Original source · versioned page text
Recor Engineering Plans as submitted with Further Advice response
Original PDF page 19, section 1. The text section number identifies this passage in the reader.
ExT
ExW
Ex
W
O/H E
O/H E
ExT
3/B
ExW
0.0158ha
Ex
W
Ex
Ex
Ex
E
W
E
O/H E
ExT
ExW
9/A
Ex
D
Ex
W
Ex
Ex
0.0337ha
E
O/H E
2/B
W
S
E
Ex
0.0190ha
ExT
O/H E
D
ExW
8/A
Ex
Ex
W
Ex
Ex
0.0131ha
E
E
W
/
ExS
D
S
1/B
ExT
0.0138ha
ExW
4/A
Ex
Ex
W
Ex
Ex
E
E
0.0307ha
W
1/E 6/A
ExS
D
K
0.0526ha 0.0139ha
ExT
2/A
/
7/A D
0.0267ha
0.0283ha
Ex
Ex
Ex
W
E
Ex
E
W
ExW
ExS
D
D
1/D H
LEGEND:
4/C 0.0392ha
D ADJACENT BOUNDARY
0.0512ha
Ex
IL:1
Ex
E
Ex
1
PROPOSED BOUNDARY
E
W
9.35
>
SW
P
EXISTING FENCE
ExS
ExS
>
ExT
EXISTING BUILDING
>
3/C D 3/A
EXISTING KERB AND CHANNEL
D
0.0452ha OE EXISTING OVERHEAD ELECTRICAL
>
0.0044ha
Ex
Ex
Ex
E
E EXISTING UNDERGROUND ELECTRICAL
>
E
W
>
SW EXISTING STORMWATER
>
>
1/C
ExS
> W EXSTING WATER
ExS
> > >
0.0018ha
ExT
S EXISTING SEWER
T EXISTING TELSTRA
Ex
EXISTING TREES
Ex
Ex
E
E
W
PROPOSED RETAINING WALL
PROPOSED CATCHMENT STORMWATER
ExS
PROPOSED ROOF CATCHMENT STORMWATER
PROPOSED STORMWATER PIPE
PROPOSED STORMWATER PIT & MANHOLE
RW
PROPOSED RAINWATER TANK
2 0 2 4 6 8 10
NOT FOR CONSTRUCTION SCALE
1 : 200 (FULL SIZE)
(metres)
---- ---- ---- ---- ---- North Point Approved Project Address Title
---- ---- ---- ---- ----
EOIN WHITMORE
45 MAPLE ST, COOROY AND 9 MYALL STORMWATER CATCHMENT LAYOUT PLAN
N
---- ---- ---- ---- ---- 31423 06/08/2026 ST COOROY
---- ---- ---- ---- ---- For and on behalf of RECOR Pty Ltd.
C 06/08/2026 ISSUED FOR OPERATIONAL WORKS CS EW Scale ENGINEERING & PROJECT SERVICES Client Details Project Name Sheet Size
SUNSHINE COAST | BRISBANE
B 15/06/2026 ISSUED FOR APPROVAL - ARCHITECTURAL UPDATE CS EW www.recor.au | ABN 89 647 469 707 MYALL RISE PTY LTD COOROY SOCIAL HOUSING A1
A 17/04/2026 ISSUED FOR OWP APPROVAL AY EW COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's Project Number Drawing Number Revision
client. This drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as
Rev Date Revision Description Drawn Check DO NOT SCALE, IF IN DOUBT ASK 'Issued For Construction' in the revision description. P0478-26-001 C050 C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.