Council archive · source document
DOC190912 · OPW12/0365
Attached to the e-mail Development Application for Tree Removal - Form 1 and 6.
OIL Table B What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es) CI road works CL] stormwater O water infrastructure C] drainage works C] earthworks | sewerage infrastructure CL] landscaping LC] signage [~ clearing vegetation under the planning scheme C] other—provide details What type of approval is being sought? (if you have indicated multiple works in the above question, please use an attachment to this form to detail each approval request) [development permit C] preliminary approval C] both—specify below Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision) No C] Yes—specify the number of lots being created Are there any current approvals associated with this application? (e.g. material change of use) Gy [_] Yes—provide details below List of approval reference/s Date approved Date approval lapses Confirmation of | Method of lodgement lodgement All applications for operationat works site plans drawn to scale which show the following: [| confirmed e the location and site area of the land to which the application relates (relevant lana) © the north point e the boundaries of the relevant land e the allotment layout showing existing lots, any proposed lots (including the dimensions of those lots), existing or proposed road reserves, building envelopes and existing or proposed open space (note: numbering is required for all lots) 2 Building or operational work assessable against a planning scheme—IDAS form 6 Version 1.0 18 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
DOC190912.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.