Skip to the record
Beware of cheap imitations.

Original source · versioned page text

O2 stormwater Report Rev Oct 2015

Attached to the e-mail MCU14/0039 - Response to Information Request.

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

The following recommendations are made in relation to the site and operation of the tomato farm within
the proposed 140m x 144m greenhouse:

        All exposed surfaces should be stabilised with either a vegetative cover (i.e. turf or topsoil and
         hydromulch), or mulching. Ideally, access tracks around the site will also be stabilised using gravel
         sheeting (refer Main Roads Specification Type 2.3).
        Any future works for the site will require an ESCP to be developed for the project, and
        To achieve the relevant load based reduction targets, a media filtration system of 400m² filter area
         is required.




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                               Page 25

D’VINERIPE
R003370a
Log in to download the original file

O2 stormwater Report Rev Oct 2015.pdf · 9.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.