Attachment 6 - UnityWater Concurrence Agency Referral
NOTE:
UNITY WATER
A THE BUILDER SHALL ALLOW FOR CUT & REMOVAL
.0m
MAINTENANCE HOLE 03 B OF ALL ENCROACHING TREE ROOTS TO FACILITATE
RL:25
ASSET: 2665943 03 BORED PIER FOOTINGS.
S.L: 25.23m
C
RW1-1800 HT 03
I.L: 23.35m
RW1-1600 HT MAX RW NEW CONCRETE SLEEPER
RETAINING WALL WITH 1m D
BOUNDARY HT FENCE AS DETAILED 03
.0m
BOUNDARY RW2-2400HT
MAX RW
.0m
RL:24
RL:23
SEWER MINIM
UM ALLOWAB
LE CLEARANC
S S
E LINE
S
BOUNDARY RW
S S
S UNITY WATE 2
S
S R ASSET ID:532 SEWER BRIDGING
S 5098 Ø160 PE
RL:26.0m
S
S -1 00 RETICULA FOOTING FB1.
S
TION MAIN A SEWER MINIM
1000
S
MIN
S
S PPROX 7.4% UM ALLOWAB
S
S
S
GRADE. LE CLEARANC
E LINE
SEWER BR
S
RW3 - 240 GING RW.
S
S
SEWER BRIDGING S
1000
S
MIN
S
S
FOOTING FB1. S
S
S
S
S
S
S
UNITY WATER
ID
S
0HT MAX
E1
S
DOWNSTREAM
04 MAINTENANCE HOLE
SB1
ASSET: 2665928
PROPOSED FUTURE D.S IL: 18.70m
EXTENSION
PROPOSED LANDSCAPE DECK
Y
BOUNDAR
PROPOSED LANDSCAPE DECK
RW1 - 160
0HT
EXISTING CONCRETE SHELL
EXISTING 2-STOREY DWELLING SWIMMING POOL EXISTING MASONRY FENCE
TO BE DEMOLISHED AND
HAVE NEW TIMBER FENCE
WITH GATES BY BUILDER.
FOOTING LEGEND: SITE & RETAINING WALL NOTES:
RETAINING WALL LAYOUT PLAN 1:100 @ A3 MARK DESCRIPTION 1. EXISTING BOUNDARIES ARE SHOWN INDICATIVE ONLY.
2. EXISTING SEWER ALIGNMENT IS APPROXIMATE ONLY
ALL DIMENSIONS AND REDUCED LEVELS MUST BE VERIFIED ON-SITE PRIOR TO EXCAVATIONS. RW1 Ø450 x 2000d BORED PIER FOOTING AND REQUIRES ON-SITE VERIFICATION PRIOR TO
1800HT SLEEPER WALL MAX. UNDERTAKING ANY EXCAVATION WORKS.
150 UC 23.4 SOLDIERS @1550crs. 3. ALL LEVELS HAVE BEEN DERIVED BASED ON UNITY
RW2 WATER MAINTENANCE HOLE SURFACE LEVEL DATA
Ø600 x 2600d BORED PIER FOOTING TRANSPOSED FROM BUILDERS ON-SITE LEVEL DATUM
2400HT SLEEPER WALL MAX. ON POOL SHELL COPING BEAM.
150 UC 30.0 SOLDIERS @1550crs. 4. A SITE TOPOGRAPHIC DETAIL SURVEY SHALL BE
RW3 Ø600 x 3000d BORED PIER FOOTING UNDERTAKEN TO VERIFY ALL DESIGN LEVELS IN AHD
PRE-CAST PANEL WALL 2400HT MAX. PRIOR TO UNDERTAKING SITE WORKS.
SEWER BRIDGING RW. 5. ALLOW TO CONSULT WITH ENGINEER AFTER SURVEY
200 UC 46.2 SOLDIERS @2700crs. TO VERIFY CURRENT STRUCTURAL DESIGN.
6. BUILDER SHALL ALLOW FOR TEMPORARY CUT BATTER
FB1 350w X 400d R.C. SHORING WHERE NECESSARY.
SEWER BRIDGING FOOTING BEAM 7. SITE CONTOURS HAVE BEEN DERIVED FROM NOOSA
SHIRE COUNCIL INTERACTIVE MAPPING AND ARE
INTENDED AS A GUIDE ONLY ALLOW TO CONFIRM ALL
LEVELS ON SITE PRIOR TO UNDERTAKING
EXCAVATIONS.
8. ENSURE RW BACKFILL IS FULLY DRAINED.
9. BASES OF ALL EXCAVATIONS MUST BE FREE OF LOOSE
MATERIAL AND WATER PRIOR TO CONCRETE
PLACEMENT.
StructuraLinc Consulting Engineers PROPOSED BOUNDARY RETAINING WALL & LANDSCAPING PROJECT No:
REV DATE DESCRIPTION BY CHKD DRAWING DETAILS DRAWING SCALE uno Lincoln Roberts - CPEng, NER, RPEQ 17393 AT: 10 SURFSIDE COURT, SUNSHINE BEACH 24-29
A 04-10-2024 FOR CONSTRUCTION LR KA DESIGN LR FOR: MR CHARLES MORT 2 of 4
www.structuralinc.com
DRAWN LR ph: 0478 009468
CHECK BY KA DRAWING TITLE: DWG No: REV
e: [email protected]
DATE OCT 2024 RETAINING WALL LAYOUT PLAN 02 A
This drawing is not to be copied or amended without written permission
FOR CONSTRUCTION from StructuraLinc Consulting Engineers
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original