APPENDIXD NOOSA PLAN 2020 ASSESSMENT

 

 
Log in to download the original file

Appendix D - Noosa Plan 2020 Assessment.pdf · 4.5 MB (large file)

The download may take up to a minute.

Full text of the other 46 pages

Page 2

6.3.2. MEDIUM DENSITY RESIDENTIAL ZONE CODE
Table 6.3.2.3 Criteria for assessment

 Performance Outcomes                Acceptable Outcomes                Response

 Role and function

 PO3                                 AO3.1                              Not Applicable

 A secondary dwelling may create     No more than one secondary         The proposed development does
 permanent housing for an            dwelling is provided on any site   not involve a secondary dwelling.
 extended family member or other     regardless of site area.
 member of the household
 resident in the dwelling house      AO3.2                              Not Applicable
 while protecting the character of   A secondary dwelling:              The proposed development does
 the site and the zone.                                                 not involve a secondary dwelling.
                                         a) has a maximum gross
                                            floor area of 65m²;

                                         b) has no more than two
                                            bedrooms; and

                                         c) does not occur on any
                                            property covered by a
                                            Building Unit Plan.

 Built Form

 Building Height

 PO8                                 AO8.1                              AO8.1 Complies

 Buildings and structures:           Buildings and structures are no    The development has a
                                     more than 8 metres in building     maximum building height of
     a) are low rise and present
                                     height; and                        7.1m.
        a building height
        consistent with              AO8.2                              AO8.2 Complies
        structures on adjoining
        and surrounding              Where excavation is required,      The development does not
        premises;                    the maximum portion of the         exceed 8m in building height
                                     exposed external façade of the     from the exposed external
     b) are designed to provide      building cannot exceed 8m in       façade.
        an interesting               building height.
        streetscape and                                                 Please refer to the Architectural
        complement landform          Editor's note - refer to figure    Plans (Appendix E) for further
        changes and landscapes       AP3-13A                            details.

     c) do not visually dominate     Alternative provision to the
        the street or surrounding    QDC
        area;




Medium Density Residential Zone Code

Page 3

 Performance Outcomes                Acceptable Outcomes                 Response

     d) maintain a vegetated
        skyline;

     e) do not unreasonably
        obscure views or lead to
        overshadowing of
        neighbouring properties;

     f)   do not exceed two
          storeys.

 Site Cover

 PO10                                AO10                                AO10 Complies

 Site cover of development:          For a dwelling house, site cover    The development has a site
                                     does not exceed 40% of the site     cover of 37.6%.
     a) does not exceed 40% of
                                     area.
        the site area; or
                                     Alternative provision to the
     b) for small dwellings or for
                                     QDC
        development which
        provides a ratio of at
        least three small
        dwellings to one other
        dwelling, does not
        exceed 45% of the site
        area.

 Plot Ratio

 PO11                                AO11                                AO11 Complies

 Plot ratio of development:          For a dwelling house, plot ration   The development comprises a
                                     of development does not exceed      plot ratio of 0.4:1.
     a) does not exceed 0.4:1;
                                     0.4:1
        or

     b) for small dwellings or for
        development which
        provides a ratio of at
        least three small
        dwellings to one other
        dwelling, does not
        exceed 0.5:1.

 Building Setback

 PO12                                AO12.1                              AO12.1 Complies

 Buildings and structures are                                            Ground:
 designed to:
                                                                         Front:




Medium Density Residential Zone Code                                                                   2

Page 4

 Performance Outcomes               Acceptable Outcomes                  Response

    a) provide a high level of      Buildings and structures meet the    ▪   10.672m
       amenity to users of the      following minimum boundary
       subject site and adjoining   setbacks:                            Side:
       premises, including                                               ▪   2.005m (east boundary); and
                                        a) for frontages — 6 metres
       provision of visual and
       acoustic privacy;                b) for side boundaries—          ▪   1.5 (western boundary).

    b) not unreasonably                      (i) 1.5 metres setback up   Rear:
       obstruct views or cause               to 4.5 metres height;
       overlooking of private                                            ▪   7m
       open space or habitable               (ii) 2 metres setback
                                             between 4.5 metres and      Level 1:
       areas of adjoining
       premises;                             7.5 metres height; and      Front:

    c) provide adequate                      iii) 2.5 metres where       ▪   7.2m
       distance from adjoining               above 7.5 metres height
       land uses;                                                        Side:
                                        c) for the rear boundary - 6
    d) preserve existing                   metres                        ▪   2.005m (east boundary)
       vegetation that will help
                                                                         ▪   1.5m (west boundary) to
       buffer development;
                                                                             3.65m in height and 2.5m
    e) allow for space and                                                   above 3.65m in height
       landscaping to be
                                                                         Rear:
       provided between
       buildings including                                               7.782m
       adequate area at ground
       level for landscaping with   AO12.2                               AO12.2 Complies
       trees, shrubs, outdoor
                                    The front 6 metres of the            The development provides a
       living and utilities;
                                    property is landscaped open          varying front set back areas of
    f)   be consistent with the     space, provided that uncovered       approximately 10.672m.
         predominant character of   visitor parking, or swimming
                                                                         The development provides a
         the surrounding area;      pools protruding no more than 1
                                                                         landscaped front court as well as
         and                        metre above the ground level,
                                                                         pedestrian entrance
                                    can be as close as 2 metres from
    g) protect the natural                                               embellishments within the first
                                    the front boundary.
       character and avoid                                               6m of the property.
       adverse impacts on
       ecologically important       AO12.4                               Not Applicable
       areas such as national       Buildings and structures on          The site is not identified on
       parks, waterways and         premises with frontage to the        Figure AP3-15A.
       wetlands.                    Noosa River system are set back
                                    not less than 10 metres from
                                    mean high water spring as
                                    shown in Figure AP3-15A.

 Setback to a watercourse in the Noosa Waters estate, Noosaville

 PO13                               AO13                                 Not Applicable




Medium Density Residential Zone Code                                                                         3

Page 5

 Performance Outcomes                 Acceptable Outcomes                  Response

 Land adjoining the revetment         For premises adjoining a             The site is not located in the
 wall and for a width of 4.5 metres   watercourse within the Noosa         Noosa Water estate.
 serves flood detention and           Waters estate no building work,
 amenity functions, free of           filling or excavation works occurs
 structures and impervious            within 4.5 metres from the centre
 surfaces.                            line of the top of the concrete
                                      revetment wall.

                                      Editor's note refer to figure
                                      6.3.1.5

                                      Alternative provision to the
                                      QDC

 Streetscape

 PO14                                 AO14.5                               AO14.5 Complies

 Development:                         For a dwelling house,                The development achieves a 3m
                                      development provides visual          distance between the ground and
   a) contributes positively to
                                      interest to the street and the       the lowest suspended floor at the
      the locality;
                                      surrounding area through:            south-western corner which is
   b) addresses and enhances                                               the point where the distance is
                                        a) limiting the vertical
      the streetscape by                                                   the greatest over the site.
                                           distance between the
      incorporating articulation
                                           ground and the lowest           The development provides a
      and individual design
                                           suspended floor to no           maximum length of any external
      elements that add visual
                                           more than 3 metres;             wall on a single plane of 8.5m.
      interest to the
      development;                      b) limiting the length of any      The design incorporates a variety
                                           external wall in one plane      of embellishments to create
   c) has a form and
                                           to 15 metres; and               variation in the built form
      architectural scale that
                                                                           including windows, balconies and
      does not dominate the             a) ensuring each external
                                                                           awnings.
      streetscape or the                   wall includes at least one
      surrounding properties;              design element such as
                                           verandahs, external stairs,
   d) does not detract from the
                                           window openings,
      visual amenity of adjoining
                                           awnings or porches.
      properties through the
      impact on views, access
      to sunlight or overlooking;

   e) takes the form of small
      separate buildings, rather
      than large single bulky
      development; and

   f)   sits within a landscaped
        setting.




Medium Density Residential Zone Code                                                                           4

Page 6

 Performance Outcomes               Acceptable Outcomes                   Response

 Garage and Carports


 PO15                               AO15.1                                Not Applicable

 Garages, garage doors and          Garage doors that face the street     The development includes a
 carports do not dominate the       are no more than 6 metres in          basement level.
 street or the building design.     width or 50% of the frontage,
                                                                          The design of the basement door
                                    whichever is the lesser.
                                                                          is appropriate for the site and
                                    AO15.2                                achieves a consistent design
                                                                          commensurate with the overall
                                    Where multiple garages face the       development.
                                    street, they are separated by a
                                    minimum of 2 metres or are
                                    staggered in setback by a
                                    minimum of 1 metre.

                                    AO15.3

                                    Garages that are visible from the
                                    street, but do not face the street,
                                    include a landscaped setback to
                                    the street and provide
                                    articulation, windows or a mix of
                                    materials to provide interest to
                                    the garage facade.

 Basements


 PO16                               AO16                                  AO16 Complies

 Basements:                         Basements:                            •   1 access of 4m wide

   a) visually integrate with the      a) are limited to one access       Setbacks:
      building;                           a maximum of 6 metres
                                          wide; and                       Front:
   b) do not dominate the street
      or building design;              b) do not encroach into            •   7.292m
                                          building setback areas.
   c) are screened through                                                Side:
      landscaping; and              Editor's note— refer to Figure
                                                                          •   2.005m (eastern boundary)
                                    6.9.2
   d) do not present as a storey
                                                                          •   1.5m (western boundary)
      to the street.
                                                                          Rear:

                                                                          •   9.04m

 Front Fences and Walls

 PO17                               AO17.1                                AO17.1 Complies




Medium Density Residential Zone Code                                                                        5

Page 7

 Performance Outcomes                Acceptable Outcomes                    Response

 Front fences and walls are          Front fences or walls are set          The development provides front
 designed and sited to:              back an average of 1 metre and         fence elements that are setback
                                     are articulated to provide visual      at a distance of 1m and provide
   a) contribute to the
                                     interest by stepping the design at     articulation to the Noosa Parade
      attractiveness of the
                                     a maximum of 5 metre intervals.        frontage comprising a visually
      streetscape;
                                                                            interesting streetscape.
   b) be compatible with the
                                     AO17.2                                 Not Applicable
      existing streetscape
      character;                     Where located on the boundary:         See below AO17.3
   c) avoid interference with           a) the solid portion of front
      movement of surface                  fences and walls is no
      stormwater;                          more than 1.2 metres
                                           high; or
   d) allow for casual
      surveillance of the street;       b) the walls contain openings
                                           or materials that ensure it
   e) provide planting in front of
                                           is 50% transparent and
      solid fences and walls;
                                           has a height not
      and
                                           exceeding 1.8 metres.
   f)   ensure plantings between
        the front fence and the      AO17.3                                 AO17.3 Complies
        footpath does not create     Solid front fences and walls may       The development site benefits
        an impediment for
                                     be 1.8 metres in height if the         from a frontage to Noosa Parade,
        pedestrians using the
                                     property has frontage to an            which is a Distributor Road.
        footpath.
                                     arterial road or a distributor road.
                                                                            A solid front fence to the Noosa
                                                                            Parade frontage is proposed for
                                                                            a portion of the frontage and
                                                                            comprises a height of 1.8m
                                                                            above NGL.

                                     AO17.4                                 AO17.4 Complies

                                     The area of land between the           The area between the front fence
                                     front fence and the boundary is        is dedicated for landscaping
                                     landscaped to screen the fence         elements that connect to the
                                     from the street however                existing footpath along the
                                     landscaping does not encroach          frontage of the site.
                                     more than 500 millimeters into
                                     the road reserve or within 1.5
                                     metres of a sealed footpath.

                                     Editor's note— for examples
                                     refer to figure AP3-4A and
                                     figure AP3-4B

 Roof Forms




Medium Density Residential Zone Code                                                                           6

Page 8

 Performance Outcomes                Acceptable Outcomes                  Response

 PO19                                AO19.1                               Not Applicable

 Roof forms:                         With the exception of Noosa          The development site is located
                                     Heads and Coastal Communities        in the Noosa Heads Local Area.
   a) contribute positively to the
                                     Local Areas, the main roof of the
      local skyline;
                                     building has a roof pitch no less
   b) complement the character       than 5 degrees and has minimum
      of the locality and the        600 millimetre eaves to at least
      topography of the site;        75% of the perimeter of the
                                     building.
   c) avoid box
      profiles/parapets; and         AO19.2                               AO19.2 Complies

   d) do not create                  Development does not include         The development does not
      opportunities for              rooftop terraces.                    involve roof terraces.
      overlooking the private
      open space or internal         AO19.3                               AO19.3 Complies
      spaces of neighbouring
                                     The total width of any parapet       The development does not
      properties.
                                     wall does not exceed 50% of the      involve any parapet wall that
                                     width of the front facade of a       exceeds 50% of the width of the
                                     building.                            front façade.

 PO21                                AO21.2                               Not Applicable

 Mechanical plant, vehicle           For a lit sports court:              The development does not
 manoeuvring, utilities and                                               include a lit sports court.
                                        a) the court is located at
 communal outdoor recreation
                                           least 60 metres from the
 uses:
                                           external wall of an existing
   a) do not have an adverse               or approved dwelling on
      effect on the amenity                adjoining or nearby
      enjoyed by users of                  premises (as measured
      adjacent or nearby                   from the centre line of the
      premises through                     court); and
      emission of noise, light,
                                        b) the vertical illumination
      fumes or smoke; and
                                           resulting from direct,
   b) do not cause                         reflected or other
      unreasonable disturbance             incidental light emanating
      to local fauna through light         from the site does not
      or smoke emissions.                  exceed 8 lux when
                                           measured at any point 1.5
                                           metres outside the
                                           boundary and at any level
                                           from ground level upward;
                                           and

                                     any floodlighting is restricted to
                                     the types that give no upward
                                     component of light were mounted




Medium Density Residential Zone Code                                                                        7

Page 9

 Performance Outcomes             Acceptable Outcomes                    Response

                                  horizontally (i.e. a full cut off
                                  luminaire).

                                  AO21.3                                 AO21.3 Complies

                                  Mechanical plant is-                   The development locates the
                                                                         plant room is located in the
                                       a) located at least 2 metres
                                                                         basement.
                                          from the side or rear
                                          property boundaries;

                                       b) where located at ground
                                          level, screened by fencing
                                          1.5 metres in height or
                                          dense vegetation of at
                                          least 1.5 metres in width
                                          incorporating grouped
                                          trees and shrubs with a
                                          maximum separation
                                          distance of 1 metre
                                          measured from the centre
                                          of the plant;

                                       c) where located above
                                          ground level, enclosed or
                                          screened such that it is
                                          not visible from the street
                                          frontage nor adjoining
                                          properties; and

                                       d) visually integrated into the
                                          line and plane of the
                                          building and roof design
                                          and does not project
                                          beyond the height or width
                                          of the building when
                                          viewed from the street and
                                          adjoining properties.

                                       c) Editor’s Note—
                                          Mechanical plant includes
                                          generators, motors,
                                          compressors and pumps
                                          such as air-conditioning or
                                          pool equipment.

 PO22                             AO22.1                                 Performance Outcome Sought

 Development:                     For landscape amenity reasons,         The proposed development
                                  cut or fill is less than 1.5 metres    requires a cut depth of 3.6m to
                                                                         achieve the depth of excavation




Medium Density Residential Zone Code                                                                       8

Page 10

 Performance Outcomes             Acceptable Outcomes                  Response

   a) has minimal impact on the   in depth relative to the ground      required to facilitate the
      natural landform of the     level.                               basement level.
      site;
                                                                       As the proposal exceeds the
   b) does not lead to erosion                                         prescribed cut depth of 1.5m, a
      or the transport of                                              Performance Outcome is
      sediments off site; and                                          therefore sought.

   c) does not lead to the                                             The proposed excavation avoids
      disturbance of natural                                           minimal impact on the landform
      features, buildings or                                           and maintains the landscape
      structures of cultural                                           amenity of the site through
      heritage significance                                            retained or replanted
                                                                       landscaping.

                                                                       Please refer to Section 6 of the
                                                                       Town Planning Report for further
                                                                       details.

                                  AO22.2                               AO22.2 Complies

                                  Development does not result in       The development site is
                                  sediment or other material           connected to all necessary
                                  including building materials or      infrastructure services.
                                  waste products being deposited       Importantly, the development will
                                  or released into the road reserve,   not result in deposits of sediment
                                  stormwater drain or adjacent         or other material being released
                                  properties.                          into the existing connected
                                                                       infrastructure, either during
                                                                       construction or post-construction.

 PO23                             AO23.1                               Not Applicable

 Development on sloping sites:    Building and structures are not      The development is not located
                                  constructed on land with a slope     on land with a slope greater than
   a) is visually responsive to
                                  greater than 25%.                    25%.
      the natural topography
      and sits within the         AO23.2                               Not Applicable
      landscape rather than
      dominating it; and          On sloping sites, split level        The development is not located
                                  buildings with small floorplates,    on land with a slope greater than
   b) steps down slopes or uses   that step down the slope are         25%.
      suspended floor             used as an alternative to
      construction, minimising    standard single or double storey
      cut or fill and avoiding    construction to minimise building
      benching of the site.       bulk and benching of the sites.

                                  Editor's note- refer to Figure
                                  6.9.1A and Figure 6.9.1B

 PO24                             AO24                                 AO24 Can Comply




Medium Density Residential Zone Code                                                                        9

Page 11

 Performance Outcomes                 Acceptable Outcomes                Response

 Filling and excavation for           Filling and excavation for         The development involves
 operational works do not directly,   operational works is designed      excavation works to facilitate the
 indirectly or cumulatively cause     and constructed to ensure          basement level. The
 adverse impacts external to the      overland flow and/or flooding is   development be designed via a
 development site by:                 not worsened, impeded, or          condition to ensure that the
                                      otherwise diverted to adversely    construction of the basement will
   a) causing ponding of water
                                      affect other properties or         not result in overland and/or
      on the site or nearby land;
                                      downstream environments.           flooding is worsened or diverted
   b) increasing flooding, which                                         to other properties.
      adversely affects the
      safety or use of any land
      upstream or downstream;
      or

   c) adversely affecting the
      flow of water in any
      overland flow path.




Medium Density Residential Zone Code                                                                      10

Page 12

9.3.1 LOW DENSITY HOUSING CODE
Table 9.3.1.3 Criteria for assessment

 Performance Outcomes              Acceptable Outcomes                             Response

 Effects of Use

 Removal homes                     AO2.1                                           Not Applicable
 PO2
                                   Any part of a removal home that is              The proposed development
 A removal home—                   affected by termite attack, borers,             does not involve a removal
                                   dry rot or severe weathering or is              home.
     a) does not have an
                                   damaged as a consequence of
        adverse impact on the
        amenity of the premises    relocation, is repaired or replaced
        or surrounding             using new or sound second-hand
        premises; and              materials.

 maintains the safety of people    AO2.2
 and property.                     Where located within the urban
                                   boundary, external surfaces of the
                                   building are cleaned and painted.
                                   Editor's Note—the urban boundary is
                                   indicated on the zone maps contained
                                   within Schedule 2.

                                   Editor's Note— applicants will be required
                                   to pay a performance bond to Council
                                   before final building approval is granted.
                                   The bond is held by Council until all
                                   external building works are completed to a
                                   satisfactory level, usually within a 12 to 24
                                   month time frame.

 Housing choice                    AO3                                             Not Applicable
 PO3
                                   A secondary dwelling:                           The proposed development
 A secondary dwelling:                                                             does not involve a secondary
                                             a) has a maximum gross
                                                floor area of 65m²;                dwelling.
   a) forms part of a dwelling
      house and is not
                                             b) has no more than 2
      subdivided from the
                                                bedrooms;
      balance of the dwelling
      house;                                 c) does not occur on any
                                                property covered by
   b) contributes to housing                    a Building Unit Plan;
      choice for members of the                 and
      one household;
                                             d) does not occur on a
   c) protects the low                          property that already
      density residential, rural                contains a dual
                                                occupancy or secondary
                                                dwelling.




Low Density Housing Code

Page 13

 Performance Outcomes                Acceptable Outcomes                     Response

       residential or rural
       character of the zone;

   d) does not occur on a
      property covered by
      a Building Unit Plan or any
      property already
      containing more than
      one dwelling;

   e) is accompanied by
      sufficient car parking.




 Building design and services

 Service and utilities               AO5.1                                   AO5.1 Complies
 PO5                                 If located within the urban boundary, The proposal site is connected
                                     the dwelling is connected to
 Development is provided with:                                             to the prescribed services and
                                     reticulated water supply, sewerage,
                                     stormwater drainage and               utilities.
     a) a level of infrastructure
                                     telecommunications infrastructure
        and services that is         networks (where available to the
        appropriate to its setting   lot).
        and sufficient for the       Editor’s Note—the urban boundary is
        intended use;                indicated on the zone maps contained
                                     within Schedule 2.
     b) an effluent treatment
        and disposal system
        that does not have an        AO5.2                                   Not Applicable
        adverse effect on
        ecologically important       Where there is no reticulated water     The proposed development will
                                     supply, the premises is serviced
        areas or water quality;                                              be connected to the reticulated
                                     with a rainwater tank with the
        and                          following minimum water supply          water supply.
                                     capacity:
     c) adequate onsite water
        storage to support the           a) for dwellings with no more
        efficient use of water              than 3 bedrooms – 45,000
                                            litres; or
        and is adequate for              b) for dwellings of more than 3
        everyday use of the                 bedrooms or where
        occupants.                          including a secondary
                                            dwelling on the same
                                            premises – 60,000 litres.

                                     AO5.3                                   Not Applicable

                                     If located on a lot where reticulated   The proposed development will
                                     sewerage is not available to the        be connected to the reticulated
                                     lot, the dwelling is connected to an    sewerage system.
                                     on-site effluent treatment and
                                     disposal system.




Low Density Housing Code                                                                                       2

Page 14

 Performance Outcomes                 Acceptable Outcomes                      Response




 Landscaping                          AO6                                      AO6 Complies
 PO6
                                      Soft landscaping is provided and         The proposed development
 Buildings and structures allow       retained to a minimum of 20% of          achieves a total 229m2 of soft
 for sufficient space for outdoor     the site area.                           landscaping and 20.6% of the
 activities, garden areas and                                                  site area.
 screening to surrounding land
 uses.

 Car parking                          AO7                                      AO7 Complies
 PO7
                                      Car parking is provided in               The proposed development
 Sufficient car parking is provided   accordance with Table 9.4.1.4 of         provides six (6) undercover car
 to accommodate the number of         the Driveways and parking code.          parking spaces located in the
 vehicles likely to use the site.                                              basement.

 Driveway and crossover

 PO8                                  AO8.1                                    AO8.1 Complies

 The design, management and           Driveways and crossovers are             The development comprises a
 maintenance of the access            designed to comply with Council's        single driveway providing
 facilitates:                         standard drawings RS-049, RS-            access from Noosa Parade to
                                      050, RS-056 and addendum as              the basement level in
     a) safe and convenient use       applicable.                              accordance with Council’s
        for vehicles, pedestrians
                                                                               standard drawings as
        and cyclists;
                                                                               prescribed.
     b) vehicles negotiating
                                      AO8.2                                    AO8.2 Complies
        without contacting the
        driveway or crossover         Where a footpath exists, the             Noosa Parade comprises an
        surface; and                  driveway meets the road reserve          existing footpath that meets the
                                      at the level of the existing footpath.   proposed driveway at the level
     c) stormwater disposal
                                                                               of the existing footpath.
        without any negative
                                      AO8.3
        impacts on the
        surrounding area.             Driveways within the property:
                                                                               AO8.3 Complies

                                         a) have a maximum gradient            The proposed driveway has
                                            of 20% and vertical curves         been designed to have a
                                            to ensure no scraping for a        maximum gradient of 20%.
                                            standard vehicle; or




Low Density Housing Code                                                                                          3

Page 15

 Performance Outcomes              Acceptable Outcomes                            Response

                                       b) have a maximum gradient
                                          of 25% provided–

                                          i.    the length of the
                                                driveway steeper than
                                                20% does not exceed 6
                                                metres; and

                                         ii.    there is a change in
                                                gradient not less than 2
                                                metres in length and not
                                                greater than 12:5% at
                                                the ends of the 25%
                                                section of the driveway.




 PO9                               AO9                                            AO9 Complies

 The driveway and crossover        The driveway and crossover is                  The proposed development
 design avoids using structures    designed without significant                   largely maintains the existing
 within the road reserve.          alteration to the existing road                driveway location to Noosa
                                   reserve whereby the finished                   Parade. The proposed
                                   surface level of the driveway is               development comprises a
                                   consistent in height with the                  driveway design that is
                                   existing height of the road reserve.           consistent with the height of the
                                   Editor’s Note—Should the design not            road reserve.
                                   comply with the standard drawings,
                                   including any cut or fill within the road
                                   reserve, an operational works application to
                                   Council for a non-standard driveway is
                                   required.


 Materials                         AO10                                           AO10 Complies
 PO10
                                   No pavers or permeable pavement                The proposed development
 Driveways and crossovers are to   systems are used within the road               does not include pavers or
 be able to withstand loadings     reserve.                                       permeable pavement systems
 from vehicles and the use of                                                     within the road reserve.
                                   Editor's Note- Examples of the types of
 pavers is avoided.
                                   pavers to avoid include clay, concrete and
                                   permeable pavement products.

 Surface Water                     AO11                                           AO11 Complies
 PO11
                                   Driveways have a minimum grade                 The design of the driveway to
 Driveways are designed to:        of 1% away from any adjoining                  the basement has been
                                   buildings and are formed to drain              designed in accordance with the
                                   to landscaped areas.                           1% minimum grade and other
                                                                                  design elements to ensure that
                                                                                  drainage to landscaped areas




Low Density Housing Code                                                                                              4

Page 16

 Performance Outcomes                Acceptable Outcomes                              Response

     a) prevent water from                                                            and away from the building is
        ponding or entering                                                           maintained.
        buildings;

     b) provide an opportunity
        for filtering of
        stormwater prior to it
        leaving the site; and

     c) not reduce the
        stormwater carrying
        capacity of roadways.

 Protection of infrastructure        AO12                                             AO12 Complies
 PO12
                                     Driveways are located not less                   The proposed driveway is
 Driveways do not damage or          than 1.0 metre from stormwater                   located within proximity to an
 interfere with the location,        infrastructure.                                  existing stormwater junction at
 function of, or access to Council   Editor’s Note—If the driveway covers or is       the western end of the site.
 infrastructure.                     within 1.0 metre of stormwater infrastructure,
                                     an operational works application to Council      The driveway location and the
                                     for a non-standard driveway is required.
                                                                                      existing stormwater pit are
                                                                                      established over the site, thus
                                                                                      the proposed development does
                                                                                      not alter the arrangements over
                                                                                      the site.

                                                                                      Importantly, the existing
                                                                                      stormwater infrastructure has
                                                                                      been reviewed and assessed by
                                                                                      a civil engineer to determine that
                                                                                      the infrastructure both new and
                                                                                      proposed are appropriate within
                                                                                      the context of the proposed
                                                                                      development.

 Streetscape and effect on           AO13.1                                           AO13.1 Complies
 traffic network
                                     Areas adjoining driveways                        The proposed development
 PO13
                                     disturbed as a result of the                     incorporates landscaped areas
 The visual impact of driveways      driveway construction are grassed                along the edge of the driveway
 on the streetscape and              or planted to minimise visual                    which will encourage bank
 surrounding area is minimised       impact and stabilise the soil.                   stabilisation and limit soil
 and significant adverse impacts                                                      disturbance.
 on the traffic network are
                                     AO13.2                                           AO13.2 Complies
 avoided.
                                     Vehicular access avoids                          The proposed development will
                                     disturbance to the tree protection               not result in interference with the
                                     zone of trees on public land.                    tree protection zone.




Low Density Housing Code                                                                                                    5

Page 17

 Performance Outcomes                Acceptable Outcomes                    Response

 Driveway location                   AO14.1                                 AO14.1 Complies
 PO14
                                     Only one driveway and crossover        The proposed development
                                     is provided.                           comprises one (1) driveway and
                                                                            crossover the Noosa Parade.


                                     AO14.2                                 Not Applicable

                                     Where the premises has frontage        The site comprises a single
                                     to more than one formed and            frontage to Noosa Parade.
                                     sealed road and the roads have
                                     differing orders in the Road
                                     Hierarchy, the driveway and cross-
                                     over is provided on the frontage
                                     with the lower order.

                                     AO14.3                                 Not Applicable

                                     For corner lots, driveways and         The site is not a corner lot.
                                     crossovers are located in
                                     accordance with Council's
                                     standard drawings.

                                     AO14.4                                 Not Applicable

                                     If in the Rural zone or Rural          The site is located in the
                                     Residential zone, the driveway and     Medium Density Residential
                                     cross-over is located to provide       Zone and is not located in the
                                     minimum safe sight distances in        prescribed zones.
                                     accordance with Austroads.

                                     Editor's Note - An operational works
                                     application is required for a second
                                     driveway.

 Bushfire Hazard Management          AO15                                   Not Applicable
 PO15
                                     Within a bushfire hazard area          The site is not located in the
 Where located in a Bushfire         where there is no reticulated water    Bushfire Hazard Area.
 Hazard Area as shown on the         supply, the premises has:
 Bushfire Hazard Overlay Map in
                                          a) an accessible dam,
 Schedule 2 and not in a water
                                             swimming pool or water
 service area, an adequate,
                                             tank available for
 reliable, safely located and
                                             firefighting purposes with
 freely accessible water supply is
                                             an onsite water volume of
 provided for fire fighting
                                             not less than 5,000 litres;
 purposes, which is in addition to
                                             and
 day to day water supply.
                                          b) a water supply outlet pipe
                                             50 millimetres in diameter




Low Density Housing Code                                                                                     6

Page 18

 Performance Outcomes                   Acceptable Outcomes                             Response

                                                  and fitted with a standard
                                                  fire brigade fitting
                                                  connected to the water
                                                  supply (other than where
                                                  the water supply is in a
                                                  swimming pool or dam).

                                        Editor’s Note — Water supply capacity for
                                        firefighting purposes is in addition to water
                                        supply capacity for household use.

 Flood Hazard                           AO16.1                                          AO16.1 Complies
 PO16
                                        Where the development is located                The site is located within the
 Development is designed and            in the Flood Hazard Area as                     Flood Hazard Area. A Flood
 sited to ensure risk to people         shown on Flood Hazard Overlay                   Information Certificate has been
 and property from flooding is          Map in Schedule 2, the finished                 sourced which advises that the
 avoided or minimised.                  floor level of habitable rooms is at            finished floor level of habitable
                                        least 300 millimetres above the                 rooms is to be 2.7m AHD.
                                        Defined flood event (DFE).
                                                                                        The proposal has been
                                        OR                                              designed to achieve the DFL as
                                                                                        prescribed for the site.

                                        AO16.2                                          Not Applicable

                                        Where the DFE has not been                      The DFE has been modelled for
                                        modelled for the area, the finished             the site.
                                        floor level of habitable rooms is at
                                        least 500 millimetres above the
                                        highest recorded flood.

                                        Editor's Note—The QDC mandatory
                                        provisions MP3.5 also apply to the
                                        construction of buildings in flood hazard
                                        areas.

 PO17                                   AO17                                            PO17 Complies
 Underground car parking areas
                                        No acceptable outcome provided                  The proposed development
 are designed to drain and
                                                                                        comprises a basement car
 function safely during a flood
                                                                                        parking level. The basement as
 event and power failure.
                                                                                        been designed the ensure
                                                                                        appropriate drainage and flood
 Editor's note—Basements should have                                                    mitigation measures.
 flood immunity above the 1%AEP
 defined flood event with alternative
 means to mechanical pumping used to
 achieve such immunity.




Low Density Housing Code                                                                                                    7

Page 19

 Performance Outcomes                Acceptable Outcomes                   Response

 Major Electricity Infrastructure                                          Not Applicable
 & Substations
                                                                           The site is not located within
 PO18
                                                                           proximity to the prescribed
                                     AO18.1
 Development is sufficiently                                               electricity infrastructure.
 separated from major electricity    Development including any
 infrastructure and substations to   sensitive land uses is at least:
 minimise the likelihood of
                                         a) 50 metres from a
 nuisance or complaint.
                                            transmission substation;

                                         b) 10 metres from any other
                                            substation; and

                                         c) 30 metres from a
                                            transmission line
                                            easement.

                                     AO18.2

                                     Habitable buildings are not located
                                     within an easement for a
                                     distribution line.

 PO19                                AO19.1

 Development is located and          Noise emissions do not exceed
 designed to avoid or minimise       5db(A) above background noise
 noise nuisance from the use of      level internal to a habitable
 infrastructure.                     building measured in accordance
                                     with AS1055.

 PO20                                AO20

 Wherever practicable habitable      Where adjoining substations or
 buildings are orientated to avoid   major electricity infrastructure,
 direct overlooking of major         habitable buildings are orientated
 electricity infrastructure or       so that the majority of outdoor
 substations.                        living areas and windows of
                                     habitable rooms face away from
                                     the infrastructure.

 Earthworks and Drainage             AO21                                  Not Applicable
 PO21
                                     Filling other than accessways:        The proposed development
 Earthworks and drainage                                                   does not involve filling works.
                                         a) does not extend more than
 operational works do not
                                            the equivalent of 3 metres
 directly, indirectly or
                                            around the main building,
 cumulatively cause adverse
                                            measured from the outer
 impacts external to the
                                            walls of the building;
 development site by:




Low Density Housing Code                                                                                     8

Page 20

 Performance Outcomes                         Acceptable Outcomes                 Response

      a) causing ponding of                      b) is limited to a maximum of
         water on the site or                       500m2; and
         nearby land;
                                                 c) does not impact on the
      b) increasing flooding,                       local drainage of adjoining
         which adversely affects                    properties.
         the safety or use of any
         land upstream and
         downstream;

      c) adversely affecting the
         flow of water in any
         overland flow path; and

      d) adversely affecting the
         privacy or visual
         amenity of surrounding
         property.



 Editor's Note—Development should
 ensure that filling does not impact on the
 amenity and usability of neighbouring
 properties (including loss of privacy
 caused by relative level changes) or
 offsite drainage.




Low Density Housing Code                                                                     9

Page 21

8.2.1 ACID SULFATE SOILS OVERLAY CODE
Table 8.2.1.3 – Criteria for assessable development

Performance Outcomes             Acceptable Outcomes                      Response

Avoidance and management of ASS

PO1                              AO1.1                                    PO1 Can Comply

Development:                     The disturbance of ASS is                The proposal site is located in
                                 avoided by:                              the Acid Sulfate Soils Overlay.
  (a) does not disturb ASS; or
  (b) is managed to avoid or     (a) undertaking                          The proposal involves
      minimise the release of        an ASS investigation and             excavation of a basement,
      acid and metal                 soil analysis according to           requiring a depth cut of 3.6m at
      contaminants, where            the National Acid Sulfate            the deepest point.
      disturbance of ASS is          Soils Guidance;
                                                                          Prior to the commencement of
      unavoidable.               (b) not excavating or otherwise
                                                                          excavation works, the
                                     removing soil or sediment
                                                                          appropriate steps will be
                                     containing ASS;
                                                                          undertaken involving ASS
                                 (c) not permanently or
                                                                          investigations accordance with
                                     temporarily extracting
                                                                          relevant guidelines and
                                     groundwater that results in
                                                                          mitigate any impacts of
                                     the aeration of previously
                                                                          disturbances with ASS.
                                     saturated ASS; and
                                 (d) not undertaking filling on           A reasonable and relevant
                                     land at or below 5 metres            condition can be adopted to
                                     AHD that results in:-                ensure that any disturbance
                                     (i) actual ASS being                 with ASS is appropriately
                                          moved below the water           managed through the provision
                                          table; or                       to provide an ASS
                                     (ii) previously                      management plan prior to the
                                          saturated ASS being             commencement to excavation
                                          aerated.                        works.

                                 Editor's note—National Sampling and
                                 Identification Methods Guidelines is a
                                 reference to:

                                 (a)   National Acid Sulfate
                                       Soils Guidance: National acid
                                       sulfate soils sampling and
                                       identification methods manual,
                                       Department of Agriculture and
                                       Water Resources, Canberra
                                       (Sullivan et al, 2018); and



                                                                                                             1

Page 22

Performance Outcomes   Acceptable Outcomes                       Response
                       (b)   National Acid Sulfate
                             Soils Guidance: National Acid
                             Sulfate Soils Identification and
                             Laboratory Methods Manual,
                             Department of Agriculture and
                             Water Resources, Canberra; and
                       (c) the Australian Standard 4969

                       OR

                       AO1.1
                       The disturbance of ASS avoids
                       the release of acid and metal
                       contaminants by:-

                       (a) undertaking
                           an ASS investigation
                           conforming to
                           the National Acid Sulfate
                           Soils Guidance;
                       (b) neutralising existing acidity
                           and preventing the
                           generation of acid and metal
                           contaminants using
                           strategies documented in
                           the Soil Management
                           Guidelines; and
                       (c) preventing the release of
                           surface or groundwater
                           flows containing acid and
                           metal contaminants into the
                           environment.

                       AND

                       Editor's note—Soil Management
                       Guidelines is a reference to the 'Soil
                       Management Guidelines.
                       Queensland Acid Sulfate Soils Technical
                       Manual'. Dear SE, Moore NG, Dobos
                       SK, Watling KM and Ahern
                       CR. Department of Natural Resources
                       and Mines (2002).


                       AO1.3
                       Where potential or

                                                                            2

Page 23

Performance Outcomes   Acceptable Outcomes              Response

                       actual ASS is identified, they
                       are managed in accordance
                       with an ASS management
                       plan.




                                                                   3

Page 24

8.2.6 FLOOD HAZARD OVERLAY CODE
Table 8.2.6.3 Criteria for assessable Development
Performance Outcomes                 Acceptable Outcomes                      Response

Floodplain protection, immunity and safety – for development areas

PO1                                  AO1                                      AO1 & AO2 Complies
Development provides that for all The finished flood level is not less A Flood Information Certificate
flood events up to and including than the minimum design levels has been sourced which details
the DFE :                          specified in Table 8.2.6.4          that the design requires a
                                                                       minimum floor level for habitable
    (a) the safety of people on
                                                                       rooms of 2.7m AHD.
        the site is protected; and
                                                                       The proposal achieves the
    (b) the risk of damage to
                                                                       minimum floor level requirements
        property on the site is
                                                                       as prescribed.
        avoided or minimised as
        far as practicable.
PO2                                  AO2
All lots have sufficient area that is The minimum area above flood
above the DFE flood level or          level (flood free area) for each lot,
where modelling is not available, is in accordance with Table
the highest recorded flood level, 8.2.6.5.
to safely and adequately
accommodate the intended use.
PO3                                  AO3                                      Not Applicable
For reconfiguring a lot or           Development areas are not filled The proposal does not involve fill.
operational works, development       to reduce flood risk.
is undertaken in a manner that
ensures:
    (a) natural hydrological
        systems are protected
        from erosion, scour or
        flood damage on the
        premises or other
        premises;
    (b) natural landforms and
        drainage lines are
        maintained to protect the
        hydraulic performance of
        waterways and flood
        plain; and
    (c) development integrates
        with the natural landform
        rather than modifying the
        landform to suit the
        development as far as
        practicable.
PO4                                  AO4.1                                    AO4.1 – AO4.3 Complies

                                                                                                        1

Page 25

Performance Outcomes               Acceptable Outcomes                   Response

For reconfiguring a lot,         Development provides an           The proposal provides access to
development does not             effective evacuation route that   Noosa Parade in a flood free
compromise the safety of people remains passable, with sufficient route through the development in
resulting from the flood risk    flood warning time, to enable     the event exceeding the DFE.
associated with events exceeding people to progressively evacuate
                                                                   The development comprises a
the DFE.                         to safe areas above the PMF in two storey dwelling house which
                                 the face of advancing flood or    is designed above the DFE which
                                 waters for events that exceed the
                                                                   can provide congregation and
                                 DFE.
                                                                   refuge if required.
                                                                         The site adjoins Noosa Parade
                                   OR                                    which provides the site at the
                                                                         level of the road immunity.

                                   AO4.2
                                   Development provides for an
                                   area of sufficient size and
                                   dimensions on site above the
                                   PMF that allows for safe
                                   congregation and refuge.


                                   AO4.3
                                   Where the existing roads
                                   servicing a development provide
                                   a specific flood immunity (as
                                   determined by the Qld Transport
                                   Road and Drainage Design
                                   Manual, Queensland Urban
                                   Drainage Manual and the
                                   Australian Rainfall and Runoff
                                   Guide), all lots have access to the
                                   flood free area identified in Table
                                   8.2.6.5 that matches the road
                                   immunity.
PO5                                AO5                                   AO5 Complies
For reconfiguring a lot or         In the Flood Hazard Overlay, or in The development maintains the
operational works, development areas otherwise determined to be flood storage capacity over the
does not directly, indirectly or   subject to the DFE or DSTE,           site and will not result in
cumulatively alter the flood       development ensures:                  worsened overland flow plans or
characteristics external to the                                          increased velocity through the
                                        (c) there is no loss of on-site
development site for all flooding                                        site as an outcome of the
                                            flood storage capacity;
and inundation events up to and                                          proposal.
including the DFE or DSTE based         (d) all changes to level,
on:                                         depth, duration and
                                            velocity of floodwaters
     (a) current climate                    are contained within the
         conditions; and                    site for all flood events up
     (b) incorporating an                   to and including the DFE
         appropriate allowance for          based on current climate


                                                                                                           2

Page 26

Performance Outcomes               Acceptable Outcomes                    Response

        the predicted impacts of            and predicted impacts of
        climate change.                     climate change at 2100;
                                        (e) there is no acceleration
                                            or retardation of flows, or
                                            any retardation in flood
                                            warning times, elsewhere
                                            on the floodplain and to
                                            any overland flow paths;
                                            and
                                        (f) there is no increased
                                            stormwater ponding on
                                            sites upstream,
                                            downstream or in the
                                            general vicinity of the
                                            site.
Resilient building design and form

PO6                                AO6.1                                  AO6.1 Complies
Development ensures that           Buildings are designed to            The development is designed to
building design and building form: integrate well with the street level be integrated with the Noosa
    (a) accounts for potential     and the levels of adjoining          Parade street level and facilitates
         flood risk;               properties to facilitate pedestrian  pedestrian connections through
                                   flows and visual and physical        the ground levels.
    (b) is resilient to flood      connectivity between the footpath
         events; and               and ground floors.
    (c) maintains a functional
        and attractive street                                             AO6.2 Complies
                                   AO6.2
        address appropriate to                                       The proposal comprises a
        the intended use.          Buildings incorporate appropriate
                                                                     basement level which is not
                                   screening to ensure that any
                                                                     visible from the street level.
                                   under-storey is not visible from
                                   the street, where such screening
                                   does not impede flood water
                                   flows.

                                                                          AO6.3
                                   AO6.3
                                                                      The proposal provides non-
                                   Residential buildings minimise     habitable uses and parking at the
                                   risk from flooding by providing    basement level. Further, the
                                   parking and other low intensive, development has been designed
                                   non-habitable uses at ground       to comply with the minimum
                                   level, rather than habitable uses. habitable floor level requirement
                                                                      and thus the habitable areas on
                                                                      the ground level are appropriately
                                                                      designed.



                                                                          Not Applicable

                                                                                                          3

Page 27

Performance Outcomes               Acceptable Outcomes                   Response

                                   AO6.4                                 The proposal is for a residential
                                   Non-residential buildings and         building and structure.
                                   structures are oriented to the
                                   street by activating the street
                                   frontage with appropriate uses
                                   and urban design treatments
                                   such as recessed wall
                                   treatments, screening or
                                   landscaping, whilst allowing for
                                   flow through of flood waters on
                                   the ground floor.


                                   Editor's Note— The use of flood
                                   resilient building materials is also
                                   encouraged for building works up
                                   to the probable maximum flood to
                                   reduce the consequences of
                                   flooding.                            AO6.5 Complies
                                                                      The proposed basement has
                                                                      been designed to ensure that
                                   AO6.5
                                                                      appropriate drainage and function
                                   Basements and underground car can be safely achieved in a flood
                                   parking areas are designed to      event.
                                   drain and function safely during a
                                   flood event and power failure.


                                   Editor's note—Basements should
                                   have flood immunity above the
                                   1%AEP defined flood event with
                                   alternative means to mechanical
                                   pumping used to achieve such
                                   immunity.
Disaster Management

PO7                                AO7.1                                 AO7.1 – AO7.3 Complies
Development supports, and does Development is located to             The proposal does not increase
not unduly burden, disaster        support self-evacuation of people the number of people at risk of
management response or             and ensure sufficient warning     flooding over the site and
recovery capacity or capabilities. time for the nature of the use.   facilitates the ability for residents
                                                                     to be able to self evacuate.
                                                                         Further, the development enables
                                   AO7.2
                                                                         the ability for materials to be
                                   Development does not:                 stored appropriately on the site.
                                        (a) increase the number of
                                            people calculated to be at
                                            risk from flooding;



                                                                                                             4

Page 28

Performance Outcomes                 Acceptable Outcomes                 Response

                                         (b) increase the number of
                                             people likely to need
                                             evacuation;
                                         (c) shorten flood warning
                                             times for other uses in
                                             the floodplain; or
                                         (d) impact on the ability of
                                             traffic to use evacuation
                                             routes, or unreasonably
                                             increase traffic volumes
                                             on evacuation routes.


                                     AO7.3
                                     Materials stored on site:
                                         (a) are readily able to be
                                             moved in a flood event to
                                             a flood free area; or
                                         (b) are contained in order to
                                             minimise movement in
                                             times of flood.


                                     Editor's Note— Businesses
                                     should ensure that necessary
                                     emergency and continuity plans
                                     are in place to account for the
                                     potential need to evacuate
                                     personnel and to relocate
                                     property prior to a flood event.
Essential network infrastructure

PO8                                  AO8                                 AO8 Complies
Essential network infrastructure Essential network infrastructure All essential infrastructure that is
maintains effective function       that is likely to fail to function or subject to fail in the event of flood
during and immediately after flood may result in contamination when water inundation is designed
and storm tide inundation events. inundated by flood water (e.g.         appropriately or located above
                                   water supply pipeline air valves the DFE.
                                   and the like) is located above the
                                   DFE level (or where the DFE has
                                   not been modelled for the area,
                                   above the highest recorded flood
                                   level for the area).
Essential community infrastructure

PO9                                  AO9.1                               Not Applicable
Essential community                  Essential community                 The proposal is for a dwelling
infrastructure is able to function   infrastructure is sited and         house and does not involve
                                     constructed to ensure that flood
                                                                                                             5

Page 29

Performance Outcomes                  Acceptable Outcomes                    Response

effectively during and immediately levels comply with flood immunity essential community
after flood events.                requirements specified in Table infrastructure.
                                   8.2.6.4.


                                      AO9.2
                                      Essential community
                                      infrastructure which is located
                                      below the specified flood
                                      immunity requirements:
                                          (a) is designed and
                                              constructed to function
                                              effectively during and
                                              immediately after the
                                              recommended flood level
                                              event; and
                                          (b) has direct access to low
                                              hazard evacuation routes
                                              or an emergency rescue
                                              area above the PMF, if it
                                              is for emergency services
                                              (including emergency
                                              shelters, police facilities,
                                              hospitals and associated
                                              facilities).
Earthworks

PO10                                  AO10                                   Not Applicable
Excavation and filling for            Filling, other than accessways:  The proposal does not involve
operational works only occur                                           filling works. However, the
                                          (i) does not extend more
where they:                                                            proposal does require excavation
                                              than the equivalent of 3
                                                                       works to facilitate the basement
    (a) result in the protection,             metres around the main
        rehabilitation and repair             building, measured from level.
        of ecologically important             the outer walls of the   These excavation works and the
        areas, watercourses,                  building;                subsequent design outcome will
        drainage lines and                                             not impact waterways, affect
                                          (j) is limited to a maximum
        wetlands;                                                      flood capacity or increase the
                                              of 500m2; and
    (b) do not adversely impact                                        flooding risks over the site.
                                          (k) does not impact on the
        on the overall hydrology,
                                              local drainage of
        hydraulics and flood
                                              adjoining properties.
        capacity of a waterway;
    (c) do not directly, indirectly
        or cumulatively cause
        adverse impacts external
        to the site;
    (d) do not cause increased
        flooding, which adversely
        affects the safety or use

                                                                                                      6

Page 30

Performance Outcomes                Acceptable Outcomes                 Response

       of any land upstream or
       downstream;
   (e) do not cause ponding of
       water on the site or
       nearby land;
   (f) do not result in a
       reduction in flood storage
       capacity;
   (g) do not adversely affect
       the flow of water in any
       overland flow path; and
   (h) do not adversely affect
       the privacy or visual
       amenity of surrounding
       property.


Editor’s Note— The Earthworks
Code sets out further
requirements for earthworks.
Hazardous materials

PO11                                AO11.1                              Not Applicable
Development ensures that public Materials manufactured or stored The proposal is for a Dwelling
safety and the environment are on site are not hazardous or      House and does not involve
not adversely affected by         noxious, or do not comprise    hazardous or noxious materials.
avoiding the release of hazardous materials that may cause a
materials into flood waters and   detrimental effect on the
the environment.                  environment if discharged in a
                                  flood event.


                                    OR


                                    AO11.2
                                    If a DFE is adopted, structures
                                    used for the manufacture or
                                    storage of hazardous material are
                                    located above the DFE level.


                                    Editor’s Note— Refer to the Work
                                    Health and Safety Act 2011 and
                                    associated Regulation and
                                    Guidelines, the Environmental
                                    Protection Act 1994 and the
                                    relevant building assessment
                                    provisions under the Building Act
                                    1975 for requirements relating to
                                                                                                   7

Page 31

Performance Outcomes   Acceptable Outcomes                Response

                       the manufacture and storage of
                       hazardous substances.
                       Information is provided by
                       Business Queensland on the
                       requirements for storing and
                       transporting hazardous chemical.




                                                                     8

Page 32

9.4.8 WATER QUALITY & DRAINAGE CODE
Table 9.4.5.8.3 Criteria for assessment

 Performance Outcomes                Acceptable Outcomes                Response

 General Requirements

 Stormwater drainage design

 PO1                                 AO1                                PO1 Complies

 The development and its             A stormwater management plan       The proposal and its stormwater
 stormwater management system        is prepared consistent with PSP6   management systems are
 is planned and designed having      Engineering Design Standards -     planned and designed to have
 regard to:                          Roads, drainage and earthworks.    regard to the nature features of
                                                                        the site and to protect existing
    a) the natural features of the
                                                                        surrounding environmental
       site;
                                                                        values.
    b) the need to avoid impacts
       and potential risks to                                           The civil drawings prepared by
       ecologically important                                           SCG Consulting (Appendix F)
       areas;                                                           details the existing stormwater
    c) the likely effectiveness of                                      infrastructure, proposed
       erosion and sediment                                             stormwater infrastructure and the
       control and stormwater                                           appropriateness of the proposal.
       drainage measures during
       rainfall events during and
       post construction; and
    d) the need to protect
       environmental values and
       water quality of receiving
       waters both during and
       post construction.

PO2                                  AO2.1                              PO2 Complies

 Stormwater drainage                 Stormwater drainage planning,      The proposal and its stormwater
 infrastructure is planned,          design and construction is in      management systems are
 designed and constructed to:        accordance with PSP6               planned and designed to have
                                     Engineering Design Standards -     regard to the nature features of
      a) incorporate allowance for
                                     Roads, drainage and earthworks     the site and to protect existing
         increased flood risk and
                                     and the latest version of the      surrounding environmental
         tidal inundation through
                                     Queensland Urban Drainage          values.
         pipework as a result of
                                     Design Manual.
         cilmate change and sea                                         The civil drawings prepared by
         level rise;                 AO2.2                              SCG Consulting (Appendix F)
                                                                        details the existing stormwater
                                     The stormwater drainage system     infrastructure, proposed
                                     connects to a lawful point of




Water Quality & Drainage Code

Page 33

Performance Outcomes                  Acceptable Outcomes                 Response

    b) ensure the development         discharge in accordance with        stormwater infrastructure and the
       is adequately drained;         PSP6 Engineering Design             appropriateness of the proposal.
       and                            Standards - Roads, drainage and
    c) ensure stormwater is           earthworks.
       managed and lawfully
       discharged without             AO2.3
       altering stormwater            Stormwater flows discharging
       drainage characteristics       from the development are
       external to the site.          demonstrated to be consistent
                                      with predevelopment
                                      characteristics.

                                      AO2.4

                                      Development provides for the
                                      management of stormwater to
                                      incorporate appropriate
                                      allowance for climate change
                                      impacts (including rainfall
                                      intensity and sea level rise), in
                                      accordance with PSP6
                                      Engineering Design Standards –
                                      Roads, Drainage and
                                      Earthworks.

PO3                                   AO3                                 PO3 Complies

Stormwater drainage                   Stormwater drainage                 The proposed stormwater
infrastructure conveys run-off in a   infrastructure meets the desired    drainage infrastructure meets the
manner that allows roads to           standards of service for roads      standards set out in PSP6
deliver desired standards of          functionality set out in PSP6       Engineering Design Standards -
service appropriate to the local      Engineering Design Standards -      Roads, Drainage and
conditions and local stormwater       Roads, Drainage and                 Earthworks.
drainage characteristics.             Earthworks.

PO4                                   AO4.1                               PO4 Complies

Stormwater infrastructure is          The location, design and            The proposed stormwater
                                      construction of stormwater
compatible with existing                                                  infrastructure is located,
                                      drainage structures is in
infrastructure, allows for easy       accordance with PSP6                designed and constructed in
access for the ongoing                Engineering Design Standards -      accordance with PSP6
maintenance by Council, is cost       Roads, drainage and earthworks.     Engineering Design Standards -
effective across its design life.                                         Roads, Drainage and
                                      AO4.2                               Earthworks.
                                      Where infrastructure is located
                                      on private land an easement is
                                      dedicated over the infrastructure
                                      in accordance with PSP6




                                                                                                              2

Page 34

Performance Outcomes                 Acceptable Outcomes                    Response

                                     Engineering Design Standards -
                                     Roads, drainage and earthworks.

                                     AO4.3

                                     Any alterations or repairs to
                                     infrastructure as a result of the
                                     development are made at no cost
                                     to Council.

                                     AO4.4

                                     Development avoids stormwater
                                     inflow and infiltration to the sewer
                                     infrastructure network.

                                     AO4.5

                                     Stormwater infrastructure is
                                     designed to minimise
                                     maintenance costs and the
                                     requirement for specialized
                                     equipment for maintenance
                                     techniques.

PO5                                  AO5.1                                  PO5 Complies

Stormwater drainage                  Stormwater drainage                    The proposal and its stormwater
infrastructure is aligned to avoid   infrastructure avoids crossing         management systems are
crossing waterways, wetlands,        waterways, wetlands drainage           planned and designed to have
drainage lines and ecological        lines and ecologically important       regard to the nature features of
important areas, or where it is      areas or follows the edge of           the site and to protect existing
demonstrated this is                 existing disturbed areas.              surrounding environmental
unavoidable, disturbed areas are                                            values.
reinstated and revegetated upon      AO5.2
                                                                            Whilst the site benefits from a
completion of works.                 Stormwater drainage                    frontage to the canal, the
                                     infrastructure is co-located with      proposal does not interfere with
                                     other infrastructure within a          waterways, wetlands, drainage
                                     combined utility corridor where        lines or ecologically important
                                     appropriate.                           areas.

                                     AO5.3                                  Please refer to the civil drawings
                                                                            included in Appendix F for
                                     Temporary vehicular crossings of
                                                                            further details of the proposed
                                     waterways must be designed and
                                                                            stormwater design.
                                     constructed to be consistent with
                                     the current International Erosion
                                     Control Association Best Practice
                                     Book Series.




                                                                                                                 3

Page 35

Performance Outcomes                      Acceptable Outcomes                   Response

Stormwater quality and protection of receiving waters

PO6                                       AO6.1                                 Not Applicable

Development is located,                   Stormwater runoff discharging         The proposal does not involve
designed, constructed and                 into High Ecological Value waters     Stormwater runoff discharging
operated to protect and enhance           as a result of development            into High Ecological Value
environmental values and water            causes no increase in gross           waters.
quality of waterways, wetlands,           pollutants, total suspended
lakes, ground waters and                  solids, total phosphorous or total
drainage systems.                         nitrogen compared to a
                                          pre-development scenario.
Editor’s note: Environmental values of
waters and water quality objectives are   AO6.2                                 AO6.2 Can Comply
prescribed in Schedule 1 of the
Environmental Protection (Water)          All stormwater runoff is treated to   The proposal and its stormwater
Policy 2009 and are identified on the     achieve maximum removal of            management systems have been
State Planning Policy Interactive
                                          nutrients, gross pollutants and       designed to meet the standard
Mapping System.
                                          suspended solids as determined        requirements PSP6 Engineering
                                          by cost to efficiency ratios. (e.g.   Design Standards - Roads,
                                          bioretention basins must be sized     Drainage and Earthworks.
                                          to achieve at least 80% reduction
                                                                                Council can impose a reasonable
                                          in total suspended solids, 60%
                                                                                and relevant condition to ensure
                                          reduction in total phosphorous,
                                                                                that the maximum removal of n
                                          45% reduction in total nitrogen
                                                                                nutrients, gross pollutants and
                                          and 90% reduction in gross
                                                                                suspended solids as determined
                                          pollutants >5mm).
                                                                                by cost to efficiency ratios is
                                                                                achieved.



                                          AO6.3                                 AO6.3 Complies

                                          Developments achieve a                The proposal and its stormwater
                                          minimum 3 drop rating consistent      management systems have been
                                          with the Water by Design Living       designed to meet the standard
                                          Waterways Scoring Guide               requirements PSP6 Engineering
                                          (Healthy Land and Water).             Design Standards - Roads,
                                                                                Drainage and Earthworks.
                                          Editor’s note— PSP6 Engineering
                                          Design Standards - Roads, Drainage
                                          and Earthworks provides guidance on
                                          stormwater design and modelling
                                          requirements.

PO7                                       AO7.1                                 AO7.1 Complies

Water quality treatment systems           Water quality treatment systems       The proposal and its stormwater
use natural processes and                 are designed to be integrated         management systems have been
materials, whenever possible,             into the landscape consistent         designed to be integrated into the
and are integrated into                   with the technical design             landscape outcome in



                                                                                                                     4

Page 36

Performance Outcomes                 Acceptable Outcomes                 Response

development to enhance               guideline published by Healthy      accordance with the technical
biodiversity and landscape           Land and Water Water by Design      guidelines and standards.
benefits.                            for the feature. (eg. For
                                     Bioretention Basins: Bioretention
                                     Technical Design Guidelines
                                     (October 2014) and for Wetland
                                     Systems the Wetland Technical
                                     Design Guideline (May 2017).

PO8                                  AO8.1                               PO8 Complies

Water quality treatment              Detailed life cycle costing is      The proposal and its stormwater
infrastructure to be dedicated as    provided for the entire treatment   management systems relating to
public assets are proven to be       train system including              water quality treatment has been
suitable for its use and of a cost   replacement costs of asset parts.   designed to an efficient standard
effective and efficient standard.                                        to be dedicated as public assets.
                                     AO8.2

                                     Treatment systems dedicated as
                                     public assets are designed to
                                     minimise maintenance, renewal
                                     and adaption costs and the
                                     requirement for specialised
                                     equipment, material or
                                     maintenance techniques.

                                     AO8.3

                                     Vegetated stormwater
                                     management systems to be
                                     dedicated as public assets are
                                     established and maintained
                                     during the maintenance period to
                                     ensure optimal vegetated growth
                                     and that the functional elements
                                     of the system achieve the design
                                     function at the end of the
                                     maintenance period.

PO9                                  AO9.1                               Not Applicable

Treatment systems are designed       Free draining inlets and outlets    The proposal does not involve
to eliminate or minimise health,     are provided to ensure that         free draining inlets and outlets.
safety and aesthetic hazards,        waters do not pond for more than
including risks associated with      24 hours.
insect breeding, odour and public
safety.                              AO9.2                               Not Applicable

                                     Developments are designed to        The proposal does not involve
                                     eliminate retaining walls in        retaining walls as a part of the
                                                                         water quality treatment devices.




                                                                                                             5

Page 37

Performance Outcomes                  Acceptable Outcomes                      Response

                                      excess of 0.8m for any water
                                      quality treatment device.

Hydrology and waterway stability

PO10                                  AO10                                     Not Applicable

Development prevents increased        The development is designed to:          The proposal does not involve
bed and bank erosion and                                                       stormwater infrastructure that
                                           a) limit the peak 1 year ARI
sedimentation in receiving                                                     interferes with a waterway. The
                                              event discharge within
waterways by avoiding changes                                                  stormwater management
                                              the receiving waterway
in low rate, peak flow run-off and                                             systems over the site utilise
                                              to the pre-development
flow duration.                                                                 existing stormwater infrastructure
                                              peak 1 year discharge;
                                                                               networks over the site and where
                                           b) maximise pervious areas
                                                                               new infrastructure is required, is
                                              by using pervious
                                                                               designed in accordance with the
                                              alternatives for otherwise
                                                                               Sustainable Building Design
                                              impervious areas
                                                                               Code.
                                              wherever possible;
                                           c) provide for capture and
                                              reuse of stormwater for
                                              non-potable purposes for
                                              gardening, toilet flushing,
                                              laundry and hot water
                                              supply uses;
                                           d) incorporate appropriate
                                              detention features; and
                                           e) incorporate natural
                                              channel design principles

                                     Editor’s note: The Sustainable Building
                                     Design Code includes requirements for
                                     stormwater capture and reuse.


PO11                                  AO11.1

Water sensitive urban design          The design and construction of a
principles are applied to achieve     natural channel or natural
multifunctional design of             channel rehabilitation works are
waterways, wetlands and               in accordance with the Natural
drainage lines that provide for:      Channel Design Guidelines
                                      (Brisbane City Council) having
  a) stormwater conveyance
                                      regard to local topography,
     that uses natural channel
                                      geology and geomorphology.
     design;
  b) protection of landscape          AO11.2
     features and ecological
     important areas including        Landscape features, plant
                                      species and habitat types used in
                                      stormwater conveyance channels




                                                                                                                    6

Page 38

Performance Outcomes             Acceptable Outcomes                 Response

     terrestrial and aquatic     are complementary to the local
     habitat                     context and natural waterways.
  c) aesthetic and passive
     recreation values;          AO11.3
  d) flood management and        Bank and bed stability and
     conveyance of external      planting densities result in a
     catchment stormwater        stable channel over the long term
     through the development;    and minimal potential for pest
  e) landscaping that            plant species.
     incorporates local native
     species; and                AO11.4
  f) bed and bank stability.
                                 Water Sensitive Design
                                 measures are incorporated into
                                 the development, as detailed in
                                 the document Water Sensitive
                                 Designs small improvements,
                                 new ideas, concepts and sketch
                                 designs for stormwater filtration
                                 systems (Healthy Waterways
                                 Water by Design).

                                 AO11.5

                                 Floodplain management is
                                 designed in accordance with the
                                 Framework for the Integration of
                                 Flood and Stormwater
                                 Management into Open Space
                                 published by Healthy Waterways
                                 Water by Design (version current
                                 at the time of development
                                 application).

PO12                             AO12.1                              Not Applicable

Development protects in-stream   Where run-off from or within the    The proposal does not involve
ecology by maintaining pre-      site passes through or drains to    run-off through the prescribed
development low flow discharge   natural channels, waterways or      outcomes that would interfere
regimes and maintaining fish     wetlands, development protects      with surrounding in-stream
passages.                        in- steam ecology by maintaining    ecology.
                                 pre-development low flow
                                 discharge regimes in accordance
                                 with the frequent flow
                                 management objectives in PSP6
                                 Engineering Design Standards -
                                 Roads, drainage and earthworks

                                 AO12.2




                                                                                                      7

Page 39

Performance Outcomes                 Acceptable Outcomes                     Response

                                     Instream structures such as
                                     roads, bridges, culverts, and
                                     other stormwater infrastructure
                                     do not cause barriers to fish
                                     passage and facilitate the
                                     movement of terrestrial and
                                     aquatic fauna along waterway
                                     corridors.

                                     AO12.3

                                     Benthic substrate retains a
                                     continuous grade with the
                                     direction of flow consistent with
                                     the natural bed profile.

PO13                                 AO13.1                                  AO13.1 Complies

Development is designed and          The location and form of                The proposal maintains the
constructed to maintain surface      stormwater discharge points do          existing stormwater discharge
and ground water balances that       not alter the pre-development           points over the site.
sustain the environmental values     hydrology of receiving surface
                                                                             Please refer to the Civil Drawings
of water dependent ecosystems,       water or groundwater.
                                                                             included in Appendix F for
including downstream aquatic,
                                                                             further details.
riparian, wetland and terrestrial
ecosystems.                          AO13.2                                  AO13.2 Complies

                                     Developments located on                 In support of the proposal, a
                                     groundwater recharge or                 Dewatering Management Plan
                                     discharge areas are designed            has been prepared to identify
                                     and managed in accordance with          and mitigate any impacts from
                                     a groundwater recharge and              discharge of extracted
                                     discharge management plan               groundwater from the site.
                                     prepared by a suitably
                                                                             Please refer to the Dewatering
                                     experienced and qualified
                                                                             Management Plan included in
                                     groundwater hydrologist. The
                                                                             Appendix H for further details.
                                     groundwater recharge or
                                     discharge must demonstrate that
                                     the development does not affect
                                     groundwater balances beyond
                                     the property boundaries.

                                    Editor's Note— PSP6 Engineering
                                    Design Standards - Roads, drainage and
                                    earthworks provides guidance on
                                    prepare a groundwater recharge and
                                    discharge plan.

Construction and establishment of stormwater management systems




                                                                                                                  8

Page 40

Performance Outcomes                  Acceptable Outcomes                     Response

PO14                                  AO14.1                                  PO14 Complies

Construction methods provide for      An erosion and sediment control         The proposal will implement
appropriate controls to avoid         plan prepared in accordance with        appropriate construction methods
entry and transport of litter,        the International Erosion Control       to ensure that works are
sediment, and associated              Association Best Practice Books         undertaken to mitigate impacts
prescribed water contaminants         demonstrates that the capture           into receiving waters including
into receiving waters.                and release of stormwater               transport of litter, sediment and
                                      achieves the design objectives          other contaminants.
                                      listed in Table A: Construction
                                                                              A reasonable and relevant
Editor's note— Water contaminants     phase – stormwater
                                                                              condition can be imposed to
are prescribed in the Environmental   management design objectives
                                                                              ensure that the construction
Protection Act 1994.                  of the State Planning Policy
                                                                              methods implemented are
                                      (Appendix 2).
                                                                              appropriate and in accordance
                                      Editor’s note— PSP6 Engineering         with the requirements of the
                                      Design Standards - Roads, drainage      Environmental Protection Act
                                      and earthworks provides guidance on     1994.
                                      requirements for preparing an Erosion
                                      Management Plan.


                                      AO14.2

                                      Construction works are designed
                                      and managed to restrict the
                                      extent of clearing and soil
                                      exposure to the minimum
                                      necessary for access, and safe
                                      construction at any one time.

                                      AO14.3

                                      For buildings:

                                          a) upstream runoff is
                                             diverted around the
                                             construction site;
                                          b) sediment barriers are
                                             provided downslope of
                                             disturbed areas to
                                             prevent sediment
                                             washing into gutters,
                                             drains and waterways ,
                                             wetlands or drainage
                                             lines either on or off the
                                             site; and
                                          c) temporary or permanent
                                             downpipes are
                                             connected to the




                                                                                                                  9

Page 41

Performance Outcomes                     Acceptable Outcomes                 Response

                                                stormwater system
                                                before laying the roof; or
                                             d) localised erosion is
                                                avoided by directing flow
                                                from downpipes over
                                                non-erosive areas.

                                         AO14.4

                                         Chemical flocculants used as
                                         part of an erosion and sediment
                                         control plan do not harm the
                                         environmental values within
                                         receiving waters.

                                         AO14.5

                                         Appropriately sized litter
                                         containment areas, with provision
                                         for sorting recyclables are
                                         provided for the type of litter
                                         expected to be generated onsite.

Wastewater management and effluent disposal

PO15                                     A015                                Not Applicable

Development does not discharge           Wastewater (non-sewage)             The proposal site is connected to
wastewater unless it can be              generated from the development      the sewer network and does not
demonstrated to not compromise           is collected and contained          involve on-site wastewater
environmental values of waters           on-site, and is:                    management systems or effluent
and water quality objectives.                                                treatments requiring separate
                                             a) lawfully disposed to
                                                                             discharge requirements.
Editor’s Note—Environmental values              sewer; or
of waters and water quality objectives       b) transferred off-site for
are prescribed in Schedule 1 of the             treatment/disposal to an
Environmental Protection (Water)                appropriately licenced
Policy 2009.                                    facility;
                                             c) reused on-site in a
                                                closed-cycle irrigation
                                                scheme, industrial
                                                processes, washing or
                                                cleaning or other
                                                purpose; or
                                             d) treated to meet the
                                                drinking water supply
                                                environmental values
                                                prior to release.

                                         Editor’s Note—The Plumbing and
                                         Drainage Act 2003 sets out




                                                                                                             10

Page 42

Performance Outcomes              Acceptable Outcomes                      Response

                                  requirements for wastewater
                                  management.




PO16                              A016

On-site effluent treatment and    An onsite effluent system and
disposal systems are designed,    disposal area is:
constructed and managed to not
                                       a) not located on a slope
compromise the environmental
                                          greater than 1 in (10%);
values of waters and water
                                       b) not located at or below
quality objectives.
                                          the 1% annual
                                          exceedance probability
                                          (AEP flood event);
                                       c) not located within a
                                          riparian buffer area
                                          mapped on a
                                          Biodiversity, Waterways
                                          and Wetlands Overlay
                                          Map; and
                                       d) setback 400 metres
                                          minimum from the full
                                          supply level of Lake
                                          Macdonald.

                                 Editor’s Note—The Plumbing and
                                 Drainage Act 2003 sets out
                                 requirements for on-site effluent
                                 treatment and disposal. The Queensland
                                 Plumbing and Wastewater Code and
                                 associated guidelines are used to
                                 confirm the suitability of each site to
                                 accommodate an on-site sewerage
                                 facility; or where a centrally located
                                 group collection treatment system is
                                 proposed, confirmation as to the
                                 suitability of the designated site to
                                 accommodate the on-site sewerage
                                 facility. Additionally, where the
                                 combined total peak design capacity of
                                 effluent treatment is less than 21
                                 equivalent persons, the design of the
                                 system achieves a low to medium risk
                                 classification in accordance with
                                 Seqwater’s Land Use Risk Tool for
                                 onsite sewerage facilities.




                                                                                      11

Page 43

9.4.2 EARTH WORKS CODE
Table 9.4.2.3 Criteria for assessment

 Performance Outcomes                  Acceptable Outcomes                     Response

 Assessable development

 Effects of Works

 Drainage                              AO1                                     AO1 Complies

 PO1                                   Filled or excavated areas have a        The proposal ensures that the
                                       minimum gradient of 0.5% and            excavation works result in a
 Finished surface levels ensure
                                       drain to Council’s stormwater           minimum gradient of 0.5% and
 land is free draining.
                                       infrastructure where available, or      drain to Council’s stormwater
                                       where stormwater infrastructure         infrastructure where available.
                                       is not available, toward the
                                       street.

 Hydraulics                            No acceptable outcome provided          PO2 Complies

 PO2                                                                           The proposal involves
                                                                               excavation to facilitate the
 Change to the levels on site do
                                                                               basement level that is located
 not have an adverse impact on
                                                                               wholly below the built form
 the flooding and drainage
                                                                               envelope. The ground level
 characteristics off-site.
                                                                               around the perimeter of the site
                                                                               beyond the footprint of the
                                                                               dwelling will remain relatively
                                                                               undisturbed.

                                                                               The proposal will not result in
                                                                               variations to the levels of the
                                                                               site that would result in impacts
                                                                               to flooding and drainage.

 Geotechnical considerations           AO3.1                                   Not Applicable

 PO3                                   Filling works are undertaken in         The proposal does not involve
                                       accordance with Council’s               fill works as a part of this
 Earthworks do not result in
                                       Planning Scheme Policy PSP6             application.
 geotechnical instability on-site or
                                       Engineering design standards -
 to nearby premises.
                                       roads, drainage and earthworks.

                                       AO3.2                                   Not Applicable

                                       Where the filling is for residential,   The proposal does not involve
                                       commercial or industrial                fill works as a part of this
                                       purposes the works comply with          application.

Page 44

Performance Outcomes                Acceptable Outcomes                 Response

                                    Australian Standard - Guidelines
                                    for earthworks on commercial &
                                    residential development.

Local Amenity                       AO4.1                               AO4.1 Can Comply

PO4                                 The following control measures      The proposal involves
                                    are implemented—                    earthworks and specifically
Undertaking earthworks does not
                                                                        excavation works to establish
adversely impact on the amenity         a) regular water spraying of
                                                                        the basement level. Appropriate
of the local area by way of dust,          exposed areas to
                                                                        measures will be undertaken
noise or visual amenity.                   suppress dust;
                                                                        through the earthworks and
                                        b) provision of dust            construction phase to ensure
                                           stabilised or sealed         that the impacts of dust, noise
                                           internal roads;              or visual amenity are mitigated.

                                        c) protective covering of       Council can impose a
                                           exposed areas that are       reasonable and relevant
                                           left for more than 2         condition to ensure that
                                           weeks; and                   reasonable control measures
                                                                        are implemented.
                                        d) unless a development
                                           permit provides
                                           otherwise, disturbed
                                           areas are revegetated
                                           using species identified
                                           in Council's Planning
                                           Scheme Policy PSP2
                                           Landscaping.

                                    AO4.2                               AO4.2 Complies

                                    Earthworks are undertaken only      Any earthworks undertaken as
                                    during the hours of 7:00am to       a part of this application will
                                    6:00pm, Monday to Friday and        occur during the hours of
                                    7:00am to 3:00pm on Saturday.       7:00am to 6:00pm, Monday to
                                    No work is undertaken on            Friday and 7:00am to 3:00pm
                                    Sunday or public holidays.          on Saturday. No work is
                                                                        undertaken on Sunday or public
                                                                        holidays.

Vegetative Waste                    AO5.1                               AO5.1 Complies

PO5                                 Cleared vegetation is transported   Any cleared vegetation
                                    off-site for disposal in an         associated with the
Vegetation cleared from a
                                    approved green waste disposal       development will be removed
development site is disposed of
                                    facility.                           off-site and disposed of
in an environmentally responsible
                                                                        appropriately.
manner.                             AO5.2




                                                                                                           2

Page 45

Performance Outcomes                  Acceptable Outcomes                     Response

                                      Cleared vegetation is mulched           However, the proposal will seek
                                      on-site and reused for                  to retain significant existing
                                      landscaping of the finished             vegetation along the
                                      development.                            boundaries of the site where
                                                                              possible.
                                      AO5.3

                                      Cleared vegetation is disposed of
                                      for the purpose of firewood.

                                      AO5.4

                                      Disposal of vegetative waste by
                                      burning off is avoided.

Managing contamination risk           AO6.1                                   Not Applicable

PO6                                   Fill material is solid clean earth,     The proposal does not involve
                                      free of putrescible or refuse           fill works as a part of this
Materials used as fill are suitable
                                      material, vegetation, acid sulfate      application.
for development and future use
                                      soils, building or construction
of the land and filling or
                                      material or other material or
excavation works do not result in
                                      contaminants.
the contamination of land.
                                      AO6.2                                   AO6.2 Complies

                                      The site is not on the                  The proposal site is not on the
                                      contaminated land register.             contaminated land register.

Haulage activity and amenity          No acceptable outcome provided          PO7 Complies

PO7                                                                           The proposal will ensure that
                                                                              the haulage of material to and
Haulage of material to and from a
                                                                              from a site ensures that there
site ensures—
                                                                              are minimal disturbances to
    a) minimal disturbance to                                                 neighbouring properties and
       neighbouring properties                                                that no Council road
       and properties along the                                               infrastructure including
       haulage route; and                                                     pavements are adversely
                                                                              affected.
    b) Council’s road
       infrastructure including
       pavements is not
       adversely affected.

Extent of earthworks                  AO8                                     AO8 Complies

PO8                                   All earthworks, including cut and       The proposal will ensure that
                                      fill batters, retaining walls and the   any earthworks associated with
The layout of the development
                                      like are contained within the           the development are contained
provides adequate, clearly
                                      subject site.                           within the subject site.
defined and easily accessible—




                                                                                                                3

Page 46

Performance Outcomes                Acceptable Outcomes                   Response

    a) on-site vehicle parking
       and manoeuvring areas;
       and

    b) loading and manoeuvring
       areas for delivery and
       service vehicles.

PO9                                 AO9                                   PO9 Complies

On sloping sites development        Cut or fill is less than 1.5 metres   The proposal involves
follows the natural landform        in depth relative to the natural      excavation to a depth of
wherever practical and              ground level.                         approximately 3.8m to facilitate
excavation or filling is minimal.                                         the basement of the dwelling
                                                                          house, therefore a Performance
                                                                          Outcome is sought.

                                                                          The proposal has been
                                                                          designed to ensure that the
                                                                          built form is commensurate to
                                                                          the natural landform from the
                                                                          street level.

                                                                          Please refer to Section 6 of the
                                                                          Town Planning Report for
                                                                          further details.

Infrastructure protection           No acceptable outcome provided        PO10 Complies

PO10                                                                      The proposal will ensure that
                                                                          any earthworks associated with
Earthworks and vehicular access
                                                                          the development and vehicular
do not adversely impact on the
                                                                          access do not adversely impact
capacity, operations and
                                                                          on the capacity, operations and
maintenance of existing
                                                                          maintenance of existing
infrastructure.
                                                                          infrastructure.

                                                                          Further, the proposal utilises
                                                                          the existing vehicle crossover
                                                                          location at Noosa Parade.

Environmental protection            No acceptable outcome provided        PO11 Complies

PO11                                                                      The proposal will ensure that
                                                                          earthworks minimise any
Earthworks minimise any
                                                                          adverse impact upon
adverse impact upon
                                                                          groundwater, watercourses,
groundwater, watercourses,
                                                                          drainage lines, wetlands, and
drainage lines, wetlands, and
                                                                          native vegetation.
native vegetation.

Dams                                AO12.1                                Not Applicable




                                                                                                             4

Page 47

Performance Outcomes              Acceptable Outcomes                Response

PO12                              Where the site is in the Rural     The proposal site is not located
                                  zone—                              within a Rural zone.
Dam location and construction
does not impact upon                a) the land has a slope of
neighbouring properties or road        less than 25% (1:4);
reserves, in terms of—
                                    b) the earthworks including
    a) hydrology;                      cut and fill batters and
                                       retaining walls are setback
    b) alteration of existing
                                       a minimum of 50 metres
       overland flow paths and
                                       from the property
       patterns;
                                       boundary; and
    c) landslide or failure of
                                    c) the size of the lot is
       dam wall; and
                                       greater than 5 hectares.
    d) effluent disposal areas.
                                  AO12.2                             Not Applicable

                                  Where the site is in the Rural     The proposal site is not located
                                  residential zone or the Rural      within a Rural residential zone
                                  zone and the lot is less than 5    or a Rural zone.
                                  hectares:

                                      a) the land has a slope of
                                         less than 1:6;

                                      b) the earthworks including
                                         cut and fill batters and
                                         retaining walls are
                                         setback a minimum of 20
                                         metres from the property
                                         boundary; and

                                      c) the dam work involves
                                         less than 500m³ of
                                         material.

                                  AO12.3                             Not Applicable

                                  For all other zones—               The proposal does not involve a
                                                                     dam.
                                  No acceptable outcome provided




                                                                                                        5

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.