¿ play your part - print on recycled paper 5m 4 3 2 1
A B C
J 7
H
1 2 3 4 5 6
Swimming pool and spa to be in accordance with engineers design and detail. All
pool construction to be in accordance with manufacturers/installers specifications.
950 3,750 2,030
Pool to have suitable pumps located in pool plant store in accordance with
manufacturers/installers specifications. Provide pool fence to be in accordance with
ABCB Housing 3,
94
Provisions Standard 2022, the Building Act 1993, Building Regulation 2006, AS 0
1926. Pool fence to be min. 1200mm high above adjoining finished surface level and
have 900mm non climbing zone as specified in pool legislation. Pool to have
structural acrylic wall to be in accordance with structural engineers and specialist
95
manufacturers design and detail. Pool to be finished with Cemher Provide Cemher 0
Microdur® (Micro Cement render) system : Colour : Organic.
I
2,950
3,167
E E
3,291
3,600
3,600
5,435
Pool plant
Epoxy
ref
bench
D dw
D
rwp
Concrete block retaining wall to be in accordance with structural engineers design s
and detail. Provide Soprema Colphene BWS water proofing system to entire ref
basement installed in accordance with manufacturers specifications.
Basement garage Cinema Lounge
Epoxy conc Tile
Contiguous concrete piles to be installed in accordance with
structural engineers design and detail. Bar
Tile
G G
Concrete block retaining wall to be in accordance with structural engineers design
and detail. Provide Soprema Colphene BWS water proofing system to entire
10,946
10,946
basement installed in accordance with manufacturers specifications. up
Car turntable
Concrete block wall to be in accordance with structural
5
W2
engineers design and detail. Provide Crackenback stone
4.8m car turntable (CTX48-PR Turntable by Australian Turntables) to be installed in facing by Eco outdoor.
accordance with manufacturers specifications. Slab to be rebated in accordance
6
D2
with structural engineers design and detail. 2,950 J
F F
A1 24
W up 17R(169 mm)
16G(275 mm)
Lobby
Tile
Stormtech 100mm 316 s/s driveway grated drains to be in up
accordance with hydraulic engineers design and detail. Gym
Tile
Drainage channel D27
E C D25 Concrete block retaining wall to be in accordance with
C E
sauna
b
structural engineers design and detail. Provide Soprema
2,000
2,000
rwp Colphene BWS water proofing system to entire basement
190 3,560 190
wc
Lift Bathroom installed in accordance with manufacturers specifications.
Knotwood (Light Oak) battens on garage door frame with 25 x 25mm sections ECOTRAK
D28
(15mm gap) with 3.0mm Powder coated aluminium composite sheeting. Door to Series 3 Tile
B B
(1C8)
have segmented panels to slide horizontally along side boundary wall and to be
fixed in accordance with manufacturers specifications.
2,
95
Concrete driveway to be in accordance structural engineers design and detail. 7 I Contiguous concrete piles to be installed in accordance
Provide selected exposed aggregate blend to manufacturers specifications. with structural engineers design and detail.
Driveway to comply with AS2890.1. Driveway to connect to existing crossover in
accordance with local authority regulations. Driveway grades to be in accordance
with AS2890.1. Driveway to be have clear slip resistant clear penetrating sealer to Formed concrete spiral stairs to be in accordance with
entire driveway, applied in accordance with manufacturers specifications. ck li ne 6m structural engineers design and detail. Stairs to be in
etba s et
6m s bac
6,244
6,244
k lin accordance with ABCB Housing Provisions Standard 2022
e
: 11.2 Provide timber framed wall/plasterboard sheeting to
7,06
Flood form balustrade. Rebated handrail to comply with ABCB
barrie
r/cha Housing Provisions Standard 2022 : 11.3. Balustrade and
55
4
nnel
exposed stairs surface to be finished with Cemher
6,2
Microdur® (Micro Cement render) system : Colour :
Flow Defence Passive flood barrier to be installed in
Truffle. Stair tread and risers to have selected slip resistant
accordance with manufacturers specifications. D tiles to match floor. D
Selected floor tiles to be installed over non-shrink grout bedding. Floor tiles to be A A
installed with flexible adhesive and provide fall to waste outlet. Suspended slab to 3,
have setdown for wet area to allow for tile bedding layer to achieve fall. Floor to 94 Concrete block walls to form lift shaft to be in accordance
0 with structural engineers design and detail. Lift shaft to suit
have Emer-proof waterproofing barrier installed to entire floor and wall junctions in
accordance with NCC 3.8.1. Tile adhesive to be in accordance with water proofing Lift ECOTRAK Series 3 by Easy Living Elevators (1C8)
manufacturers specifications.
95
0
7
5 6
950 3,750 2,030
H
1 2 3 4
Floor plan - Basement
1:100 A B C
/Users/benthornton/Documents/Cadfiles/2401 - Palazzesi/Archicad/
19062024/2401.pln
sbt designs pty ltd t/a
Skale Building Design project Residence lot no. 145 DA05 Development applicaiton issue 19/6/2024
project number
Mobile: 0412 025 657
for Ross Palazzesi plan no. N21859 DA04 Develoment application issue 23/4/2024
2401
skale
DA03 Develoment application issue 14/4/2024
skale.com.au 38 Mossman Court drawn BT
DA02 Develoment application issue 5/3/2024
drawing number
building design
[email protected]
A.C.N. 123 976 296 QBCC: 1143 609 at Noosa Sound scale (A2) 1:100 Rev Details Date 02 DA05 © Skale Building Design
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.