° INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Integration of land use and public’ 22. The application involves: (tick the applicable box/es\— * -
, panspo tmeton refer to Guide 23, schedule (J (i) a material change of use assessable against the planning scheme for a purpose
BA of the IPA, & schedule 2 of the IP Regulation. |” mentioned in schedule 13C of the iP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above’, he schedule. .
application triggers referral io QT as a : .
concurrence agency. . L] (ii) reconfiguring a tot—
i [) (a) on land that is completely or partly within a public transport corridor, and the
we ee total number oflots increases; =
: Rare [](b) “on land that is completely or partly within a future public transport corridor or |
cee " . an airport's public safety area:
Cr a BE (J (c) on land that is within 400m of a public passenger transport facility or a future .
tos nn eh nie “s public passenger transport facility, and the total site area is 000m? or greater;
Po eg atdsi y.- (J (d) for a residentiat purpose within the 25 ANEF contour for an airport: .
a othe Se [1 (e) for a residential purpose resulting in 100 or more atlotments.
; oe cates ae |” (7) (ill) operational work assessable against the planning scheme, but not associated with a
won hae LT material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
ate “Pe Ce aS above, on land that— ,
ke “REE ONC RAG cg J (a) is completely or partly within a public transport corridor or a future public -
Se tensport corr a otal
. ieee Se . MERC OS . (J (b) _ will result in work that encroaches into an airport's operational. airspace. © ,
— RET RAE ES! Riv) none ofthe above. = : .
Soe BS Sa IN BE facrons ns Mab rs enananengen ect SoG Sa fetta SHERMER eon rg nent HEN te ote tpn Ansa Ren terentsse ayy
Railway Safety andiefficiency232s.8%] 23. The application involves: (tick the applicable box/es}—
ee EEN ee eset {J (i) a material change of use assessable against the planning scheme for a purpose
“uae vais acal ne NG bcos mentioned in.schedule 13D of the IP Regulation and exceeding the thresholds set by that
_doolealo gaan teas WOU Seas 7 schedule.
. ee ena eg Seas | 0 ii reconfiguring a lot— 7 Se
& i. Wan are Ca) ontand that is completely: or partly within a future public transport corridor,
‘Cue 2 GANS eee future railway land or a railway tunnel easement, .
aT ee te (J (b) on land that is within 400m of a Citytrain passenger railway station or a future.
bgt RTO ee . Citytrain passenger railway station, and the total site area is 5000m? or
RS eS I ieee Ae reater;
. Bh RUN, SERS cee ovat 1 a
Hee SRS oo (4 (c) on tand that abuts rail corridor fand, commercial corridor land or future railway
Yd ROR Teg RRIRIES Dy . _ land, and the total number of lots increases; . ,
Pes Ate aE ~ (1d) on land that abuts rail corridor land, commercial corridor land or future railway
e Se, ser be ote aR _ land and an easement abutting the corridor or future railway land is created;
arama CRE L)(e) on land that is completely or partly within 100m of, and abutting an approach
: Ne be RNR ae aos to, a railway level crossing, and the total number of lots increases;
@ x oe ee [J (f} fora residential. purpose resulting in 100 or more allotments.
2S RE RUD CS Hag Seg hy [_] (iti) operational work assessable against the planning scheme, but not associated with a
TRESS aaa See Pe material change of use mentioned in (i) above or reconfiguring a fot mentioned in (ii)
Poe Paes See) above, involving extracting, excavating or filling greater than 50m’, on land that—
EEE RR Eg ST [J (a) is completely or partly within rail corridor land or commercial corridor land, and
OT Ee CR the work is not for rail transport infrastructure or other rail infrastructure;
aia Be ugh “ry on []{b) is completely or partly within future railway land, or a railway tunnel easement;
ee pg [J (c) abuts rail corridor land, commercial corridor !and or future railway land, and
ee ln , the work is within 25m of the railway boundary.
nT eee [XI (iv) none of the above. .
: Moonie to Brisbane pipeline’ ==“ -'|124. The application involves the easement for the construction or operation of the Moonie to :
For more information refer-to sctiedule 2of.the IP Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
vee wu oi Saino SFiS bbiveh bo - CI (i) a material change of use assessable against the planning scheme and not associated
application taggers teterralto the holder ot - with reconfiguring a lot, and any structure or work will be located wholly or partly in the .
pipeline licence No issued under thé Petroleum easement.
Act 1828, currently Santos QNT Ply Ltd; for oO (ii) reconfiguring alot , :
: (CJ (iii) operational work assessable against the planning scheme, thatis filling, excavation,
' . compaction, drilling, boring or piling not associated with a reconfiguring alot, andthe
work is located wholly or partly in the easement.
TR (iv) none of the above.
. Page 8See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00152058.001.pdfRelated documentPublic source context ↗
07/1047 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.