Original source · versioned page text
Attachment 10 - Infrastructure Agreement DRAFT
THIS DEED is made on the date stated in item 1.
BETWEEN The Council
AND the Owner
RECITALS
A The owner has obtained various approvals (21675 DA) in order to construct and
operate an aged care facility on the Subject Site.
B The owner has also obtained an approval (RM2022/09056 dated 7 June 2022 and
see also RM2020/53583 dated 7 October 2020) for the clearing of vegetation for a
buffer zone for fire mitigation and an access track on the Council Land. The owner
has agreed to undertake the following on the Council Land for the period that the
aged care facility is being operated on the Subject Site and on the terms set out in
this deed:
(i) construct the access track crossing, refer to drawings STP21-1452 C100A,
C101A, C301A, C302A dated 8 February 2022 prepared by STP
Consultants;
(ii) maintain the access track (including crossing); and
(iii) maintain the vegetation buffer zone along the north-eastern and south-
eastern boundary of the Subject Site, refer to RM2022/09056 dated 7 June
2022 and see also RM2020/53583 dated 7 October 2020:
(a) north-eastern boundary: maximum total width of 20m comprising
15m as a fire access trail / fuel free zone width and 5m fuel
reduction zone width;
(b) south-eastern boundary: maximum total width of 15m comprising a
15m fuel free zone width.
IT IS AGREED
1. INTERPRETATION
1.1 Nature of Deed
This deed accords with Clause 2.
1.2 Commencement
This deed commences on the Commencement Date.
1.3 Interpretation
(a) In this deed, unless a contrary intention appears, reference to:
(i) a clause is to a clause in this deed; and
(ii) the singular includes the plural and vice versa; and
(iii) any gender includes all other genders; and
3 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original