As a result of the proposed changes the following conditions require changing:

Condition 3 of the MCU and Condition 1 of the OPW requires amending to reflect the changes
and sought to read as follows.

MCU – 3. Development authorised by this approval must be undertaken generally in accordance with the
Approved Plans listed in the table below.
        Plan No.         Rev.      Plan/Document Name                                   Date
      A01            G           Site Plan, prepared by Ellia                         20.09.24
      A02            G           Half Basement, prepared by Ellia                     20.09.24
      A03            G           Ground Floor, prepared by Ellia                      20.09.24
      A04            G           Level One, prepared by Ellia                         20.09.24
      A05            G           Level Two, prepared by Ellia                         20.09.24
      A06            G           Level Three, prepared by Ellia                       20.09.24
      C2.0           G           Elevation, prepared by Ellia                         20.09.24
      C2.1           G           Elevation, prepared by Ellia                         20.09.24
      C2.2           G           Elevation, prepared by Ellia                         20.09.24
      C2.3           G           Elevation, prepared by Ellia                         20.09.24
      C3.0           G           Section 1, prepared by Ellia                         20.09.24
      C3.1           G           Section 2, prepared by Ellia                         20.09.24
      C3.2           G           Section 3, prepared by Ellia                         20.09.24
      C3.3           G           Section 4, prepared by Ellia                         20.09.24
      C3.4           G           Section 5, prepared by Ellia                         20.09.24


OPW – 1. Development authorised by this approval must be undertaken generally in accordance with the
Approved Plans listed in the table below. The approved plans are listed in the following table unless
otherwise amended by these conditions.
        Plan No.         Rev.     Plan/Document Name                                        Date
      C01            C          General Notes prepared by HR Design                       18/09/24
      C02            C          Site Plan prepared by HR Design                           18/09/24
      C03            C          Finished Grading Plan prepared by HR Design               18/09/24
      C04            C          Cut Fill Plan prepared by HR Design                       18/09/24
      C05            C          Pavement Plan prepared by HR Design                       18/09/24
      ED     22266   G          Site Layout Plan prepared by Element Design               23/09/24
      OPW – 01
      ED     22266   G          Planting Plan (Ground Level) prepared by Element Design   18/09/24
      OPW – 02
      ED     22266   G          Planting Plan (Levels 01 & 04) prepared by Element        18/09/24
      OPW – 03                  Design
      ED     22266   G          Details Plan prepared by Element Design                   18/09/24
      OPW – 04
      ED     22266   G          Plant List & Specification Plan prepared by Element       18/09/24
      OPW – 05                  Design


If you have any further queries in relation to the above, please do not hesitate to contact myself.

Regards,




Jack Lewis B.Sc Hons UNSW M.Plan Otago MPIA
Planner/Director
Pivotal Perspective Pty Ltd
0406 334 227

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Request report henderson st sunshine .pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.