Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Appendix D - Noosa Plan 2020 Assessment

of 47

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Performance Outcomes                 Acceptable Outcomes                 Response

                                         (b) increase the number of
                                             people likely to need
                                             evacuation;
                                         (c) shorten flood warning
                                             times for other uses in
                                             the floodplain; or
                                         (d) impact on the ability of
                                             traffic to use evacuation
                                             routes, or unreasonably
                                             increase traffic volumes
                                             on evacuation routes.


                                     AO7.3
                                     Materials stored on site:
                                         (a) are readily able to be
                                             moved in a flood event to
                                             a flood free area; or
                                         (b) are contained in order to
                                             minimise movement in
                                             times of flood.


                                     Editor's Note— Businesses
                                     should ensure that necessary
                                     emergency and continuity plans
                                     are in place to account for the
                                     potential need to evacuate
                                     personnel and to relocate
                                     property prior to a flood event.
Essential network infrastructure

PO8                                  AO8                                 AO8 Complies
Essential network infrastructure Essential network infrastructure All essential infrastructure that is
maintains effective function       that is likely to fail to function or subject to fail in the event of flood
during and immediately after flood may result in contamination when water inundation is designed
and storm tide inundation events. inundated by flood water (e.g.         appropriately or located above
                                   water supply pipeline air valves the DFE.
                                   and the like) is located above the
                                   DFE level (or where the DFE has
                                   not been modelled for the area,
                                   above the highest recorded flood
                                   level for the area).
Essential community infrastructure

PO9                                  AO9.1                               Not Applicable
Essential community                  Essential community                 The proposal is for a dwelling
infrastructure is able to function   infrastructure is sited and         house and does not involve
                                     constructed to ensure that flood
                                                                                                             5
Log in to download the original file

Appendix D - Noosa Plan 2020 Assessment.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.