Original source · versioned page text
Compiled Approved Plans - 132002.220285.I (As Published)
The original of this document is very large (51.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn5 NOISE SOURCES/IMPACTS The following sections outline current major noise sources that were identified upon the site visit to have potential impact on site. 5.1 LOADING DOCKS 5.1.1. Trolley Collection During time on site, the following was observed and considered in the assessment in relation to trolley activity: e As advised by the client, trolley collection occurs: o Woolworths " Monday-Saturday from 8am to 9pm «= Sunday from 9am to 6pm o BigW = Monday-Saturday from 9am to 5pm «= Sunday from 10am to 3pm e« Measured trolley activity noise level of 69 dB(A) Leq 5.1.2 Delivery Trucks The following observations were made regarding delivery trucks: « Small to medium sized delivery trucks were present within the loading docks; « No more than one truck in each hour is present at the loading docks; e As advised by the client, the loading dock operational hours are: o Monday to Saturday — 5am to 9pm o Sunday — 8am to 6pm e = Truck (incl. refrigeration truck) idling was only considered to occur in the loading dock during nominal 15minute loading period, and not along the boundaries or at the entrance to the loading docks; « Where trucks enter the site to wait for loading as well as during loading (unless short-time drop- off/pick-up), engines must be turned off; e In the case of refrigeration trucks, these should just come in and leave site after loading as no idling shall be allowed at other times; e Such restrictions should be included if not yet followed (e.g. signs installed at the entry and along the boundaries and within the shopping centre loading docks); and e The modelling assumptions in Section 6.2 show specific activities and types of vehicles in each individual loading dock 5.2 MECHANICAL PLANT Mechanical plant that was observed is indicated in Figure 2 with the noise sources based on the attended measurement results in Table 4. As advised by the client, the operational hours for the mechanical plant are as follows: « Monday to Saturday — 7am to 9pm « Sunday — 8am to 6pm Mechanical plant operational restrictions considered in the modelling are listed in Section 6.2. IMobs\2019\20191414\20191414.3\202110130BA_R9_DA_Noise_lmpact_Assessment.docx 10 Document Set ID: 21711315 Version: 1, Version Date: 24/11/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.