Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Appendix D - Noosa Plan 2020 Assessment

of 47

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Performance Outcomes                Acceptable Outcomes                 Response

                                    Australian Standard - Guidelines
                                    for earthworks on commercial &
                                    residential development.

Local Amenity                       AO4.1                               AO4.1 Can Comply

PO4                                 The following control measures      The proposal involves
                                    are implemented—                    earthworks and specifically
Undertaking earthworks does not
                                                                        excavation works to establish
adversely impact on the amenity         a) regular water spraying of
                                                                        the basement level. Appropriate
of the local area by way of dust,          exposed areas to
                                                                        measures will be undertaken
noise or visual amenity.                   suppress dust;
                                                                        through the earthworks and
                                        b) provision of dust            construction phase to ensure
                                           stabilised or sealed         that the impacts of dust, noise
                                           internal roads;              or visual amenity are mitigated.

                                        c) protective covering of       Council can impose a
                                           exposed areas that are       reasonable and relevant
                                           left for more than 2         condition to ensure that
                                           weeks; and                   reasonable control measures
                                                                        are implemented.
                                        d) unless a development
                                           permit provides
                                           otherwise, disturbed
                                           areas are revegetated
                                           using species identified
                                           in Council's Planning
                                           Scheme Policy PSP2
                                           Landscaping.

                                    AO4.2                               AO4.2 Complies

                                    Earthworks are undertaken only      Any earthworks undertaken as
                                    during the hours of 7:00am to       a part of this application will
                                    6:00pm, Monday to Friday and        occur during the hours of
                                    7:00am to 3:00pm on Saturday.       7:00am to 6:00pm, Monday to
                                    No work is undertaken on            Friday and 7:00am to 3:00pm
                                    Sunday or public holidays.          on Saturday. No work is
                                                                        undertaken on Sunday or public
                                                                        holidays.

Vegetative Waste                    AO5.1                               AO5.1 Complies

PO5                                 Cleared vegetation is transported   Any cleared vegetation
                                    off-site for disposal in an         associated with the
Vegetation cleared from a
                                    approved green waste disposal       development will be removed
development site is disposed of
                                    facility.                           off-site and disposed of
in an environmentally responsible
                                                                        appropriately.
manner.                             AO5.2




                                                                                                           2
Log in to download the original file

Appendix D - Noosa Plan 2020 Assessment.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.