Recor Engineering Plans as submitted with Further Advice response

of 34

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                            1 METER MAX.                              STAR PICKETS

                                                                          PROVIDE WASH WATER FOR                                                                                                                     DROP INLET
                                                                                                                                                                                                                     WITH GRATE
                          TIMBER SLEEPER OR METAL                         TRUCKS EXITING SITE
                          GRID 100mm HIGH AND
                                                                                                                                                                                                                     WIRE OR STEEL MESH
                          SPACED AT 300mm CTS                              MIN LE                                                                                                                                    (14 GAUGE x 150mm                                                                                                                                                               WRAP FILTER
                                                                                  N   GTH 1                                                                                                                          OPENINGS) WHERE




                                                                                                                                                                                                                                                                                                                                                                                                                                                          500 - 600mm
                                                                                           0m                 BERM 300 HIGH MIN                                                                                                                                                                                                                                                                      CLOTH OVER GRATE
                                                                                                                                                                                                                     GEOTEXTILE IS NOT
                        CONSTRUCTION SITE                                                                                                                                                                            SELF-SUPPORTING
                                                                                                                                                                                                                     WOVEN GEOTEXTILE                                                                                                                                                                                                                                                             1.5m STAR PICKETS AT MAX.
                                                                                                                   EXISTING ROADWAY                                                                                                                                                                                                                                                                                                                                                               2.5m CENTRES



                        GEOTEXTILE FABRIC                                                                                                                                                                    STAR PICKET                                                                                                                                                                                                                                                                           SELF-SUPPORTING
                                                                                                                                                                                                             FITTED WITH                                                                                                                                                                                                                                                                           GEOTEXTILE
                                                                           50-75mm GRAVEL BED MIN                                                                                                            SAFETY CAP
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            FLOW
                                                                           200mm THICK                                                                                                                                                                                                                                                                                                                                                                                                         DIRECTION OF
                                            RUNOFF FROM PAD DIRECTED TO                                                                                                                          WOVEN GEOTEXTILE
                                                                                                                                                     SANDBAGS
                                            SEDIMENT TRAP
                                                                                                                                                                                                                 RUNOFF                                                                                                                                     WRAP FILTER CLOTH
                                                                                                                                                                                                                                                                                                                             RUNOFF                         OVER GRATE                                                                                                                             ON SOIL, 150mm x 100mm




                                                                                                                                                                              FLOW
                                                                                                                                                                                                                 WATER WITH
                                  TEMPORARY CONSTRUCTION VEHICLE EXIT                                                                                                                                            SEDIMENT                                                                                                    WATER WITH                                                                                                                                                            TRENCH WITH COMPACTED
                                                          SCALE: N.T.S.                                                                              WATERWAY                                                                                                                                                                SEDIMENT                                                                                                                                                              BACKFILL AND ON ROCK, SET
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   INTO SURFACE CONCRETE

                                                                                                                                                     EXCAVATION




                                                                                                                                                                                                                                                                                                                                                                                                                                                          600mm MIN.
                                                                                                                                                                                                                                                                                                                                                                            FILTERED                                                                                            SECTION DETAIL
                                                                                                                                                                                                                                                                 FILTERED
                                                                                                                                                                                                                                                                                                                                                                             WATER
                                                                                                                                                                                                                                                                  WATER
                                                                                                                                                                                                                GEOTEXTILE
                                                                                                                                                 EARTH BANK                                                     EMBEDDED 150mm
                                                                                                                                                                                                                INTO GROUND                                                                                                              GEOTEXTILE INLET FILTER TYPE B




                                                                                                                                                                                                                                                                                                                                                                                                                                         MIN. 1.5m
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      20m MAX.
                                                                                                                                                                                                                                                                                                                                                             SCALE N.T.S
                                                                                                                                                                                                 FOR DROP INLETS AT NON-SAG POINTS,                                                                                                                                                                                                                                                                   FLOW
                                                                                                                                                                                                 SANDBAGS, EARTH BANK OR EXCAVATION USED
                                                                                                                                                                                                 TO CREATE ARTIFICIAL SAG POINT                                                                                                                                                                                                                                   STAR PICKETS AT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  MAX. 2.5m SPACINGS
                                                                                                                                                       GEOTEXTILE INLET FILTER CONSTRUCTION NOTES:                                                                                                                                                                                                                                                                TYPICAL

                                                                                                                                                      1.    FABRICATE A SEDIMENT BARRIER MADE FROM GEOTEXTILE OR STRAW BALES.

                                                                                                                                                       2.   PICKET SPACING TO BE A MAXIMUM 1.0m CENTRES.                                                                                                                                                                                                                                                                                PLAN

                                                                                                                                                       3.   IN WATERWAYS, ARTIFICIAL SAG POINTS CAN BE CREATED WITH SANDBAGS OR EARTH
                                                                                                                                                            BANKS AS SHOWN IN THE DRAWING.
                                  TIMBER SPACER TO SUIT                             KERB-SIDE INLET
                                                                                                                                                       4.   DO NOT COVER THE INLET WITH GEOTEXTILES UNLESS THE DESIGN IS ADEQUATE TO
                                                                                                                                                            ALLOW FOR ALL WATERS TO BYPASS IT.                                                                                                                                                                                                                                                                                                 DIRECTION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        DISTURBED                                  1.5m STAR PICKETS AT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               OF FLOW
                                                                                                                                                                                     GEOTEXTILE INLET FILTER A                                                                                                                                                                                                                                                          AREA                                       MAX. 2.5m CENTRES

                                                                                                                                                                                                  SCALE N.T.S




                                                                                    GRAVEL-FILLED WIRE MESH OR
                                                                                    GEOTEXTILE "SAUSAGE"


                                                     OVERFLOW              TIMBER SPACER
                          RUNOFF
                                                                           TO SUIT                                                                                                                                                                                                                                                                                                                                                                                      UNDISTURBED
                          WATER WITH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        AREAS
                          SEDIMENT




                             SEDIMENT

                           GRAVEL-FILLED WIRE MESH                                 FILTERED WATER                                                                   GRADIENT OF
                           OR GEOTEXTILE "SAUSAGE"                                                                                                                  DRAIN 1% TO 5%                             CAN BE CONSTRUCTED                                ALL BATTER GRADES
                                                                                                                                                                                                               WITH OR WITHOUT                                   2(H):1(V) MAX.
                                                                                                                                                                                                               CHANNEL                                                                                                                                                                                                             SEDIMENT FENCE CONSTRUCTION NOTES:
                                                                                                                                                                                                                                                                                                                                                                                STABILISE STOCKPILE SURFACE
                                                                                                                                                                    DIRECTION
                                                                                                                                                                                      OF FLOW                                                                                                                                                                                                                                      1.           CONSTRUCT SEDIMENT FENCES AS CLOSE AS POSSIBLE TO BEING PARALLEL TO
                                   MESH & GRAVEL INLET FILTER CONSTRUCTION NOTES:                                                                                                                                                                                                                                   EARTH BANK                                                2:1




                                                                                                                                                                                                                                                                                   .
                                                                                                                                                                                                                                                                                                                                                                                                                                                THE CONTOURS OF THE SITE, BUT WITH SMALL RETURNS AS SHOWN IN THE
                                                                                                                                                                                                                                                                                                                                                                   X.)




                                                                                                                                                                                                                                                                         300mm MIN
                                                                                                                                                                                                                                                                                                                                                                                    SL
                                                                                                                                                                                                                                                                                                                                                               (MA                       OP                                                     DRAWING TO LIMIT THE CATCHMENT AREA OF ANY ONE SECTION. THE
                                   1.   INSTALL FILTERS TO KERB INLETS ONLY AT SAG POINTS.                                                                                                                                                                                                                                   FLOW                           PE                              E   (M
                                                                                                                                                                                                                                                                                                                                                        S LO                                      AX                                            CATCHMENT AREA SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF
                                                                                                                                                                                                                                                                                                                                                    2:1                                                .)                                       CONCENTRATED AT ONE POINT TO 50 LITRES PER SECOND IN THE DESIGN
                                   2.   FABRICATE A SLEEVE MADE FROM GEOTEXTILE OR WIRE                                                                                                                                                                                                                                                                                                                                                         STORM EVENT, USUALLY THE 10-YEAR EVENT.
                                        MESH LONGER THAN THE LENGTH OF THE INLET PIT AND                                                                                                                              2m MIN
                                                                                                                                                                        150mm MIN




                                        FILL IT WITH 25mm TO 50mm GRAVEL.                                                                                                                                                                                                                                                                                                                                                          2.           CUT A 150mm DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR THE
                                                                                                                                                                                                NOTE: ONLY TO BE USED AS TEMPORARY BANK                                                                                                                                     SEDIMENT FENCE
                                                                                                                                                                                                                                                                                                                                                                                                                                                BOTTOM OF THE FABRIC TO BE ENTRENCHED.
                                   3.   FORM AN ELLIPTICAL CROSS-SECTION ABOUT 150mm HIGH                                                                                                       WHERE MAXIMUM UPSLOPE LENGTH IS 80 METRES.
                                        x 400mm WIDE.                                                                                                                                                                                                                                                                                                                                                                              3.           DRIVE 1.5m LONG STAR PICKETS INTO GROUND AT 2.5m INTERVALS (MAX.) AT
                                                                                                                                                                                                                                                                                                                        STOCKPILE CONSTRUCTION NOTES:                                                                                           THE DOWNSLOPE EDGE OF THE TRENCH. ENSURE ANY STAR PICKETS ARE
                                   4.   PLACE THE FILTER AT THE OPENING LEAVING AT LEAST A                                                                         DIVERSION DRAIN CONSTRUCTION NOTES:                                                                                                                                                                                                                                          FITTED WITH SAFETY CAPS.
                                        100mm SPACE BETWEEN IT AND THE KERB INLET. MAINTAIN                                                                                                                                                                                                                             1.     PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING
                                        THE OPENING WITH SPACER BLOCKS.                                                                                            1.   BUILD WITH GRADIENTS BETWEEN 1% AND 5%.                                                                                                                VEGETATION, CONCENTRATED WATER FLOW, ROADS AND HAZARD AREAS.                                        4.           FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE SIDE OF THE POSTS
                                                                                                                                                                                                                                                                                                                                                                                                                                                ENSURING IT GOES TO THE BASE OF THE TRENCH. FIX THE GEOTEXTILE WITH
                                   5.   FORM A SEAL WITH THE KERB TO PREVENT SEDIMENT                                                                              2.   AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.                                                                                 2.     CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.                                                         WIRE TIES OR AS RECOMMENDED BY THE MANUFACTURER. ONLY USE
                                        BYPASSING THE FILTER.                                                                                                                                                                                                                                                                                                                                                                                   GEOTEXTILE SPECIFICALLY PRODUCED FOR SEDIMENT FENCING. THE USE OF
                                                                                                                                                                   3.   ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER                                                                                          3.     WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS                                                 SHADE CLOTH FOR THIS PURPOSE IS NOT SATISFACTORY.
                                   6.   SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR THE                                                                              IRREGULARITIES THAT COULD IMPEDE WATER FLOW.                                                                                                           THAN 2 METRES IN HEIGHT.
                                        MESH OR GEOTEXTILE PROVIDING THEY ARE PLACED SO                                                                                                                                                                                                                                                                                                                                            5.            JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150mm OVERLAP.
                                        THAT THEY CAN FIRMLY ABUT EACH OTHER AND                                                                                   4.   BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL                                                                                        4.     WHERE THEY ARE TO BE PLACE FOR MORE THAN 10 DAYS, STABILISE
                                        SEDIMENT-LADEN WATERS CANNOT PASS BETWEEN.                                                                                      CROSS-SECTIONS, NOT "V" SHAPED.                                                                                                                        FOLLOWING THE APPROVED ESCP OR SWMP TO REDUCE THE C-FACTOR TO                                       6.           BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT
                                              MESH & GRAVEL INLET FILTER                                                                                           5.   ENSURE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.
                                                                                                                                                                                                                                                                                                                               LESS THAN 0.10.                                                                                                  THOROUGHLY OVER THE GEOTEXTILE.
                                                         SCALE N.T.S                                                                                                                                                                                                                                                    5.     CONSTRUCT EARTH BANKS ON THE UPSLOPE SIDE TO DIVERT WATER
                                                                                                                                                                   6.   COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS                                                                                                                                                                                                                                       SEDIMENT FENCE
                                                                                                                                                                                                                                                                                                                               AROUND STOCKPILES AND SEDIMENT FENCES 1 TO 2 METRES DOWNSLOPE.
                                                                                                                                                                        OF CONSTRUCTION.                                                                                                                                                                                                                                                                                       SCALE: N.T.S.
                                                                                                                                                                                                 DIVERSION DRAIN                                                                                                                                                   STOCKPILES
                                                                                                                                                                                                        SCALE N.T.S                                                                                                                                                      SCALE N.T.S




NOT FOR CONSTRUCTION
----      ----   ----                                                       ----        ----    North Point    Approved                                                                                                                                                                                                                  Project Address                                                                Title

----      ----   ----                                                       ----        ----
                                                                                                               EOIN WHITMORE
                                                                                                                                                                                                                                                                                                                                          45 MAPLE ST, COOROY AND 9 MYALL EROSION AND SEDIMENT CONTROL DETAILS
----      ----   ----                                                       ----        ----                   31423     06/08/2026                                                                                                                                                                                                       ST COOROY
----      ----   ----                                                       ----        ----                   For and on behalf of RECOR Pty Ltd.

 C     06/08/2026 ISSUED FOR OPERATIONAL WORKS                              CS         EW                      Scale                                                                                                                   ENGINEERING & PROJECT SERVICES                                                                    Client Details                                                                 Project Name                                                                                                      Sheet Size
                                                                                                                                                                                                                                          SUNSHINE COAST | BRISBANE
 B     15/06/2026 ISSUED FOR APPROVAL - ARCHITECTURAL UPDATE                CS         EW                                                             NTS                                                                                www.recor.au | ABN 89 647 469 707                                                                MYALL RISE PTY LTD                                                            COOROY SOCIAL HOUSING                                                                                                A1
 A     17/04/2026 ISSUED FOR OWP APPROVAL                                   AY         EW                                                                                                           COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's                                                                                                 Project Number                                                          Drawing Number                             Revision
                                                                                                                                                                                                    client. This drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as

Rev     Date                   Revision Description                       Drawn Check                                                 DO NOT SCALE, IF IN DOUBT ASK                                                                       'Issued For Construction' in the revision description.                                                                                                                        P0478-26-001                                                            C031                                         C

Log in to download the original (Recor Engineering Plans as submitted with Further Advice response.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.