Skip to the record
Every meeting, every word.

Council archive · source document

DOC190912 · OPW12/0365

Attached to the e-mail Development Application for Tree Removal - Form 1 and 6.

of 12

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

Description of attachment or title of attachment Method of lodgement to
assessment manager

 

 

 

 

 

 

 

 

 

AG making this application, | declare that all information in this application is true and correct (note: it is unlawful to
provide faise or misleading information).

 

 

 

Notes for completing this form

Question 8:

© Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for an
application. Section 260(1)(e) of the Sustainable Planning Act z009 provides that if the owner’s consent is required
under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or
include a dectaration by the applicant that the owner has given written consent to the making of the application.

© Owner's consent is not required for a mobile and temporary ERA.

Question 9:

e Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule
14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be
given, and the evidence required, to support the application.

Question 13:

© The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.

¢ The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are
prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:

© The portable long service leave levy need not be paid when the application is made, but the Building and Construction
Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued.

¢ Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For further
information contact QLeave on 1800 803 481 or www.qleave.qld.gov.au.

 

6 Application details—IDAS form 1
Version 1.0 18 December 2009

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

DOC190912.pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.