2015-11-16 GC Agenda - Item 3, Attach 1 - Annual Report 2014-15

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                                                                                                 QAO
                                                                                                                          certified statements



NOOSA SHIRE COUNCIL

Notes to the financial statements
For the year ended 30 June 2015
  14 Fair value measurements continued

     Infraslructure A.sets (Ieve! 3)
     Due to the specialised nature of Council's infrastructure assets and the services they provide, there is
     no active measurable market. The fair value of all infrastructure assets is determined on the basis of
     replacement of a new asset or modern equivalent.

     Current Replacement Cost (CRG) is measured by reference to the lowest cost at which the gross economic
     benefits of the asset could be obtained in the normal course of business. Where existing assets were
     over designed. had excess capacity or where redundant an adjustment was made so that the resulting
     valuation reflected the cost of replacing the existing economic benefits based on an efficient set of
     modern equivalent assets to achieve the required level of service output within the Councils planning horizon.

     Infrastructure assets are comprehensively revalued every three to five years. based on component unit
     rates developed in line with asset renewal methods.

     Specific valuation techniques used to value Council infrastructure           assets comprise:
     Road and Bridge Network • current replacement cost

     Roads
     Road and bridge infrastructure was comprehensively valued by independent valuer Aurecon Australia Pty ltd
     as at 30 June 2014.

     The valuation technique used to determine fair value is essentially based on price modelling of the fair
     value through 'Level 3' unobservable inputs. These include a variety of sources to obtain the best information
     available for each asset type, including actual contract prices or supply quotes for similar assets.

    The unit rates were predominantly developed from first principles by estimating the plant, material and labour
    required for asset replacement. The base rates were sourced from local suppliers estimates and quotes,
    contract schedules for work recently completed and council records. Where costs have not been readily
    available then rates were obtained from Aurecon's cost database or the Rawlinson 2014 edition of the
    Australian Construction Handbook.

    Council uses 3 distinct location factors categorising its road infrastructure into urban, rural and commercial!
    industrial. Roads are further categorised as sealed or unsealed and managed in segments. All road
    segments are then further componentised into the sub classes of assets that make up each segment, i.e.
    Road Surface, Road pavement - base, Road pavement - sub-base, Road shoulder, Formalion, Kerbs, footpaths
    etc. Each asset unit rate is determined on cost to construct, material type and useful life to facilitate valuation
    and depreciation.

    A review of market data obtained from the Australian Bureau of Statistics, Queensland Roads and Bridges
    Index rates for the period 30 June 2014 to 30 June 2015 shows no significant material changes and therefore
    the values are considered still at fair value. As a result of this, no indexation has been applied to this class.

    Accumulated Depreciation
    In determining the level of accumulated depreciation, roads are disaggregated into significant components
    which exhibit different useful lives. Useful lives are an estimate of the total service capacity in years for that
    type of asset.

    Bridges
    A full valuation of bridges assets was undertaken by independent valuers, Aurecon Australia Ply ltd
    effective 1 January 2014. All bridges, with exception to 3 major bridges, were valued based on unit rates
    developed according to varying material types used for construction, the deck area, size and length.
    Construction estimates were determined on a similar basis to roads. Significant bridge structures were
    individually assessed by Aurecon Australia Ply Ltd.

   A review of market data obtained from the Australian Bureau of Statistics, Queensland Roads and Bridges
   Index rates for the period 30 June 2014 to 30 June 2015 shows no significant material changes and therefore
   the values are considered still at fair value. As a result of this. no indexation has been applied.




                                                                       Page 25
Log in to download the original file

2015-11-16 GC Agenda - Item 3, Attach 1 - Annual Report 2014-15(PDF, 15MB).pdf · 15.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.