTRATION OF TSS IN THE CAPTURED WATER HAS                    12. FOR KERB INLET STANDARD DETAIL AND SPECIFICATION REFER
                                                PROVIDE TEMPORARY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               ALREADY SIGNIFICANTLY DECREASED.                                      TO     INTERNATIONAL   EROSION     CONTROL      ASSOCIATION




                                                                                                                                                                                                                                                                                                                                                                                                                                                         Ex
                                                CONSTRUCTION ENTRY/EXIT.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          3.   FOR ALL OTHER STORMWATER RELEASES, FLOWS AND                          AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING




                                                                                                                                                                                                                                                                                                                                                                                                                                                          W
                                                                                                                           .4
                                                REFER C031 FOR DETAIL                                                120                                                                                                  | S|                                                                                                                                                                                                                                                                                                                                                 DISCHARGES FROM THE SITE, THE RELEASE LIMIT PRESCRIBED                ESC-03 KERB INLET SEDIMENT TRAPS




                                                                                                                                                  O/H E
                                                                                                                                                  O/H E
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               IN (1A) ABOVE MUST NOT BE EXCEEDED UNLESS THE                     REVEGETATION




                                                                                                                                                                                                                                          |S|
                                                                                                                                                                                             /                                                                                                                                                                                                                                                                                                                                                                                 DEVELOPMENT IS IN FULL COMPLIANCE WITH THIS STANDARD.             13. FOR REVEGETATION STANDARD SPECIFICATION REFER TO
                                                                                                                                                                                                      |S|                                                                                                                                                                                                                                                                                                                                                                                                                                            INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA
                                                                                                                                  ExT




                                                                                                                                                                                                                                                 /
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          SEDIMENT CONTROL                                                           (IECA)    BEST   PRACTICES    STANDARD     DRAWING      R-01
                                                                                                                                                                                       |S|                                                                                                                                                                                                                                                                                                                                                                                1. ALL SEDIMENT AND EROSION CONTROL MEASURES TO BE IN                      REVEGETATION GENERAL.
                                                                                                   12                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ACCORDANCE WITH INTERNATIONAL EROSION CONTROL                       FIELD INLET
                                                                                                               ExW




                                                                                                        0.




                                                                                                                                                                                                                                                   |S|
                                                                                                          6                                           PP                                                                                                                                                                                                                                                                                                                                                                                                                     ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE                     14. FOR FIELD INLET STANDARD DETAIL AND SPECIFICATION REFER




                                                                                                                                                                                                                                                                                                                                                                                                                                              Ex
                                                                                                                                                                |S|                                                                                                                                                                                                                                                                                                                                                                                                          SPECIFICATIONS.                                                         TO     INTERNATIONAL   EROSION     CONTROL      ASSOCIATION




                                                                                                                                                                                                                                                                                                                                                                                                                                                 W
                                                            Ex




                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Ex
                                                             Ex




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          2. SEDIMENT AND EROSION CONTROL DETAILS SHOWN ARE                          AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING
                                                              E




                                                                                            120




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  W
                                                                E




                                                                                                  .8                                                                                                                                                                                       PROVIDE TEMPORARY                                                                                                                                                                                                                                                                 MINIMUM    REQUIREMENTS.    IT  IS   THE   CONTRACTORS                  ESC-02 GRATED STORMWATER (FIELD) INLET SEDIMENT TRAP.
                                                                                                                                                                                                                                                                                           SEDIMENT FENCE.                                                                                                                                                                                                                                                                   RESPONSIBILITY TO INSTALL ADDITIONAL CONTROL MEASURES               OPERATION AND MAINTENANCE




                                                                                                                                                                                                                                                            |S|
                                                                                                                                                                                                                                                                                           REFER C031 FOR DETAIL                                                                                                                                                                                                                                                             AS DEEMED NECESSARY THROUGHOUT CONSTRUCTION.                        15. IN ACCORDANCE WITH NC ESC GUIDELINES, ALL ESC MEASURES
                                                                                        .0                                                                                                                                                                                                                                                                                                                                                                                                                                                                                3. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT                  SHALL BE INSPECTED: · AT LEAST DAILY (WHEN WORK IS
                                                                                                                                                              O/H E


                                                                                     121
                                                                                                              ExT




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             CONTROL DEVICES IN A FUNCTIONAL ORDER AND REPLACE ALL                   OCCURRING ON SITE) OR WEEKLY (WHEN WORK IS NOT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL SUCCESSFUL                   OCCURRING ON SITE) · WITHIN 24 HOURS OF EXPECTED RAIN;
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             OFF MAINTENANCE OF WORKS.                                               AND · WITHIN 18 HOURS OF A RAINFALL EVENT (I.E. AN EVENT OF




                                                                                                                                                                                                                                                                      |S|
                                                                                       ExW




                                                                                .2                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        4. CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO                      SUFFICIENT INTENSITY AND DURATION TO MOBILISE SEDIMENT
                                                                            121




                                                                                                                                                                                                                                                                                                                                                                                                                                                               Ex
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             THE SATISFACTION OF THE SUPERINTENDENT. SHALL BE                        ON SITE).




                                                                                                                                                                                                                                                                            /
                                                                                     Ex




                                                                                                                                                                                                                                                                                                                                                                                                                                                                 W
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  115.6
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             COMPLETED AND EFFECTIVE PRIOR TO:                                   16. IN ACCORDANCE WITH NC ESC GUIDELINES, MAINTENANCE OF




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             Ex
                                                                                            Ex
                                                                                        E




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    O/H E




                                                                                                                                                                                                                                                                                                                                                                                                                                                                    115




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                W
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      S
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             a. STRIPPING OF TOPSOIL AND GRASS.                                      ESC MEASURES SHALL OCCUR IN ACCORDANCE WITH THE
                                                                                                                                                      12
                                                                                              E




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Ex




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         115.2
                                                                                                                                                        0.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                       .8 WM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             b. BULK EARTHWORKS TO THE SITE.                                         FOLLOWING TABLE:
                                                                                                                                         12




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                PP
                                                                                                                                                          4




                                                                                                                                                                                                                                                                              |S|
                                                                       .4
                                                                                                                                            0




                                                                 121                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         c. SERVICES INSTALLATION.
                                                                                                                                                                                /
                                                                                                                                           .6




                                                                                                                                                                                                                                                                                                                                                                                                                                                       |S|
                                                                                                                      12




                                                                                                                                                                                                                                                                                                                                                                                                                                 11                                                                                                                                          d. PAVEMENT CONSTRUCTION
                                                                                                                                                                                                                                                                                                                                                                                                                                   7.0
                                                                                                                         0.
                                                                                                                            8




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          MAINTENANCE SCHEDULE
                                                                                      ExT




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          5. ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN
                                                                                                                                                                                                                                                                                                                                                                                                                                       |S|




                                                                                                                                                                                                                                                                                                                                                                                                                                                                   |S|
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             PLACE UNTIL INSTRUCTION IS RECEIVED IN WRITING FROM THE
                                                                                                                                                                       O/H E




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     115.0
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT                                                                     TIMEFRAME FOR
                                                            .6                                                                                                                                                                                                                                                                                                                                                         |S|
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             MAINTENANCE




                                                                                                                                                                                                                                                                                          |S|
                                                         121




                                                                                                                                                                                                                                                                                                                                                                                                    11
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ESC MEASURES                              COMPLETION OF




                                                                                                                                                                                                                                                                                                                                                                                                                                                                       115
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             CONTROL APPLICATIONS.                                                                             TRIGGER




                                                                                                                                                                                                                                                                                                                                                                                                       8.
                                                                 ExW




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   MAINTENANCE




                                                                                                                                                                                                                                                                                                                                                                                                        0
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          6. THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN




                                                                                                                                                                                                                                                                                                                                                                                                                                                                          .8



                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Ex
                                                                                                                                                                                                                                                                                                                                                                                                       |S|
                                                                                                              Ex




                                                                                                                                                                                                                                                                                                                                                                          .6




                                                                                                                                                                                                                                                                                                                                                                                                                                                                   11
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             SHALL BE READ IN CONJUNCTION WITH THE APPROVED




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 W
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            WHEN SETTLED




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                114.8
                                                                                                              Ex




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Ex
                                                                                                                                                                                                                                                                                                                                                                    118
                                                                                                              E




                                                                                                                                                                                                                                                                                                                                                                                                                                                                      6.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                               |S|
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             DRAWINGS.
                                                                                                                                                                                                                                                                                                                                                                                |S|                                                                                                                                                                                                                                                                                       SEDIMENT EXCEEDS




                                                                                                                                                                                                                                                                                                                                                                                                                                                                         0
                                                                                                                     E




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          W
                                                    .8                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    7. PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO                       SEDIMENT BASIN                           WITHIN 7 DAYS OF
                                                121                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       THE VOLUME OF THE




                                                                                                                                                                                                                                                                                                       |S|
                                                                                            /




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             BE OBTAINED FROM THE SUPERINTENDENT FOR THE LOCATION                      (WHERE UTILISED)                          THE INSPECTION




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       ExS
                                                                                                                                                                                                                                                                                                                                                    |S|                                                                                                                                                                                                                                                                                                                   SEDIMENT STORAGE




                                                                                                                                                                                                                                                                                                             /
                                                                                                                                                                                                                             /




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              114.6
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               S                                                             OF THE SITE ACCESS POINT AND WASH DOWN AREA WHICH ARE                                              ZONE




                                                                                                                                                                                                                                                                                                                                                                                                                                                              11
                                                                                                                                                                                                                                                                                                                         |S|                                                                                                                                                                                                                                                 TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.
                                                                 ExT




                                                                                                                                                                                                                                                                                                                                                                                                                                                               6.2




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            |S|
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          8. IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN                                            1/3 OF THE CAPACITY




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          114.4
                                         .0                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  FOUND TO BE DIFFERENT OR FAILED IN SERVICE, CORRECTIVE                      OTHER ESC                              BY THE END OF THE
                                      122                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                MEASURES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          OF ESC MEASURES IS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       DAY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             ACTION IS TO BE UNDERTAKEN IMMEDIATELY WHICH MAY




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      114.2
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               EXCEEDED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             INCLUDE AMENDMENTS' ADDITIONS TO THE ORIGINAL APPROVED
                                               ExW




                                                                                                                                                                                             >




                                                                                                                                                                                                                                                                                                                 119.8




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Ex
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             EROSION CONTROL PLANS. SUCH AMENDMENTS ARE TO BE
                                                                                                                                  Ex




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          W
                                  122.2
                                                                                                                                          Ex




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         |S|
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 REPORTING




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Ex
                                                                                                                                     E




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             APPROVED BY SUPERINTENDENT, IF DEEMED NECESSARY AND
                                                                                                                                             E




                                                                                                                                                                                                                                                                                                                   119.6
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 17. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF ESC




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      W
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             RELEVANT.
                                                                                                                                                                                                                                                                        0.2
                                                                                                                                                                                                  >




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     MAINTENANCE AND CONTROL OF ALL STAGES OF WORK FOR




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       114.0
                                                                                                                                                                                                                                                                      12                                                                                                                                                                                                                                                                                                  9. OVERALL




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    114




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               ExS
                                4                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    APPROVAL BY THE SUPERINTENDENT.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                           115
                              2.



                                                                                                                                                                                                                                                                                                                         119.4




                                                                                                                                                                                                                                                                                                                                                                                                                                                                            115
                            12




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     .8 |S|
                                                                                                                                                                                                                                                                                                                                                                                                                                                                             115


                                                                                                                                                                                                                                                                                                                                                                                                                                                                               .0
                                                                                                                                                                                                                                                                                                                                                                                                                                                                               115
                                                                                                                                                                                                         >




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                .2
                                               ExT




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 115


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  .4
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  116
                                                                                                                                                                                                                                                                                0.0                                                                                                                                                                                                                                                                                       SEDIMENT AND EROSION 

Log in to download the original (Recor Engineering Plans as submitted with Further Advice response.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.