Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

O2 stormwater Report Rev Oct 2015

Attached to the e-mail MCU14/0039 - Response to Information Request.

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

     In addition to the reduced nutrient loads now being applied at the site, the operators have the ability
     to remove the nutrient rich irrigation water from the greenhouse. Irrigation can be halted, and the
     runoff pumped back to the holding tank. Fresh water can then be used to flush the growbags and again
     pumped back to a holding tank. This can be undertaken within a period of approximately 3 – 4 hours
     and therefore allows the operators to extract the nutrient rich runoff in the event of a major flood
     event.




Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive                              Page 4

D’VINERIPE
R003370a
Log in to download the original file

O2 stormwater Report Rev Oct 2015.pdf · 9.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.