Original source · versioned page text
O2 stormwater Report Rev Oct 2015
Attached to the e-mail MCU14/0039 - Response to Information Request.
10 10 10
TSS log values TP log values TN log values
Land Use Flow Type
Mean St. dev. Mean St. dev. Mean St. dev.
Baseflow 0.51 0.28 -1.79 0.28 -0.59 0.22
Forest
Stormflow 1.90 0.20 -1.10 0.22 -0.075 0.24
Baseflow 1.00 0.13 -1.155 0.13 -0.155 0.13
Agriculture
Stormflow 2.477 0.31 -0.495 0.30 0.29 0.26
Baseflow 1.00 0.34 -0.97 0.31 0.20 0.20
Road
Stormflow 2.43 0.39 0.30 0.31 0.26 0.23
4.3.5. Regional MUSIC Model Layout
The MUSIC model produced to analyse the proposed development is shown in Figure 7.
Figure 7 - MUSIC Model Layout.
4.3.6. Modelling Results
The results of the MUSIC analysis for the total catchment are reported in Table 6.
Table 6 – Results from MUSIC Modelling.
Pollutant Pollutant Load
Flow (ML/yr) 29,500
Total Suspended Solids (kg/yr) 8,420,000
Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive Page 10
D’VINERIPE
R003370a
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.