Approved Plans - RAL22/0026

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                      -
                                                                                                                                                                                                                                                                                          APPROVED PLAN
                                                             BSP326083                                                                                                                                                                                                                       RAL22/0026
                                                                                              2SP326083
                                                                                                                                                                                                                                                                                          NOOSA COUNCIL
                                                                                                                                                                                                                                                                                          12 JANUARY 2022




                                                                                                                                                                              1SP326083

                                                                                                                                                                                                                    CSP326083
                                                             ASP326083
                                d
                              eR
                         ng
                       Ra

                                         .9
                                     72




                                                                                                                                                               418.6
                      in




                                                                                                                                                        1
                  nt a




                                                                                                                                                    1.882ha
                u




                                                                                                                                                                           30
                                                                 (127)
             Mo




                            9.2                                                                                                     147.5
                                                                     101.4




                                                                                                                                                                                                           30
                         10
                                                10
        ck




                                    17.9                                                                                                                                                       74
     Bla




                              3.4              5
                                                   28
                                        17.4




                                                                                                                                                                                                                                                                                              111.6
                       .2
                    34




                                                                                                                                                                                                                        4 8 .6
                  .1




                                                                                                                                                                                                                                                             53
                        BLE Lot 2
              56




                                                                                                                                                        2




                                                                                                                                                                                                                                                               .8
             10             831m²
                                                   17




                                                                                                                                                                                     Cov A
                                         18.5




                    17.3        16. 8
                                                                                                                                                                                                                                                  62.
                                                                                                                                                                                                                                                         9
             10




                                                                                                                                                 4.754ha
                       12




                                                                                                                                                                                    4.501ha                                                                          .9
                                                                                                                                                                                                                                                                26
                                                        21
                                    10




                                                                                                                                                                                                                                                                                                            119.7
                                                                                                                                                             (578)
                                                                                                                                                                              503




                                                                                                                                                          36RP897845




                                                                                                                                                                                                                                                                                         LEGEND

                                                                                                                                                                                                                                                                                          Proposed Lot Boundary
                                                                                                             Tallowood Pl                                                                                                                                                                 Proposed Covenant Boundary
                                                                                                                                                                                                                                                                                          Offset Dist
                                                                                                                                                                                                                                                                                          Position of Watercourse
                                                                                                                                                                                                                                                                                          Noosa Plan Overlay


                                                                                                                                                                                                                                                                              Proposed Building Location Envelope
                                                                                                            20RP897845                                  21RP897845
                                                                                                                                                                                                                              23RP897845
                                                                                                                                                                                              22RP897845
    Notes.                                                                                                                                                                                                                                                                    Proposed Vegetation Covenant
    1. Boundaries are compiled from RP131369 and have not been surveyed in the preparation
       of this plan. Areas and dimensions may therefore vary on survey.

   Client:
                       BRETT HAGE                                                   Horizontal Datum:     MGA 56 vide RTK CORS        Drawing Number:
                                                                                                                                                                        218806-03-01                                  Surveyed/Checked:   N/A                                               103 Wrigley St (Cnr Sugar Rd)
                                                                                                                                                                                                                                                                                            PO Box 5774
                                                                                    Vertical Datum:       N/A                                                            Sheet no.1 of 1 sheets.                     Drawn/Checked:       ENW/JPG                                           MAROOCHYDORE BC QLD 4558
   Drawing Title:
                       PROPOSAL PLAN                                                Co-Consultants:                                   Rev    Date         Description                                                Date:                25/11/2022                                        (P) 07 5479 5311
                                                                                                                                                                                                                                                                                            (E) [email protected]
                   Reconfiguration of Lot 3 on RP131369 into 2 Lots
   Site Description:                                                                         North Coast Environmental Services                                                                                      Scale:               1:1500 at A3                                      (W) www.cadcon.com.au
                   at 96 Black Mountain Range Rd,                                            Alta Projects (Consulting Engineers)                                                                               0                         50                 ACN 098 201 828 Part of CadCon International Pty Ltd
                   BLACK MOUNTAIN
Document Set ID: 22196599
Version: 1, Version Date: 01/12/2022
Log in to download the original file

Approved Plans - RAL22_0026.pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 42 pages

Page 2

                                              -
                                       APPROVED PLAN
                                          RAL22/0026
                                       NOOSA COUNCIL
                                       12 JANUARY 2022




Document Set ID: 22131081
Version: 1, Version Date: 07/10/2022

Page 3

                                              -
                                       APPROVED PLAN
                                          RAL22/0026
                                       NOOSA COUNCIL
                                       12 JANUARY 2022




Document Set ID: 22131081
Version: 1, Version Date: 07/10/2022

Page 4

                                              -
                                       APPROVED PLAN
                                          RAL22/0026
                                       NOOSA COUNCIL
                                       12 JANUARY 2022




Document Set ID: 22131081
Version: 1, Version Date: 07/10/2022

Page 5

                                              -
                                       APPROVED PLAN
                                          RAL22/0026
                                       NOOSA COUNCIL
                                       12 JANUARY 2022




Document Set ID: 22131081
Version: 1, Version Date: 07/10/2022

Page 6

                                              -
                                       APPROVED PLAN
                                          RAL22/0026
                                       NOOSA COUNCIL
                                       12 JANUARY 2022




Document Set ID: 22131081
Version: 1, Version Date: 07/10/2022

Page 7

                                                                                         -
                                                                                  APPROVED PLAN
                                                                                     RAL22/0026
                                                                                  NOOSA COUNCIL
                                                                                  12 JANUARY 2022




BUSHFIRE HAZARD ASSESSMENT AND MANAGEMENT
                  PLAN v1
                                      J001050

                         LOT 3 ON RP131369
           96 BLACK MOUNTAIN RANGE ROAD
                          BLACK MOUNTAIN




                                      FOR
                              BRETT HAGE
                                 JUNE 2022


      PO Box 9566 Pacific Paradise QLD 4564 / Email: [email protected]
                                  ABN 60 625 108 625

Page 8

Bushfire Hazard Assessment & Management Plan v1                                                                NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain




DOCUMENT CONTROL
Document:                    Bushfire Hazard Assessment & Management Plan
Client:                      Brett Hage
Project Number:              J001050

Project:                     Reconfiguration of a Lot
Site:                        Lot 3 on RP131369
                             96 Black Mountain Range Road, Black Mountain

File Ref:                    C:\CLIENTS\HAGE BRETT – 96 BLACK MTN RANGE RD BLACK
                             MTN\04_REPORTING\Bushfire Hazard Assessment & Management Plan v1 – 96
                             Black Mountain Range Road BLACK MOUNTAIN.docx




  Version       Date                       Distribution                    Author/s                         Approved

  1             27/06/2022                 Brett Hage;                     J. Isaacs (B. Env Sc.)           Joshua Lee
                                           E. Wilton – Cadcon              Environmental Scientist;         (B. Sc. AES, mEIANZ)
                                                                           Joshua Lee                       - Director
                                                                           (B. Sc. AES, mEIANZ,
                                                                           mFPA, mESA)
                                                                           - Director




DISCLAIMER
To the extent permitted by law, North Coast Environmental Services (including its employees, partners and consultants) excludes
all liability to any person for any consequences, including but not limited to all losses, damages, costs, expenses, and any other
compensation, arising directly or indirectly, from using this publication (in part or whole) and any information or material contained
in it.




© 2022                                                         i

Page 9

Bushfire Hazard Assessment & Management Plan v1                             NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain




Contents
1     INTRODUCTION                                                                    4

1.1 BACKGROUND                                                                             4
1.2 STATE PLANNING POLICY BUSHFIRE INTENSITY OVERLAY MAP                                   4
1.3 DEVELOPMENT PROPOSAL                                                                   4

2     SITE DESCRIPTION                                                                5

2.1    GENERAL                                                                             5
2.2    TOPOGRAPHY                                                                          5
2.3    VEGETATION WITHIN THE SITE                                                          6
2.4    VEGETATION EXTERNAL OF THE SITE                                                     6

3     HAZARD ASSESSMENT                                                               8

3.1 HAZARD ASSESSMENT METHODOLOGY                                                         8
3.1.1 LOCAL HAZARD AREA MAP                                                               8
3.2 VEGETATION HAZARD CLASSES                                                             9
3.2.1 VEGETATION HAZARD CLASS 3.1 – NOTOPHYLL VINE FOREST                                 9
3.2.2 VEGETATION HAZARD CLASS 24.1 – ACACIA OPEN FOREST ON RESIDUALS                      9
3.2.3 VEGETATION HAZARD CLASS 39.2 – LOW TO MODERATE TREE COVER IN BUILT UP AREAS       10
3.2.4 VEGETATION HAZARD CLASS 40.4 – CONTINUOUS LOW GRASS OR TREE COVER IN BUILT UP AREAS
      10
3.3 POTENTIAL BUSHFIRE INTENSITY CLASSES                                                13
3.4 BUSHFIRE HAZARD SUB-UNITS                                                           13
3.5 OVERALL LOCAL HAZARD MAP                                                            13
3.6 QUANTITATIVE MODELLING                                                              16

4     BUSHFIRE RISK ASSESSMENT                                                       19

4.1 GENERAL                                                                               19
4.2 RISK FROM IDENTIFIED HAZARDOUS VEGETATION                                             20

5     BUSHFIRE IMPACT REDUCTION MEASURES                                             21

5.1 GENERAL                                                                               21
5.2 ASSET PROTECTION ZONES                                                                21
5.2.1 GENERAL                                                                             21
5.3 WATER SUPPLY                                                                          22
5.4 FIRE BREAKS                                                                           23
5.5 VEHICULAR ACCESS                                                                      23
5.6 LANDSCAPING AND REGROWTH                                                              24
5.7 GENERAL PROPERTY MAINTENANCE                                                          24

6 AUSTRALIAN STANDARD 3959:2018 CONSTRUCTION OF BUILDINGS IN
BUSHFIRE PRONE AREAS (AS 3959:2018) SETBACKS                                         26

7     LEGISLATION AND OVERLAYS                                                       27

7.1 NOOSA PLAN 2020 – NATURAL HAZARDS OVERLAY CODE                                        27
7.2 STATE PLANNING POLICY – NATURAL HAZARDS, RISK AND RESILIENCE                          31

8     CONCLUSIONS                                                                    33




© 2022                                                       ii

Page 10

Bushfire Hazard Assessment & Management Plan v1                    NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain



8.1 CERTIFICATION MATTERS                                                        33

9   REFERENCES                                                              34

APPENDIX 1 – SITE LAYOUT                                                    35




© 2022                                                       iii

Page 11

Bushfire Hazard Assessment & Management Plan v1                                      NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain




1     INTRODUCTION

1.1       Background
This Bushfire Hazard Assessment and Management Plan has been prepared to assess and manage
the degree of potential bushfire hazard and associated risk acting on Lot 3 on RP131369, located at
96 Black Mountain Range Road, Black Mountain (referenced hereafter as ‘the site’). The site is the
subject of a Reconfiguration of a Lot development application to be submitted to Noosa Council. This
assessment is to be used to assist Council with their decision-making process.

1.2       State Planning Policy Bushfire Intensity Overlay Map
The site is mapped under the State Planning Policy (SPP) (refer to Plate 1) as containing the
following Potential Bushfire Intensity areas:
      •    Medium Potential Bushfire Intensity area; and
      •    Potential Impact Buffer.




                                  Plate 1 – SPP Bushfire Intensity Mapping Overlay

1.3       Development Proposal
The site is proposed to be subdivided into 2 rural residential allotments. Access to the proposed new
lot will be gained via a short access driveway connecting directly to Black Mountain Range Road.
The Plan of Development is included as Appendix 1.




© 2022                                                        4

Page 12

Bushfire Hazard Assessment & Management Plan v1                                      NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain



2    Site Description

2.1 General
The site covers approximately 6.6ha and has been improved with a dwelling and sheds in the north-
western corner of the site. The northern site extent is host to managed grassland whilst the southern
site extent is host to regrowth rainforest inclusive of a waterway. The site is located in the south-
western extent of the Black Mountain area.
The site is zoned as Rural Residential within the Noosa Plan 2020.
Plate 2 depicts the site’s position in the landscape and the extent of existing development.




                                    Plate 2 – Site Context (Source: Nearmap 2021)

2.2 Topography
The slope of the land is a major determinant of fire behaviour, particularly the slope of the land
under vegetation that contributes to bushfire hazard. Fire burns faster as it travels up slope, via
preheating of unburnt fuels ahead of the fire, increasing the rate of spread and fireline  intensity.
Conversely, fires move more slowly as they travel downslope. Fireline intensity (kW/m) is a function
of the rate of spread (QFES 2019).
The site is located on the eastern side of the Black Mountain Range ridgeline resulting in slopes
between 5-20 degrees on a mixed east aspect.
The site reaches a topographic high of approximately 200m AHD about the western boundary and
declines to a topographic low of 145m AHD about the eastern boundary.
A watercourse was observed flowing west to east through the regrowth rainforest in the south and
another was observed entering the north-eastern corner of the site. The watercourses meet about
the north-eastern corner of the site and exit the site into the easterly adjacent lot.
Plate 3 depicts topography conditions within and adjacent to the site.




© 2022                                                        5

Page 13

Bushfire Hazard Assessment & Management Plan v1                                         NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain




                              Plate 3 – Site Topography (Source: NC Interactive Maps)

2.3 Vegetation within the site
The vegetation on site consists of regrowth rainforest. The balance area of the site exhibits managed
grassland with low density mature trees.
2.4    Vegetation external of the site
Rural residential allotments containing a mixture of pasture and corridors of regrowth rainforest and
acacia open forests surround the site on all sides.
Hazardous bushland is located to the northwest, south, and west of the site. Continuous fuel load
pathways toward the site are fragmented by the presence of clearings, roads, and rainforest
vegetation along the balance perimeters of the site.
Plate 4 depicts the general extent of bushland fuel sources surrounding the site. Vegetation hazard
characteristics are described in Section 3.2.




© 2022                                                        6

Page 14

Bushfire Hazard Assessment & Management Plan v1                                                  NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain




                                               Open forest



                                                                                    Rainforest




           Open forest




                                                Open forest




                               Plate 4 – Dominant forest fire runs (Source: QLD Globe)




© 2022                                                        7

Page 15

Bushfire Hazard Assessment & Management Plan v1                                                                 NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain



3         HAZARD ASSESSMENT

3.1       Hazard Assessment Methodology
The Noosa Planning Scheme requires that a site-specific bushfire hazard assessment be prepared
to assess the degree of bushfire hazard on a site captured within a mapped Designated Bushfire
Hazard Area. The SPP Bushfire Prone Area mapping prevails over the Noosa Bushfire Hazard Area
mapping with respect to the currency of the methodology adopted to prepare the mapping.
Accordingly, the site-specific hazard mapping required is to be prepared consistent with the
methodology adopted to prepare the SPP mapping.
The methodology used to prepare the SPP mapping is described in:
      •    Department of Infrastructure, Local Government and Planning’s Natural Hazards, Risk and
           Resilience –– Bushfire (December 2019) State Planning Policy – state interest guidance
           material; and
      •    Queensland Fire and Emergency Services - (2019) Planning for Bushfire Resilient
           Communities.
Site-specific hazard maps are referred to as Local Hazard Area Maps in the SPP documents. The
preparation of Local Hazard Area Maps has been undertaken for the site in accordance with the
methodology described in the above referenced documents.

3.1.1      Local Hazard Area Map
A Local Hazard Area Map was prepared by adopting the following methodology:
      •    Categorizing the vegetation within the site in accordance with the vegetation hazard classes
           derived from QFES (2019);
      •    Using the patch and corridor filtering process to remove narrow corridors and small patches
           of VHC’s1;
      •    Subdividing the identified vegetation hazard classes into bushfire hazard sub-units based on
           slope differences and vegetation hazard classes. All upslope and across slope vegetation
           units are allocated an underlying slope of 1 degree as per methodology prescribed within
           Queensland Fire and Emergency Services - (2019) Planning for Bushfire Resilient
           Communities. The maximal slope recorded within 25m x 25m grids within the VHC’s is
           adopted as the effective slope underlying the VHC. A conservative approach is adopted
           where multiple slopes persist within VHC’s;
      •    Assigning SPP Potential Bushfire Intensity classes to the sub-units;
      •    Application of 100m Potential Impact Buffers to the amended sub-units to derive an overall
           Local Hazard Area Map.




1 The patch and corridor filtering process to remove or downgrade hazard levels of small patches and narrow corridors involves the

following three stages:
      •    Merging small patches of a single Vegetation Hazard Class less than 0.5 ha;
      •    Merging small Vegetation Hazard Class patches between 0.5 and 1 ha with higher or moderate fuel loads (greater than 8
           tonnes/ha); and
      •    Removing narrow corridors of vegetation less than 50m wide through a process of patch erosion and dilation. These small
           patches are merged with surrounding vegetation by allocating a patch to the Vegetation Hazard Class that is most common to
           the patch boundary (Leonard et al., 2017).




 © 2022                                                             8

Page 16

Bushfire Hazard Assessment & Management Plan v1                                         NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain



3.2       Vegetation Hazard Classes
The following vegetation hazard classes (classified in accordance with QFES (2019)) were identified
within the assessment area which includes a 150m buffer surrounding the site:
      •    Vegetation Hazard Class 3.1 – Notophyll vine forest;
      •    Vegetation Hazard Class 24.1 – Acacia open forest on residuals;
      •    Vegetation Hazard Class 39.2 - Low to moderate tree cover in built-up areas; and
      •    Vegetation Hazard Class 40.4 – Continuous low grass or tree cover.
The characteristics of each observed vegetation hazard class are described in the following sections
whilst Plan No. BF01 – Vegetation Hazard Classes depicts their distribution across the assessment
area.

3.2.1      Vegetation Hazard Class 3.1 – Notophyll vine forest
Vegetation Hazard Class 3.1 (VHC 3.1) is the dominant vegetation type within the site and offsite to
the northeast. The community exhibits an average canopy height of 16-22m with crown cover of
approximately 40-80%.
The canopy is dominated by Acacia concurrens (black wattle) and Acacia disparrima (hickory wattle)
but also contained Jagera pseudorhus (foambark), Macaranga tanarius, Guioa semiglauca (wild
quince), Flindersia schottiana (bumpy ash cudgerie), and Glochidion sumatranum (cheese tree).
The mid-storey contained a mix assemblage of Alphitonia excelsa (soap tree), Polyscias elegans
(celery wood), Alphitonia petriei (white ash), Mallotus claoxyloides (green kamala), and
Cinnamomum camphora (camphor laurel).
The understorey in the eastern site extent was almost dominated by a monoculture of Lantana
camara with Smilax australis (barbwire vine) and Solanum mauritianum (tobacco bush) also present.
Whereas the balance VC1 exhibited an understorey dominated by Pteridium esculentum (bracken
fern) in the gully with Smilax australis (barbwire vine), Cordyline rubra (cordyline lily), and scattered
Cinnamomum camphora and Lantana camara also present.
VHC 3.1 is attributed a potential combined surface fuel load of 4.5 t/ha and a potential total fuel load
of 12.0 t/ha (QFES, 2019). It should be noted that Rainforest vegetation is a low hazardous
vegetation type and is not assessable under the SPP 2019. Plate 5 depicts typical conditions within
VHC 3.1.




                                  Plate 5 – Characteristic vegetation within VHC 3.1

3.2.2      Vegetation Hazard Class 24.1 – Acacia open forest on residuals
Vegetation Hazard Class 24.1 (VHC 24.1) is the dominant vegetation type in the south and western
limits of the assessment area. The community exhibits an average canopy height of 10-15m with
crown cover of approximately 30-40%.
The canopy is dominated by a monoculture of Acacia melanoxylon (blackwood) but also contained
scattered regrowth rainforest species found in VHC 3.1 and low density of Eucalyptus tereticornis



© 2022                                                        9

Page 17

Bushfire Hazard Assessment & Management Plan v1                                        NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain



(forest red gum) and Eucalyptus microcorys (tallowood). The mid-storey contained regenerating
Acacia melanoxylon (blackwood) while the understorey was dominated by native and exotic grasses.
VHC 24.1 is attributed a potential combined surface fuel load of 9.5 t/ha and a potential total fuel
load of 10.1 t/ha (QFES, 2019). Plate 6 depicts typical conditions within VHC 24.1.




                                 Plate 6 – Characteristic vegetation within VHC 24.1

3.2.3    Vegetation Hazard Class 39.2 – Low to moderate tree cover in built up areas
Vegetation Hazard Class 39.2 (VHC 39.2) is characterised by periodically slashed grassland with
low-moderate density woody vegetation. It was noted that Tallowood Place exhibited a linear strip of
mature Eucalyptus microcorys (tallowood) and Eucalyptus tereticornis (forest red gum) lining the
road on either side. However, given the 1-2 tree wide density of the mature trees it was considered
to conform to VHC 39.2
VHC 39.2 is attributed a potential combined surface fuel load of 5 t/ha and a potential total fuel load
of 8 t/ha (QFES, 2019). Plate 7 depicts typical conditions within VHC 39.2.




                                 Plate 7 – Characteristic vegetation within VHC 39.2

3.2.4    Vegetation Hazard Class 40.4 – Continuous low grass or tree cover in built up areas
Vegetation Hazard Class 40.4 (VHC 40.4) is located across proposed Lot 1 area and offsite to the
northwest and east and is characterised by managed grassland (slashed/mown).
VHC 40.4 is attributed a potential combined surface fuel load of 4.5 t/ha and a potential total fuel
load of 5 t/ha (QFES, 2019). Plate 8 depicts typical conditions within VHC 40.4.




© 2022                                                       10

Page 18

Bushfire Hazard Assessment & Management Plan v1                                              NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain




                          Plate 8 – Characteristic vegetation within VHC 40.4 (foreground)




© 2022                                                       11

Page 19

THE SITE VHC 24.1 - Vegetation Hazard Class 24.1 UNITS OF VEGETATION REMOVED
Lot 3 on RP131369 Acacia open forest on residuals A AS PER THE PATCH AND CORRIDOR FILTERING PROCESS
Z\ (Leonard et. al (2017)

,_ 150m ASSESSMENT BUFFER VHC 39.2
i Vegetation Hazard Class 39.2
Low to moderate tree cover in built-up areas

VHC 3.1 VHC 40.4
Vegetation Hazard Class 3.1 Vegetation Hazard Class 40.4
Notophyll vine forest Continuous low grass or tree cover

PROJECT TITLE LIEN

I 1 roan sso PaiePaacea ou e0¢ | BUSHFIRE HAZARD ASSESSMENT BRETT HAGE TION HAZARD CLASSES 01050 BFO1
Services a ne san 00625 0828 N RANGE ROAD, BLACK MOUNTAIN eco — aise ne 12550@A3

 

Page 20

Bushfire Hazard Assessment & Management Plan v1                                         NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain



3.3    Potential Bushfire Intensity classes
Table 1 details the Potential Bushfire Intensity classes and their corresponding potential fire-line
intensity (KW/m) values as prescribed within Leonard et. al. 2017.
Table 1: Potential Bushfire Intensity classes




3.4    Bushfire Hazard Sub-Units
A sub-unit level Local Hazard Area Map has been prepared; Plan No. BF02 – Sub-Units and
identifies the site scale Potential Bushfire Intensity classes across the site. The sub-unit level Local
Hazard Area Map identifies that Medium Potential Bushfire Intensity Areas associated with the VHC
24.1 are located offsite to the northwest, south, and west.
NOTE: SUB UNIT 2 represents VHC 3.1 – Notophyll vine forest which in its remnant form (mature fuel loads
assumed) is classified as Prone Type 3 – Low hazard under Section 7.5.2 & Figure 14 of Bushfire Resilient
Communities 2019. Therefore, SUB UNIT 2 was not included within this assessment.

3.5    Overall Local Hazard Map
An overall Local Hazard Map has been prepared; Plan No. BF03 – Local Hazard Map and identifies
the Potential Bushfire Intensity classes across the site as well as associated 100m wide Potential
Impact Buffer areas. A Medium Potential Bushfire Intensity area has been identified offsite to the
northwest, south, and west with western portion of the site captured in the Potential Impact Buffer.

The Local Hazard Map presented in Plan No. BF03 is to supersede the SPP broadscale mapping
attributed to the site and should be used to guide the formulation of appropriate site-based bushfire
management measures for the proposal.




© 2022                                                       13

Page 21

Sub Unit 1a - stops assessed as 18 degrees due to Sub Unit being located down slope relevant to the development area.
(Firelineintensity calculated using Flamesol modelling adopting forest as the rel evant vegetation type}

 

Vegetation Hazard Class 5 i
# wy

 

forest on residuals |] | i pane) iv

 

Sub Unit 1b - siope assessed as 24 degree due to Sub Unit being located cown slope relevant to the devel opment area.
(Fireline intensity calculated using Flamesol modelling adopting forest as the rel evant vegetation type)

 

Vegetation Hazard Class | >”
#

 

IVHC 24.1 - Acaciaopen
forest on residuals

 

Sub Unit 2 -

 

Vegetation Hazard Class
#

 

 

VHC 3.1- Notophyll vine
forest

 

 

 

i - Slope assessed as degrees due to Sub Unit being located downslope relevant to the development area
Sub Unit 3 -s 16 due to Sub Unit bei di i the devel
(Firetine intensity calculated using Flamesol modelling adopting woodland as therelevant vegetation ty pe)
Reambnea] -
Vegetation Hazard Class |
a

 

 

VHC 39.2 - Low to
moderate tree cover In a 8 47 16 3,515
built-up areas

 

 

Sub Unit 4 -siope assessed as 16 degrees due to Sub Unit being located downs! ope relevant to the development area
(Fireline intensity calculated using Flamesol modelling adopting woodland as the relevant vegetation type)

 

Vegetation Hazard Class

, ity"

 

 

 

VHC 40.4 - Continous low Tt ae fy [| ee lai |
[grass or tree cover ee : ee ie inate He

 

 

 

 

 

 

 

# From: Leonard, J., & Opie, K., (2017) Estimating the petential bushfire hazard of vegetation patches and corridors —
an enhancement of Queensland's methodology tor State-wide mapping of bushfire prone areas. CSIRO, Australia.
* From: Leonard, J., Newnham, G., Opie, K, and Blanchi, R. (2014) A new methodology for state-wide mapping of
bushfire prone areas in Queensland. CSIRO, Australia.

** Prone Type 3 — Low Hazard, in its remnant form (mature fuel loads assumed) as per Bushfire Resilient
Communities 2019 Sections 7.5.2& Figure 14.

a
LEGEND

THE SITE MEDIUM POTENTIAL BUSHFIRE INTENSITY
Lot 3 on RP131369

150m ASSESSMENT BUFFER L HIGH POTENTIAL BUSHFIRE INTENSITY

| LOW POTENTIAL BUSHFIRE INTENSITY |] VERY HIGH POTENTIAL BUSHFIRE INTENSITY

 

 

 

 

 

 

 

 

 

 

 

 

 

orth Coast
Environmental PO Box 9686 Pacific Paradiee, ow.460¢ | BUSHFIRE HAZARD ASSESSMENT BRETT HAGE SUB UNITS J001050 BFO2 A
SSIVICES ns Aaneos26sc85 | 86 BLACK MOUNTAIN RANGE ROAD, BLACK MOUNTAIN A a aie 4:3200 @ A3

‘corrieo-r sauzzttves, rae SOCUNENT WAY HOTEE COPED CR TRESMTTESIN NF FORM ORS ANT
Ness oany ORIN Broke HT MoUT IME ae T'ey SowEN ONES

(SUE DETALS ONE int

Page 22

LEGEND

THE SITE MEDIUM POTENTIAL BUSHFIRE INTENSITY XQ POTENTIAL IMPACT BUFFER
[| Lot 3 on RP131369 a

[| 150m ASSESSMENT BUFFER |] HIGH POTENTIAL BUSHFIRE INTENSITY errr,
(A3) 1:3200
[| LOW POTENTIAL BUSHFIRE INTENSITY |] VERY HIGH POTENTIAL BUSHFIRE INTENSITY

 

~ North Coast Lailey el a [esi ee ia NORTH:
fe ronmental POBox $666 PaciicPandse ad 466+ | BUSHFIRE HAZARD ASSESSMENT BRETT HAGE LOCAL HAZARD MAP Jo01050 BFO3 A FX
TS cist tiniialia sanrsess 8 25 196 BLACK MOUNTAIN RANGE ROAD, BLACK MOUNTAIN 3 3 swosowe sone 1:2550 @A3 Sy,

Page 23

Bushfire Hazard Assessment & Management Plan v1                               NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain




3.6 Quantitative Modelling
Quantitative modelling of the potential bushfire conditions that may be experienced within the
identified hazardous vegetation unit; VHC 24.1 Acacia open forest on residuals, has been
undertaken to assist in determining the suitability of the development and any asset setback
requirements.
The models used comprise industry standard bushfire equations which have been built into
the FPAA endorsed FLAMESOL computer model. FLAMESOL allows numerous input
variables to be adjusted including fuel loads, fire danger index, site slope and distance to
vegetation. FLAMESOL uses the following algorithms:
    •    Rate of Spread – McArthur (1973) and Nobel et al. (1980)
    •    Flame Length – NSW Rural Fire Service (2001) and Nobel et al. (1980)
    •    Elevation of Receiver – Douglas and Tan (2005)
    •    Flame Angle – Douglas and Tan (2005)
    •    Radian Heat Flux – Drysdale (1999), Sullivan et al. (2003) and Douglas and Tan (2005)
The FLAMESOL Minimum Distance calculator has been used and comprises an AS
3959:2018 Method 2 (Appendix B) based calculator which will determine standard bushfire
behaviour variables as well as the minimum distances required to achieve a range of different
radiant heat levels (represented by BAL's).
Fuel load inputs have been drawn from Planning for Bushfire Resilient Communities (QFES
2019) based on the calculated potential fuel loads for VHC 24.1 (9.5 t/ha surface and near
surface fuels and 10.1 t/ha total fuels).
An 18º effective slope was adopted for the slope underlying the VHC 24.1 Acacia open forest
to the northwest, southwest, and west and a 24º effective slope was adopted for the slope
underlying the VHC 24.1 Acacia open forest to the southeast.
The default Flame Width of 100m was chosen given the large variance in the edge width of
the onsite and offsite VHC 24.1.
A Forest Fire Danger Index (FFDI) of 47 has been adopted for the site consistent with the
assignment by QFES (Catalyst 2020) (refer Plate 9).




                                    Plate 9 – FFDI (Source: QFES redi Map)

The Flamesol output results are shown in Plates 10 & 11.




© 2021                                                   16

Page 24

Bushfire Hazard Assessment & Management Plan v1                                       NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain




                   Plate 10 – VHC 24.1 (Acacia open forest) – 18 degree – 100m Flame Width




© 2022                                                      17

Page 25

Bushfire Hazard Assessment & Management Plan v1                                       NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain




                 Plate 11 – VHC 24.1 (Acacia open forest) – 24 degree – 100m Flame Width




© 2022                                                      18

Page 26

Bushfire Hazard Assessment & Management Plan v1                                           NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain



4     BUSHFIRE RISK ASSESSMENT

4.1       General
A bushfire risk assessment for the proposed building areas has been prepared generally in
accordance with State Planning Policy – State Interest Guideline – Natural Hazards, Risk and
Resilience (DILGP, 2016) and AS/NZS ISO 31000:2018 – Risk Management Methodology.
The bushfire risk assessment details the likelihood that the proposed development will be
exposed to radiant heat impact considering the proximity to bushfire prone vegetation and
likely bushfire behaviour. Plate 12 illustrates the main bushfire attack mechanisms acting on
buildings.




          Plate 12 – Figure A 5.1 Bushfire attack mechanisms (Planning for Bush Fire Protection, 2006)

According to AS/NZS ISO 31000:2018, a ‘hazard’ is defined as a source of potential harm or
a situation with a potential to cause loss, whereas a ‘risk’ is the chance of something
happening that will have an impact on objectives measured in terms of consequences and
likelihood. The State Planning Policy – State Interest Guideline – Natural Hazards, Risk and
Resilience (DILGP, April 2016) refers to ‘acceptable risk’, ‘tolerable risk’, and ‘intolerable risk’
which are defined below.
      •     Acceptable risk
                o   A risk that, following an understanding of the likelihood and consequences, is
                    sufficiently low to require no new treatments or actions to reduce risk further.
                    Individuals and society can live with this risk without feeling the necessity to
                    reduce the risks any further.
      •     Tolerable risk
                o   A risk that, following an understanding of the likelihood and consequences, is
                    low enough to allow the exposure to continue, and at the same time high
                    enough to require new treatments or actions to reduce risk. Society can live
                    with this risk but believe that as much as is reasonably practical should be done
                    to reduce the risks further.
      •     Intolerable risk
                o   A risk that, following an understanding of the likelihood and consequences, is
                    so high that it requires actions to avoid or reduce the risk. Individuals and



© 2022                                                      19

Page 27

Bushfire Hazard Assessment & Management Plan v1                                  NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain



                  society will not accept this risk and measures are to be put in place to reduce
                  risks to at least a tolerable level.
Assessment Benchmark 4 of the SPP Bushfire 2019 references radiant heat flux exposure of
<29kW/m² on any part of the building as generating an Acceptable to Tolerable level of risk.
AS/NZS ISO 31000:2018 defines ‘Likelihood’ as the chance that something might happen.
Likelihood can be defined, determined, or measured objectively or subjectively and can be
expressed either qualitatively or quantitatively (using mathematics ). The following ‘likelihood’
categories for the probability of the assessed bushfire attack mechanisms impacting the
assessment area have been adopted within this assessment:
      •    Likely - Will probably occur
      •    Unlikely - Could occur but doubtful
The determination of whether a bushfire event is likely or unlikely to occur (i.e., impact the
site) has been based on the relative position of hazardous vegetation to the site. Hazardous
vegetation located upwind of the site under typical south-east Queensland (SEQ) seasonal
fire winds; from the 225º south-west to 0ºnorth, is deemed to expose the site to a ‘likely’
probability of impact should a fire run occur from these directions. Hazardous vegetation
located downwind of the site under typical SEQ seasonal fire winds; 1º north to 224º south
south-west, is deemed to expose the site to an ‘unlikely’ probability of impact.

4.2       Risk from Identified Hazardous Vegetation
The Plan of Development depicts building envelopes within the proposed Lots which will be
primarily flanked by hazardous vegetation to the north, south, and west. The likelihood of a
fire approaching from the northwest, west, and southwest is considered likely, given dominant
regional fire weather winds are derived from the north-west to south-west.
The degree of separation offered to the adjoining vegetation is the primary driver of the
assigned level of risk and was determined with consideration to the Flamesol modelling output
presented in Section 3.3. In the absence of an appropriate separation buffer to the adjacent
vegetation, and implementation of relevant AS3959-2018 construction standards, the future
dwellings on the site could be exposed to direct flame, severe radiant heat and ember attack
during the modelled bushfire conditions resulting in total structure loss.

The Plan of Development provides a minimum 39m setback between the proposed building
envelopes and the closest hazardous vegetation (VHC 24.1 Acacia Open Forest) to the south-
west. 29.3m is the minimum separation required to ensure the proposed building envelopes
on the Lots 1 & 2 are exposed to <29kW/m² radiant heat flux as per the Flamesol modelling
presented herein.

The extent of proposed separation comprises land within the lots and the adjacent Black
Mountain Range Road reserve which is considered a reliable permanent low threat zone for
the life of the development. The Plan of Development therefore facilitates an acceptable risk
of radiant heat impact to the building envelopes thereby satisfying Assessment Benchmark 4
of the SPP Bushfire 2019.




© 2022                                                      20

Page 28

Bushfire Hazard Assessment & Management Plan v1                                NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain



5    BUSHFIRE IMPACT REDUCTION MEASURES

5.1 General
The following section describes bushfire impact reduction measures to be incorporated into
the proposed development to reduce the risk of bushfire impacts to people and property.
Implementation of the identified measures is not implied nor intended to advocate that building
occupants remain on the site during a bushfire event, nor that people and property will be
protected from bushfire impacts. The measures are intended to reduce the potential severity
of bushfire impact to the development and not prevent bushfire impact. The bushfire mitigation
measures have been derived from:
    •    Department of State Development, Manufacturing, Infrastructure and Planning’s State
         Planning Policy – State interest guidance material – Natural hazards, risk and
         resilience – Bushfire (December 2019) (referenced herein as SPP (Bushfire) 2019);
         and
    •    Queensland Fire and Emergency Services. (2019). Planning for Bushfire Resilient
         Communities.

5.2 Asset Protection Zones
5.2.1    General
Asset Protection Zones (APZ) provide a defensive tool to assist in the reduction of potential
bushfire impact to people and property situated in bushfire prone areas. For illustrative
purposes, Plate 13 depicts the concept of an APZ surrounding a dwelling in a bushfire prone
areas.




                                       Plate 13 – Asset Protection Zones

The development has been confirmed to be located within a bushfire hazard area hence
provision of adequate separation between the building envelopes nominated immediately
flanking the hazardous vegetation is required to provide a reasonable level of safety to site
occupants and emergency services staff.
The configuration of APZ’s is typically determined based on the results of the site-specific
hazard assessment including risk of bushfire impact, flame length analysis, applicable
AS3959-2018 Bushfire Attack Levels and State Planning Policy – State Interest Guidance
Material (Natural Hazards, Risks and Resilience – Bushfire) December 2019 Assessment
Benchmark setback requirements, with the latter the primary determining factor.
Assessment Benchmark 4 of the State Planning Policy – state interest guidance material
states:
Development supports, and does not hinder, disaster management response or recovery
capacity or capabilities. Where reconfiguring a lot creating lots of greater than 2000 square
metres:
To ensure emergency access and operational space for firefighters the subdivision layout
results in lots that are sited so that they are separated from the closest edge to the adjacent


© 2022                                                      21

Page 29

Bushfire Hazard Assessment & Management Plan v1                                    NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain



medium, high or very high potential bushfire intensity area by a distance that achieves a
radiant heat flux level of 29 kilowatt per square metre or less at:
1. The building envelope, if identified at RaL stage, or
2. Where a building envelope is not identified, at all the lot boundaries.
Compliance with Assessment Benchmark 4 can be attained where all allotments are
sufficiently separated from the nearby forest hazard so that a radiant heat flux level at any
point on the building envelope, or the lot boundaries where no building envelope is identified,
does not exceed 29 kW/m².
The output results from Plate 10 & 11 in Section 3.6 identify that a minimum setback of 21 &
29.3m is required to the edge of the adjoining VHC 24.1 vegetation to achieve the <29 kW/m²
radiant heat flux acting on the proposed building envelopes.
The Plan of Development provides a minimum 39m setback between the proposed building
envelopes and the closest hazardous vegetation (VHC 24.1 Acacia Open Forest) to the south-
west. 29.3m is the minimum separation required to ensure the proposed building envelopes
on the Lots 1 & 2 are exposed to <29kW/m² radiant heat flux as per the Flamesol modelling
presented herein.

The extent of proposed separation comprises land within the lots and the adjacent Black
Mountain Range Road reserve which is considered a reliable permanent low threat zone for
the life of the development.

To ensure the available separation is maintained for the life of the development all land
between the building envelopes and Black Mountain Range Road inclusive of 10m distance
around the future dwellings is to be maintained as a low threat low fuel load Asset Protection
Zone. Vegetative conditions in the APZ are to be provided as detailed in Section 5.6
Landscaping.

5.3 Water Supply
The availability of a reliable water supply for firefighting purposes is a vital tool in the defence
of bushfire impact. Reticulated water supply is currently not available within the site nor
proposed to be connected to the site. The proposed development will therefore require
provision of a readily accessible on-site emergency static water supply in accordance with
Assessment Benchmark 4 of the SPP Bushfire 2019. Assessment Benchmark 4 references
the QFES 2019 Bushfire Resilient Communities document for information regarding
appropriate static water supply. Section 9.1 of Bushfire Resilient Communities’ states:
An appropriate static water supply (in bushfire prone areas where reticulated supply is not
provided) to support effective emergency services response includes a water tank that is
available solely for firefighting purposes and can be accessed by firefighting appliances. The
water tank is to be provided within 10 metres of each building (other than a class 10 building),
which:
a) is either below ground level or of non-flammable construction;
b) has a take-off connection at a level that allows the following dedicated, static water supply
to be left available for access by firefighters:
i.10,000 litres for residential buildings;
It is therefore recommended that a dedicated 10,000 litres should be made available to the
future dwellings on each of the proposed new lots and this volume should be reserved for
firefighting purposes only. Plate 14 outlines an example of how this can be achieved.




© 2022                                                      22

Page 30

Bushfire Hazard Assessment & Management Plan v1                                    NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain




Plate 14 – Example Static Water Supply tank design for firefighting purposes (Source: Kingspan Group
2021)

5.4 Fire Breaks
The provision of fire breaks and fire trails within a site located in a bushfire prone area offers
an important bushfire defence measure to assist in reducing the risk and severity of bushfire
ingress onto and through a site.
Given the proposed Lots satisfy the Assessment Benchmark 4 criteria, the high density of Low
Potential Bushfire Intensity Areas surrounding the site, and as the westerly adjacent
hazardous bushland interface can be readily accessed by emergency services from Black
Mountain Range Road, the provision of additional fire break trails within the site is deemed
unnecessary.

5.5 Vehicular Access
Development in bushfire prone areas should be serviced by safe access/exit points for both
occupants and emergency services personnel. Assessment Benchmark 4 of the SPP Bushfire
2019 seeks:
To facilitate safe evacuation during a bushfire event, include a development footprint plan that
is located within 60 metres of the street frontage and sited to enable a route between the
development footprint plan and the street frontage with a gradient that does not exceed of
12.5 per cent.
The proposed Lot 2 building envelope and proposed Lot 1’s western building envelope will
gain access via short driveways (i.e., 10-20m length) connecting directly to Black Mountain
Range Road to the west of the site.
Proposed Lot 1’s eastern building envelope will gain access via a long driveway (approx.
350m) connecting to Black Mountain Range Road to the west of the site. However, as the
driveway for its majority will be located within the identified Low Potential Bushfire Intensity
Area, the length is considered acceptable.
All of the proposed access driveways are bordered by low threat conditions (i.e., VHC 40.4 or
VHC 3.1) on either side and hence the chance of access/egress becoming constrained within
a bushfire event is deemed low.
All new driveways are expected to achieve <12.5% grade.
It is recommended all new driveways and access easements are built to a minimum of 3.5m
width with 4.8m vertical clearance in accordance the QLD Fire Hydrant and Vehicle Access
Guidelines 2019.
Lot 1’s driveway is to provide a dedicated turning area at its terminus at the eastern building



© 2022                                                      23

Page 31

Bushfire Hazard Assessment & Management Plan v1                                  NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain



envelope/dwelling, or near to, for a QFES medium rigid vehicle in accordance the QLD Fire
Hydrant and Vehicle Access Guidelines 2019.
No further driveway recommendations are deemed necessary.

5.6 Landscaping and Regrowth
Existing and future landscaping within the site should avoid increasing the potential for
bushfire hazard. Assessment benchmark 5 of the SPP Bushfire 2019 seeks that the site layout
places the landscape and open spaces within the site between premises and adjacent mapped
medium, high or very high potential bushfire intensity areas. This landscaping and open space
comprises protective landscape treatments that:
1. Comprise only low threat vegetation (for example rainforest, grassland managed in a
minimal fuel condition, maintained lawns, golf courses and cultivated gardens etc); or
2. Are designed to ensure a potential available flammable fuel load is maintained at less than
8 tonnes/hectare in aggregate and with a fuel structure that remains discontinuous.
To reduce the potential for bushfire impact to buildings, structures and occupants as a result
of future regrowth and landscaping works within the site, it is recommended:
    •    Any landscaping within the nominated APZ’s satisfies Assessment Benchmark 5 of the
         SPP Bushfire 2019, including the low threat vegetation criteria prescribed in section
         2.2.3.2 of AS 3959:2018 or later iterations thereof;
    •    No woody mulch is used within 2m of buildings;
    •    No trees or shrubs are retained within 6m of the buildings;
    •    Beyond 6m, any trees desired to be retained are to be continuously defoliated below
         < 4m height above ground level and no limbs are to extend to within 6m of the roof line
         of the buildings. All pruning should be undertaken in accordance with AS 4373 Pruning
         of amenity trees;
    •    Future landscaping works/plantings maximise the use of locally indigenous, low
         flammability species within the edge of the rehabilitation areas flanking building
         envelopes. Landholders should consult their local native plant nursery for suitable
         species selection; and
    •    The revegetation works within the covenant areas maximises the use of low
         flammability species.
All APZ’s are required to be maintained by the individual landholder/s and or occupants and
are to consist of low threat understorey vegetation conditions (e.g., mown grass) in perpetuity.

5.7 General Property Maintenance
The undertaking of an appropriate level of property maintenance throughout the year, and in
particular prior to the fire season, can significantly reduce the severity of fire impact upon a
site. Queensland Fire and Emergency Services recommend the following general actions be
undertaken to prepare for the fire season:
Structure
    •    Clear leaves, twigs, bark and other debris from the roof and gutters.
    •    Purchase and test the effectiveness of gutter plugs.
    •    Enclose open areas under decks and floors.
    •    Install fine steel wire mesh screens on all windows, doors, vents and weep holes.
    •    Point LPG cylinder relief valves away from the house.
    •    Conduct maintenance checks on pumps, generators and water systems.
    •    Seal all gaps in external roof and wall cladding.




© 2022                                                      24

Page 32

Bushfire Hazard Assessment & Management Plan v1                               NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain



Access
    •    Display a prominent house or lot number, in case it is required in an emergency.
    •    Ensure there is adequate access to your property for fire trucks - 4 metres wide by 4
         metres high, with a turn-around area.
Vegetation
    •    Reduce vegetation loads along the access path.
    •    Mow your grass regularly.
    •    Remove excess ground fuels and combustible material (long dry grass, dead leaves
         and branches).
    •    Trim low-lying branches two metres from the ground surrounding your home.
Note the above recommendations are that of QFES and are offered herein for advisory
purposes. They have not been set as recommendations for certification purposes.




© 2022                                                      25

Page 33

Bushfire Hazard Assessment & Management Plan v1                                 NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain



6    AUSTRALIAN STANDARD 3959:2018 CONSTRUCTION OF BUILDINGS IN
     BUSHFIRE PRONE AREAS (AS 3959:2018) SETBACKS

The entire site is mapped within the Bushfire Hazard Overlay in the Noosa Plan 2020 (refer
Plate 15) and SPP Bushfire Hazard Overlay Map (refer Plate 1).




                                    Plate 15 – NC Bushfire Hazard Overlay

Building works within land which has been designated under a power of legislation as being
subject, or likely to be subject, to bushfires triggers building design assessment under AS
3959:2018 (NCC 2019).
The Standard provides minimum construction requirements for new habitable dwellings and
habitable building alterations in designated Bushfire Prone Areas. The construction
requirements are intended to improve the performance of buildings subjected to burning
debris, radiant heat or flame contact. Building works in Designated Bushfire Prone Areas must
be built to the Bushfire Attack Level (BAL) construction standard relevant to the building site
as identified by the AS 3959:2018 methodology.
Based on the setbacks provided, all future Class 1 buildings are anticipated to achieve a BAL
29 construction standard or lower. A specific BAL assessment will be required once building
plans have been progressed given the BAL relies on an accurate understanding of the final
footprint of the building within the individual building envelopes and is required to be assessed
against the active iteration of the Standard at the time of assessment.




© 2022                                                      26

Page 34

Bushfire Hazard Assessment & Management Plan v1                          NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain



7     LEGISLATION AND OVERLAYS

7.1      Noosa Plan 2020 – Natural Hazards Overlay Code
The proposed development is considered assessable development and therefore is
assessable against Table 8.2.3.3 Bushfire Hazard Area of Council’s Bushfire Overlay Code
which has been reproduced as Table 2.




© 2022                                                      27

Page 35

Bushfire Hazard Assessment & Management Plan v1                                                                                                                                                                    NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain




Table 2 – Table 8.2.3.3 Bushfire Hazard Areas – Part 8 Overlay Code Noosa Plan 2020


 PERFORMANCE OUTCOMES                                              ACCEPTABLE OUTCOMES                                                         PROPOSED SOLUTION

 Safety of people and property

 PO1                                                               AO1.1                                                                       This Bushfire Hazard Assessment and Management Plan has been prepared to
 Development maintains the safety of people and                    Development which will materially increase the number of people             maintain the safety of people and property from the adverse impacts of bushfire.
 property from the adverse impacts of bushfire.                    living or congregating on premises, including reconfiguring a lot, is not
                                                                                                                                               AO1.1 –The proposed building envelopes and APZ’s are located outside of the
                                                                   located within a medium or high bushfire hazard area.
                                                                                                                                               mapped Medium Potential Bushfire Intensity Area’s as depicted on the Local
                                                                                                                                               Hazard Area Map BF03.
                                                                   AO1.2
                                                                   Development maximises setbacks from hazardous vegetation to                 AO1.2 – The development has provided minimum setbacks between the
                                                                   achieve an acceptable risk.                                                 proposed building envelopes and hazardous vegetation to achieve the SPP
                                                                                                                                               Assessment Benchmark 4 criteria of <29kW/m2 radiant heat flux exposure. This
                                                                   Editor’s Note —PSP8 Natural Hazards provides guidance for                   setback achieves an acceptable risk where all the mitigation measures detailed
                                                                   assessing bushfire hazard risk and preparing a bushfire hazard              within this report are employed.
                                                                   management plan.


 Impact on Ecologically Important Areas

 PO2                                                  No acceptable outcome provided                                                           No clearing of vegetation for bushfire mitigation measures is required. The
 Bushfire mitigation measures do not adversely impact                                                                                          bushfire mitigation measures prescribed herein will not adversely impact on
 on:                                                                                                                                           biodiversity values, connectivity, ecosystem functioning, and the long-term
                                                                                                                                               physical integrity of waterways, wetlands and areas of native vegetation.
 a) biodiversity values, connectivity and ecosystem
 functioning; and
 b) the long term physical integrity of waterways, wetland
 and areas of native vegetation.

 Water Supply for Fire Fighting Purposes

 PO3                                                        AO3.1                                                                              AO3.1 – No reticulated water is currently available to the site. The water supply
 Development provides an adequate water supply for Premises are connected to the reticulated water supply.                                     requirements of SPP Assessment Benchmark 4 prevails; 10,000KL, and can be
 firefighting purpose which is reliable, safely located and                                                                                    conditioned with an approval.
 freely accessible.                                         Editor's note—For reconfiguring a lot, water supply needs to provide
                                                                                                                                               Note, the reliance upon dams or pools for water storage is not an acceptable
                                                            for a minimum flow and pressure of 10 litres a second at 200kPa at all
                                                                                                                                               solution under the SPP.
                                                            times for firefighting purposes.

                                                                   OR

                                                                   AO3.2
                                                                   Where there is no available reticulated water supply, the premises
                                                                   has:

                                                                   a) an accessible dam, swimming pool or water tank available for
                                                                   firefighting purposes with an onsite water volume of not less than
                                                                   5,000 litres; and
                                                                   b) a water supply outlet pipe 50 millimetres in diameter fitted with a
                                                                   standard fire brigade fitting connected to the water supply (other than
                                                                   where the water supply is in a swimming pool or dam).




© 2022                                                                                                              28

Page 36

Bushfire Hazard Assessment & Management Plan v1                                                                                                                                                               NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain




 PERFORMANCE OUTCOMES                                              ACCEPTABLE OUTCOMES                                                       PROPOSED SOLUTION

                                                                   Editor’s Note—Water supply capacity for firefighting purposes is in
                                                                   addition to water supply capacity for other uses and activities on the
                                                                   premises.

 Essential Community Infrastructure

 PO4                                                       AO4.1                                                                             N/A - The proposed development does not involve essential community
 Essential community infrastructure is able to function Development involving essential community infrastructure is not                      infrastructure.
 effectively during and immediately after bushfire events. located within a medium or high bushfire hazard area.

                                                                   OR

                                                                   AO4.2
                                                                   Where located in a medium or high bushfire hazard area,
                                                                   development involving essential community infrastructure is designed
                                                                   to function effectively during and after a bushfire event in accordance
                                                                   with a Bushfire Hazard Management Plan.

                                                                   Editor’s Note— PSP8 Natural Hazardshttps://noo-prod-
                                                                   icon.saas.t1cloud.com/Pages/Plan/Book.aspx?hid=9256
                                                                   provides guidance for assessing bushfire hazard risk and preparing a
                                                                   bushfire hazard management plan.




 Hazardous Material

 PO5                                                               AO5                                                             AO5 - The proposed development does not involve the manufacture or storage
 Public safety and the environment are not adversely               Hazardous materials are not manufactured or stored in bulk in a of hazardous materials in bulk.
 affected by the impacts of bushfire on hazardous                  bushfire hazard area.
 materials manufacturing or storing in bulk.

 Access and Evacuation Routes

 PO6                                                     AO6.1                                                                               PO6 - The road design, in conjunction with the recommendations set herein
 Roads provide for easy and safe evacuation of residents The road layout provides for through-roads and avoids cul-de-sacs                   (refer sections 5.5) is considered to provide for easy and safe evacuation of
 of premises and access by emergency services.           and dead-end roads.                                                                 residents and access by emergency services.
                                                         OR
                                                         AO6.2
                                                         The development has a perimeter road reserve with a minimum width
                                                         of 20 metres and maximum gradient of 12.5%.
                                                         OR
                                                         AO6.3
                                                         Cul-de-sacs or no-through roads are provided with fire trails or access
                                                         easements, which are capable of being navigated by conventional
                                                         vehicles and which link to through roads.
                                                         AO6.4
                                                         Safe access and egress is available at all times to all of the
                                                         development for emergency vehicles and personnel.




© 2022                                                                                                              29

Page 37

Bushfire Hazard Assessment & Management Plan v1                                                                                                                                                                      NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain




 PERFORMANCE OUTCOMES                                              ACCEPTABLE OUTCOMES                                                         PROPOSED SOLUTION
                                                                   AO6.5
                                                                   Where an emergency access point is required, it complies with the
                                                                   relevant works codes and PSP6 Engineering Design Standards.

 Lot design

 PO7                                                      AO7                                                                                  AO7-
 Lot design and building siting minimises bushfire hazard Each residential lot:
                                                                                                                                               a) BLE’s are identified on the plan.
 risk to people and property.                             a) includes a building envelope, identified on a plan of subdivision;
                                                                                                                                               b) Both the proposed Lot 1 western BLE and Lot 2 BLE are located directly
                                                                   b) is of sufficient size and shape to allow for efficient emergency
                                                                                                                                               adjacent to Black Mountain Range Road allowing for short and direct access for
                                                                   access to buildings for firefighting appliances (e.g. by avoiding battle-
                                                                                                                                               emergency personnel. Proposed Lot 1’s eastern BLE is located approximately
                                                                   axe/hatchet lots and long narrow lots with long access driveways to
                                                                                                                                               350m from Black Mountain Range Road via a long driveway. However, as the
                                                                   buildings);
                                                                                                                                               proposed BLE and majority of the proposed driveway is located within a Low
                                                                   c) where more than 2500m², achieves setbacks from hazardous                 Potential bushfire intensity area and the driveway will achieve a gradient of
                                                                   vegetation in line with Bushfire Attack Level 29 requirements as per        <12.5% the proposed access to the Lot 1 eastern BLE is considered acceptable.
                                                                   AS3959; and
                                                                                                                                               c) All proposed Lots achieve setbacks from hazardous vegetation which are
                                                                   d) is designed so that buildings and structures are sited in locations of   expected to secure a Bushfire Attack Level 29 or lower construction requirement
                                                                   lowest hazard within the lot and elements of the development least          under AS3959.
                                                                   susceptible to fire are closest to the fire hazard.
                                                                                                                                               d) All of the proposed BLEs are separated from the adjacent bushland hazard
                                                                                                                                               by low threat areas (i.e., Black Mountain Range Road corridor to the west).

 Firebreaks and fire access tracks

 PO8                                                               AO8.1                                                                       AO8.2 – Given the proposed Lots satisfy the Assessment Benchmark 4 criteria,
 Firebreaks and fire access tracks provide:                        Where development involves the creation of a new road and lots, a           the high density of Low Potential Bushfire Intensity Areas surrounding the site,
                                                                   firebreak is provided by providing a cleared road reserve not less than     and as the immediately adjacent hazardous bushland interface can be readily
                                                                   20 metres wide and maximum gradient of 12.5% around the perimeter           accessible by emergency services from Black Mountain Range Road corridor,
 a) adequate access for firefighting and other
                                                                   of the subdivision, between the created lots and surrounding                the provision of additional fire break trails within the site is deemed unnecessary
 emergency vehicles; and
                                                                   vegetated lands.
                                                                                                                                               Therefore, no formal firebreak trails are deemed practicable or necessary in
 b) adequate access for the evacuation of residents and            OR
                                                                                                                                               this instance.
 emergency personnel in an emergency situation.                    AO8.2
                                                                   Fire access tracks are provided between the created lots and                AO8.3 – All bushfire management measures prescribed herein would be
                                                                   surrounding vegetated land that:                                            carried out on the subject property and not rely upon any adjoining property.
                                                                   a) have a cleared minimum width of 6 metres;
                                                                   b) have a maximum gradient of 12.5%;
                                                                   c) provide unbroken access for fire fighting vehicles;
                                                                   d) provide passing bays and turning areas;
                                                                   e) are located within an access easement that is granted in favour of
                                                                   Noosa Council and the Queensland Fire and Rescue Service.
                                                                   AO8.3
                                                                   Bushfire management measures are carried out on the subject
                                                                   property and not any adjoining property.




© 2022                                                                                                               30

Page 38

Bushfire Hazard Assessment & Management Plan v1                                           NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain




7.2 State Planning Policy – Natural Hazards, Risk and Resilience
The Department of State Development, Manufacturing, Infrastructure and Planning’s State Planning
Policy – State interest guidance material – Natural hazards, risk and resilience – Bushfire (December
2019) contains the development assessment benchmarks for natural hazards, risk and resilience -
bushfire. The SPP assessment benchmarks prevail over those prescribed in the Noosa Plan Natural
Hazards Overlay Code where they involve the same design elements. An assessment of the
proposed development’s compliance with each of the assessment benchmarks has been provided
below.
Assessment Benchmark 4
To ensure emergency services can respond effectively, development is located within a reticulated
water supply area or includes a dedicated static water supply that is available solely for fire-fighting
purposes and can be accessed by fire-fighting vehicles.
Reticulated water supply is not available to the site hence a dedicated static water supply of 10,000L
for each future dwelling is recommended as per the SPP Bushfire 2019 water supply guidance
material recommendations.
Where reconfiguring a lot creating lots of greater than 2000 square metres
To ensure emergency access and operational space for firefighters, include a development footprint
plan that is separated from the closest edge of the adjacent mapped medium, high or very high
potential bushfire intensity area by a distance that achieves a radiant heat flux level of 29 kilowatt
per square metre or less.
To facilitate safe evacuation during a bushfire event, include a development footprint plan that is
located within 60 metres of the street frontage and sited to enable a route between the development
footprint plan and the street frontage with a gradient that does not exceed of 12.5 per cent.
All of the proposed BLE’s are provided with enough separation to achieve <29 kW/m² radiant heat
flux hence satisfying the Assessment Benchmark 4 <29 kW/m² criteria.
The proposed Lot 2 building envelope and proposed Lot 1 western building envelope will gain access
via short driveways (i.e., 10-20m) connecting directly to Black Mountain Range Road to the west of
the site. Proposed Lot 1’s eastern building envelope will gain access via a long driveway (approx.
350m) connecting to Black Mountain Range Road to the west of the site. However, as the driveway
for its majority will be located within the identified Low Potential Bushfire Intensity Area, the length is
considered acceptable.
All of the proposed access driveways are bordered by low threat conditions (i.e., VHC 40.4 or VHC
3.1) on either side and hence the chance of access/egress becoming constrained within a bushfire
event is deemed low. All new driveways are expected to achieve a <12.5% grade.
It is recommended all new driveways and access easements are built to a minimum of 3.5m width
with 4.8m vertical clearance in accordance the QLD Fire Hydrant and Vehicle Access Guidelines
2019.
Lot 1’s driveway is to provide a dedicated turning area at its terminus at the eastern building
envelope/dwelling, or near to, for a QFES medium rigid vehicle in accordance the QLD Fire Hydrant
and Vehicle Access Guidelines 2019.
Where reconfiguring a lot creating additional lots for the purpose of residential development and a
reticulated water supply is not provided (fire trails).
To ensure safe access and egress and operational space for rural fire-fighting vehicles, a fire trail
and working area is provided that separates the new residential lot or development footprint plans
from adjacent mapped medium, high or very high potential bushfire intensity and is designed and
constructed in accordance with the design parameters in Table 4.
Given the proposed Lots satisfy the Assessment Benchmark 4 criteria and the high density of Low
Potential Bushfire Intensity Areas surrounding the site, and as the immediately adjacent hazardous
bushland interface can be readily accessible by emergency services from Black Mountain Range
Road corridor, the provision of additional fire break trails within the site is deemed unnecessary



© 2022                                                   31

Page 39

Bushfire Hazard Assessment & Management Plan v1                                      NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain




Therefore, no formal firebreak trails are deemed practicable or necessary.
Assessment Benchmark 5
Where reconfiguring a lot.
Subdivision design avoids locating lots (or for lots greater than 2000 square metres, avoids locating
the development footprint plan) that are within bushfire prone areas and on ridgelines, saddles and
crests where slopes exceed 15 per cent.
All of the proposed Lots are >2000m² and the proposed building envelopes are positioned on slopes
of <15%.
Assessment Benchmark 7
Where a requirement for an asset protection zone (or similar) exists
Landscaping treatments comprise only low threat vegetation, including grassland managed in a
minimal fuel condition, maintained lawns, golf courses, maintained public reserves and parklands,
vineyards, orchards, cultivated gardens, commercial nurseries, nature strips and windbreaks.
OR
Landscaping management maintains a potential available fuel load which is less than eight
tonnes/hectare in aggregate, and fuel structure which is discontinuous.
OR
Development includes a bushfire management plan for the maintenance of any identified asset
protection zone, including landscape design and ongoing vegetation management.
This document includes a Bushfire Management Plan.




© 2022                                                   32

Page 40

Bushfire Hazard Assessment & Management Plan v1                                NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain




8     CONCLUSIONS

This Bushfire Hazard Assessment and Management Plan has been prepared to assess and
manage the degree of potential bushfire risk acting on the proposed 1 into 2 Reconfiguration
of a Lot development application for 96 Black Mountain Range Road, Black Mountain.
A Local Hazard Map has been prepared for the site consistent with the State Planning Policy
– Natural Hazards, Risk and Resilience – Technical Manual – A ‘fit for purpose’ approach in
undertaking natural hazard studies and risk assessments. The Local Hazard Map has
identified that Medium Potential Bushfire Intensity areas are located offsite to the northwest,
south, and west. Proposed Lot 2’s and Lot 1’s western building envelopes and will be
positioned in a Potential Impact Buffer whilst proposed Lot 1’s eastern building envelope is
located within a Low Potential Bushfire Intensity Area.
A bushfire risk assessment has been undertaken in general accordance with AS/NZS ISO
31000:2018 – Risk Management Methodology. The risk assessment identified that each
proposed Lot achieves an Acceptable risk of radiant heat impact to the future dwellings.
Overall, the development proposed for the site, in combination with recommendations
referenced herein, is deemed suitable with respect to providing a reasonable level of
protection for people and property within the site.
Bushfire is an extremely serious and often unpredictable phenomenon that requires serious
preparatory planning and decision making to avoid potential damage to infrastructure and or
loss of life. All recommendations made herein have been formulated based on site conditions
at the time of writing and therefore may not be appropriate in the event site conditions change
over time.
Implementation of the bushfire mitigation measures referenced herein is not implied nor
intended to advocate that residents remain on the site during a bushfire event nor that people
and property will be protected from bushfire impact. The measures are intended to reduce
the potential severity of bushfire impact to persons and property and not prevent actual
bushfire impact.
The landowners and site managers are to be responsible for ensuring the measures
prescribed herein are applied and stay up to date with site conditions and industry standards.
Landholders/managers should therefore liaise with Queensland Fire and Rescue Services at
regular intervals (e.g., recommended at least every 5 years).
The first call in the event of a bushfire emergency should always be ‘000’.
8.1       Certification Matters
The following bushfire mitigation measures are to be certified as satisfactorily completed by
the project Bushfire Consultant prior to commencement of the proposed/approved uses on the
site:
      •    All actionable recommendations set in Section 5 of this report have been implemented
           (i.e., establishment of APZs, landscaping etc.) where practical at the time of
           certification.




© 2022                                                   33

Page 41

Bushfire Hazard Assessment & Management Plan v1                             NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain


9    REFERENCES

Cruz M.G., Gould J.S., Alexander M.E., Sullivan A.L., McCaw W.L., Matthews S. (2015) A
Guide to Rate of Fire Spread Models for Australian Vegetation. CSIRO Land and Water
Flagship, Canberra, ACT, and AFAC, Melbourne, Vic, 123pp.
Gould, McCaw, Cheney, Ellis & Matthews. (2007). Field Guide – Fuel assessment and fire
behaviour in dry eucalypt open forest. Ensis-CSIRO, Canberra, ACT and Department of
Environment and Conservation, Perth, WA.
Leonard, J., Opie, K. (2017). Estimating the potential bushfire hazard of vegetation patches
and corridors. An enhancement of Queensland’s methodology for State-wide mapping of
bushfire prone areas. CSIRO Land & Water, Australia.
Noosa Planning Scheme (2006). Bushfire Hazard Overlay Code. Noosa Council.
Queensland Fire and Emergency Services. (2019). Bushfire Resilient Communities -
Technical Reference Guide for the State Planning Policy - State Interest Guideline - Natural
Hazards, Risk and Resilience 2- Bushfire.
Southeast Queensland Fire and Biodiversity Consortium – Operational Manual.
The State of Queensland, Department of State Development, Manufacturing, Infrastructure
and Planning (2019). Natural hazards, risk and resilience - Bushfire State Planning Policy –
state interest guidance material.
Webster. (2002). The Complete Bushfire Safety Book. Random House (Aust) Pty Ltd.




© 2022                                                   34

Page 42

Bushfire Hazard Assessment & Management Plan v1                    NCES REF: J001050
Lot 3 on RP131369 – 96 Black Mountain Range Road, Black Mountain


APPENDIX 1 – SITE LAYOUT




© 2022                                                   35

Page 43

                                                               BSP326083
                                                                                             2SP326083




                                                                                                                                                                              1SP326083

                                                                                                                                                                                                                     CSP326083
                                                               ASP326083
                                                         10
                                  d
                                eR




                                                                                                        10
                                                                             98.3
                         g
                      an




                                                                  BLE Lot 1
                                          .9
                    nR




                                                                                               22.1
                                                    50
                                      72




                                                                    3574m²                                                                                     418.6
                                                                                                                                                        1
                    i
                 nta




                                                                    119.3
                                                                                                                                                    1.882ha
                                                                                                                                                    1.882ha
             u




                                                                                                                                                                            30
          Mo


                                10




                                                                                                                                                                                                                                                                                 .5




                                                                                                                                                                                                           30
                                                                  (127) 101.4                                                                                                                                                                                                  13




                                                                                                                                                                                                                10
                         9.2                                                                                                        147.5
                                                10




                                                                                                                                                                                                                                                                       10
      ck




                                     17.9                                                                                                                                                                                              86
                                                                                                                                                                                                                          4 9 .8
   Bla




                                                                                                                                                                                                                                                 BLE Lot 1
                                                     28




                           3.4                 5                                                                                                                                             74
                                      17.4




                                                                                                                                                                                                                                                                                                                       111.6




                                                                                                                                                                                                                                                                  2
                                                                                                                                                                                                                                            2117m²




                                                                                                                                                                                                                                                                 28.
                                                                                                                                                                                                                                                                                                     .9
               .1




                         BLE Lot 2                                                                                                                                                                                                                                                                 17
            56




                                                                                                                                                                                                                                                                            38
                                                                                                                                                                                                                      4 8 .6
                                                                                                                                                        2




                                                                                                                                                                                                                                            10
                                                                                                                                                                                                                                                          58.




                                                                                                                                                                                                                                                                              .6
          10                                                                                                                                                                                                                                                      1
                                                    17
                    .2




                                                                                                                                                                                     Cov A
                 34




                                             18.5




                            862m²
                                                                                                                                                                                                                                                                                        .8
                                                                                                                                                                                                                                                                                   10         10
                         33.9                                                                                                                    4.754ha                            4.501ha                                                            62.
                                                          21
                                     10




                                                                                                                                                                                                                                                             9




                                                                                                                                                                                                                                                                               10
                                                                                                                                                                                                                                                                                                  .9
                                                                                                                                                                                                                                                                                             26




                                                                                                                                                                                                                                                                                                                                    119.7
                                                                                                                                                             (578)
                                                                                                                                                                              503




                                                                                                                                                          36RP897845




                                                                                                                                                                                                                                                                                                                   LEGEND

                                                                                                                                                                                                                                                                                                                    Proposed Lot Boundary
                                                                                                               Tallowood Pl                                                                                                                                                                                         Proposed Covenant Boundary
                                                                                                                                                                                                                                                                                                                    Offset Dist
                                                                                                                                                                                                                                                                                                                    Position of Watercourse
                                                                                                                                                                                                                                                                                                                    Noosa Plan Overlay


                                                                                                                                                                                                                                                                                                          Proposed Building Location Envelope
                                                                                                              20RP897845                                21RP897845
                                                                                                                                                                                                                                   23RP897845
                                                                                                                                                                                              22RP897845
 Notes.                                                                                                                                                                                                                                                                                                   Proposed Vegetation Covenant
 1. Boundaries are compiled from RP131369 and have not been surveyed in the preparation
    of this plan. Areas and dimensions may therefore vary on survey.

Client:                                                                             Horizontal Datum:                                 Drawing Number:                                                                  Surveyed/Checked:         N/A
                      BRETT HAGE                                                                             MGA 56 vide RTK CORS
                                                                                                                                                                        218806-02-02                                                                                                                                 103 Wrigley St (Cnr Sugar Rd)
                                                                                                                                                                                                                                                                                                                     PO Box 5774
                                                                                    Vertical Datum:          N/A                                                         Sheet no.1 of 1 sheets.                       Drawn/Checked:            JPG                                                                 MAROOCHYDORE BC QLD 4558
Drawing Title:
                                          PROPOSAL PLAN                             Co-Consultants:                                   Rev    Date         Description                                                  Date:                     25/05/2022                                                          (P) 07 5479 5311
                                                                                                                                                                                                                                                                                                                     (E) [email protected]
Site Description:     Reconfiguration of Lot 3 on RP131369 into 2 Lots                      North Coast Environmental Services                                                                                         Scale:                    1:1500 at A3                                                        (W) www.cadcon.com.au
                      at 96 Black Mountain Range Rd,                                        Alta Projects (Consulting Engineers)                                                                                 0                                50                                ACN 098 201 828 Part of CadCon International Pty Ltd
                      BLACK MOUNTAIN

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.