Skip to the record
The gold standard in government transparency.

Original source · versioned page text

O2 stormwater Report Rev Oct 2015

Attached to the e-mail MCU14/0039 - Response to Information Request.

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

  1.            Introduction
O2 Environment + Engineering (O2) has been commissioned by D’VINERIPE to develop a Stormwater
Management Plan (SMP) for the tomato farm located at Lot 1 on SP108094, 305 Lake Macdonald Drive,
Qld.

The purpose of this document is to clearly present the SMP specifically designed to address issues raised in
Show Cause Notice COM14/0133, and Information Request 01569 issued by Noosa Council.

The regional location of the project area is presented in Figure 1.

1.1.          Objective
The objective of this report is to address Points 8 and 9 of Show Cause Notice issued by Noosa Council on
April 29, 2015 and Points 3 and 4 of Information Request (IR) issued by Noosa Council on June 25, 2014.
The IR, application number: MCU14/0039, is in response to the proposal for a development permit for
Material Change of Use – Cultivation Type 2 (Intensive Greenhouses).




Figure 1 - Site Location




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                              Page 1

D’VINERIPE
R003370a
Log in to download the original file

O2 stormwater Report Rev Oct 2015.pdf · 9.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.