O2 stormwater Report Rev Oct 2015
Attached to the e-mail MCU14/0039 - Response to Information Request.
The following recommendations are made in relation to the site and operation of the tomato farm within
the proposed 140m x 144m greenhouse:
All exposed surfaces should be stabilised with either a vegetative cover (i.e. turf or topsoil and
hydromulch), or mulching. Ideally, access tracks around the site will also be stabilised using gravel
sheeting (refer Main Roads Specification Type 2.3).
Any future works for the site will require an ESCP to be developed for the project, and
To achieve the relevant load based reduction targets, a media filtration system of 400m² filter area
is required.
Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive Page 25
D’VINERIPE
R003370a
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.