Original source · versioned page text
2015-11-16 GC Agenda - Item 3, Attach 1 - Annual Report 2014-15
The original of this document is very large (15.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Corporate Plan Priority 4 – Focus on Community Assets
The Council’s focus will be on maintaining and renewing existing assets rather than building new
assets. In the short term, there will be a strong focus on undertaking condition assessments and
developing long-term Asset Management Plans.
Key achievements include:
The rollout of the 2014/15 Capital Works Program took longer to establish than we had planned. There
were initial delays in finalising detailed designs after the capital program was adopted as part of the
2014/15 Budget. This was probably not unexpected given that we were only 6 months old at the time
and had no historic designs / plans available. But it did take some time to gather traction in the delivery
of the 2014/15 Capital Works Program.
By year-end, when taking into account completed capital works and committals, the Capital Works
Program was 68% complete or, if three major projects carried over into 2015/16 are excluded, then the
completion rate was 82%.
Some of the significant capital works projects achieved in 2014/15 included:
o reseal of Walter Hay Drive
o work on the Daintree Estate, Tewantin flood mitigation project (substantially underway)
o bus stop design and stage 1 rollout
o other road reseals including Gibson Road, Noosaville and David Low Way, Sunrise Beach, and
o Cooran sports field lights.
Council has developed a plant and fleet program to enable it to better plan and manage its future
requirements. This plan includes a three-year injection of funding to bring Council’s fleet and plant up to
standard following the transfer of older items of plant during de-amalgamation. Innovation was also
evident in November 2015 when Council was able to secure a good quality, second-hand John Deere
670 GP Grader. By being able to move quickly to secure this item of plant, substantial savings were
achieved. Other significant items of plant have also been replaced including a new beach cleaner.
Council has adopted a number of policies and actions to assist in better managing community assets.
These include:
o Asset Management Policy, and
o Community Purpose Land and Infrastructure Tenure Policy.
Corporate Plan Priority 5 – Establishing new Policies and Strategies
As a Council, we will need to develop a range of policies and strategies that set the path for future
Noosa Councils. There are a number of strategies and policies to be reviewed and developed that
will set the strategic direction for the future.
Key achievements include:
Council established a new set of local laws and subordinate local laws after undertaking an extensive
community consultation campaign. The new local laws came into effect on 1 July 2015 with a smooth
transition.
The vast majority of policies that required review following the de-amalgamation process were completed
during 2014/15. Many of these were governance-type policies that are important from a governance and
compliance perspective. These include
o Public Interest Disclosure Policy
o Contact with Lobbyists Policy, and
o Public Officials Complaints Policy.
At the same time, all of Council’s delegations were reviewed and updated.
Noosa Council Annual Report 2014/15 Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.