Appendix D - Noosa Plan 2020 Assessment
Plans and drawings: the text below has words only, no drawings.
Performance Outcomes Acceptable Outcomes Response
(b) increase the number of
people likely to need
evacuation;
(c) shorten flood warning
times for other uses in
the floodplain; or
(d) impact on the ability of
traffic to use evacuation
routes, or unreasonably
increase traffic volumes
on evacuation routes.
AO7.3
Materials stored on site:
(a) are readily able to be
moved in a flood event to
a flood free area; or
(b) are contained in order to
minimise movement in
times of flood.
Editor's Note— Businesses
should ensure that necessary
emergency and continuity plans
are in place to account for the
potential need to evacuate
personnel and to relocate
property prior to a flood event.
Essential network infrastructure
PO8 AO8 AO8 Complies
Essential network infrastructure Essential network infrastructure All essential infrastructure that is
maintains effective function that is likely to fail to function or subject to fail in the event of flood
during and immediately after flood may result in contamination when water inundation is designed
and storm tide inundation events. inundated by flood water (e.g. appropriately or located above
water supply pipeline air valves the DFE.
and the like) is located above the
DFE level (or where the DFE has
not been modelled for the area,
above the highest recorded flood
level for the area).
Essential community infrastructure
PO9 AO9.1 Not Applicable
Essential community Essential community The proposal is for a dwelling
infrastructure is able to function infrastructure is sited and house and does not involve
constructed to ensure that flood
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.