O2 stormwater Report Rev Oct 2015
Attached to the e-mail MCU14/0039 - Response to Information Request.
1. Introduction O2 Environment + Engineering (O2) has been commissioned by D’VINERIPE to develop a Stormwater Management Plan (SMP) for the tomato farm located at Lot 1 on SP108094, 305 Lake Macdonald Drive, Qld. The purpose of this document is to clearly present the SMP specifically designed to address issues raised in Show Cause Notice COM14/0133, and Information Request 01569 issued by Noosa Council. The regional location of the project area is presented in Figure 1. 1.1. Objective The objective of this report is to address Points 8 and 9 of Show Cause Notice issued by Noosa Council on April 29, 2015 and Points 3 and 4 of Information Request (IR) issued by Noosa Council on June 25, 2014. The IR, application number: MCU14/0039, is in response to the proposal for a development permit for Material Change of Use – Cultivation Type 2 (Intensive Greenhouses). Figure 1 - Site Location Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive Page 1 D’VINERIPE R003370a
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.