Council archive · source document
00152058.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
* ‘ e . u . woe
a
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 Aprit 2007
Operational work that is tidal work or |9. The application involves operational work that is: (ick the applicable boxes) _ ,
work in e eee ot8, tos t [1] (i) tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
i ent distri ‘ og .
: more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF
local goverment tidal areas ve o eg , [1 (ii) tidal work that is prescribed tidal work'" other than in a canal"? -complote Part P of Form 1:
Unless you answered “none of the above” to 9, . . :
the application requires assessment by the . or ; | . ,
_ Envitonmental Protection Agency {EPA}. [1 (iii) carried out within a coastal management district under the Coastal Act and for — complete
Ifan agency other than EPA is the’ assessment | - Part M of Form 1 if any box/es (a) fo (i) below are ticked. : . -
conten agency br he eppiccian (J (a) constructing or installing works in a watercourse between MHWS and HAT (ie,
relation to this matter.; " __ ofher than those works in tidal water} where the development has been determined not
Local govemmentis the’assessment manager: * to be assessable against the Water Act 2000 ; oe
. for af Prescribed ta work. oti ER Ms LJ] (b) constructing a’canal intended to be connected to tidal waters; .
En] [J (ce) constructing an artificial waterway;
Step ETE 1 @) reclaiming land under tidal water:
EY op (1 (e) disposing of dredge spoil or other solid waste material in tidal water;
Ao Ps ae CES an , : : . : : ,
, Po met ER Woot 1 (f} interfering with quarry material on State coastal land above high-water mark:
La es) gs ANE ees “a: «on dent
: aN wee eR ae eS L] (9) draining or allowing drainage or flow of water or other matter across State
it DR Sake ye ide cee ny es ee at aa: . oe
A Oe ak SE ee coastal land above high-water mark;
TEN Gos Re IN Apa" aoe Ue hae gaan . . . . oo
we & i Se one CSN RT EASE (1) (h) removing or interfering with coastal dunes on land, other than State coastal land, .
AEST Qn a eas BR BS Sees on . 9 : : .
as Pee ge GES RS AEE) ‘that is in an erosion prone ‘area and above high-water mark; .
6 upT Sy UL RSE, ae Ee , (] {i} constructing a bank or bund wall to establish a ponded pasture on land, other
The ee aa eh Bn be BE ea g : .
Dee fa ae than State coastal land, above high-water mark; or
yg Ue HR ang ca a hoe ASAE . i
. at Pieter ee |, De iv) none ofthe above, seems ep
< Operational Work below high;water.*'°/10. The application involves operational work that is: (tick the appfcable bowes)
omar NURSE ae at yg . ; .
porhernieht aera e Ue ieee - (1 (i) tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
, more information about praserbed tidal Wd in Coastal Act) that is not prescribed tidal work - complete Pat M of Form 1; or
Mt see Ag YEE PS fm eR Wadd a - . . . . . .
_loral apverommen Udal aces refer @.Gude24% 5! ~— 7 (ii) tidal work that is prescribed tidal work's - complate Part P of Form 1; oF
Unless you'answoredsnione ofthe abovelto“ pen)” i sa: betes ,
{QiOcthe applicaten tigger rteral Bava C1 (iii) carried out within a coastal management district! under the Coastal Act and for - ;
“Queensland Tnsbor {QTY (Martima’ Safety": ‘ Fe cing: ‘ Ahi ial in ti _
“ida 3 concurrence BURNS a, CJ {a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Pe BT RON BH SIRENS ET ESS Pay BS. .
‘Local government is the'assesément manager * Mof Form 1;
for: alliprescribed, dal Work. SSSA RRS SER. [-]{b) reclaiming land under tidal water - complete Part M of Form 1: OF
EE Tg ME OEE SAS at “ten mati sted ot ; os
eta Ra RE RE toe [J (c) constructing a canal, if the canal is associated with reconfiguring a lot ~ complete
ee 2 “ERR Pe Re . Part M of Form 1;
Oca HEE ROSS) OR iv) none of the abov : |
ae les EEE Mea Roe (iv) none oO é above. . .
2 ah NTE foe sare cece beni oth OAR Sk oetE et Nunte Vn te weve AA te et tg A wy a ene AE ee ge A te PA ee pan pe
Coastal management, Reo 97 11. The application involves: (tick the applicable box/es)
@ aes ee as eee atte CJ (i) a material change of use assessable under.a planning scheme involving operational
Hoe mais info ae coe ean ata oR , . . . ‘ ‘ inn
Unless you answered.tnone of theabovesto.cye i istri
“Qi the appeSten requires ssestinen 6) thet ; work carried out completely or partly in a coastal management district .
_ Environmental’ Protée tof Agency (EPA). 8.3 1] (ii) a material change of use assessable under a planning scheme involving building
aE Re tte San Ba Rese weak eka ate ee + 1 i * : :
If.8n-agency-othér than: EPA is the assessment” work, cartied out completely or partly ina coastal management district that is —
“manager. for.the'application; EPA is'a x 5 2y."Ms h : : . 6 000m?
. concurrence aieicy for the. pplication in © “= + the construction of a new premises with a GFA of ai least 1000m
relation to this miatlen. A3"2 9800". Os at + the enlargement of the GFA of existing premises by more than 1000m?
Loo, gt go Se Oiii 7 : . woo
RE a iii} reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
ms ° _ a completely or partly in a coastal management district
: Co (7 (iv) reconfiguring a lot’? assessable under schedule 8 of the IPA and in connection with ,
re the construction of a canal - complete Part M of Form 1
oe} BE) none of the above a a
ee .
10 Tidal work is defined in sch 10 of (he IPA.
44 Prescribed tidal work is defined in the Coastal Protection and Menagement Regulation 2003 and includes certain lidal works completely or parily within a local government tidal area. :
12 Canai means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA. .
_ 44 Prescribed Udal work Is defined in the Coastal Protection and Management Regutation 2003 and Includes certain dal works completely or party within a focal government lial area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastat Protection and.Management Act 1995, other than an area declared as a
‘ coastal management district under section 47(2) of that Act.
16 GFA is defined in sch 14 of the IPA to mean the gross floar area. For a definition of how lo calculated GFA, go to the planning scheme agalnst which the application is belng assessed.
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration Is associated with the construction of an artificial waterway, must be
accompanied by lhe application for the operational works to construct the artificial waterway. , . :
. Page 4See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00152058.001.pdfRelated documentPublic source context ↗
07/1047 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.