A rigid handrail must be fitted on one side of the walkway.

No posts or vertical supports of the proposed jetty are to extend vertically from the
structure unless they provide support for the handrail.

No boatlifting devices are to be attached or moored at the jetty structure for the
purpose of elevating a vessel above the water without Council approval.

The jetty must be constructed in a manner to render the underside area vermin proof.

There must be no electrical reticulation system carrying electricity in excess of 24 volts
beyond the northern boundary of Lease P.

Lighting associated with the use must be designed, installed, operated, and maintained
in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor
Lighting.

Boat repair activities are not permitted on site.
Wastewater and sullage must only be disposed of at approved pumpout facilities.
The mooring facility must not be utilised for live-aboard purposes.

Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act
(EPA) 1994 and the Environmental Protection (Water) Policy 2009.

Parks or other public land must not be used for delivery or removing construction
equipment and materials to / from the construction site in the waterway (other than via
a public boat ramp);

Certification by a Registered Professional Engineer of Queensland must be submitted
to Council at completion of the works and prior to the use of the new pontoons. The
certification must state that the pontoons has been constructed in accordance with best
practice methods, is in accordance with Coastal Protection and Management Act 1995
and are structurally sound.

After completion, the proposed works must be maintained in a sound state of repair in
accordance with the approved plans

All necessary State government approvals relating to this development must be
obtained prior to any works commencing on the site

 

L5.

REFERRAL AGENCIES |

The referral agencies applicable to this application are:

PD-DA-FM1420s/3-18/11/2011 Page 2 of 6

Used in these records

About this file

File size
3.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW12.0139.01 Application to change existing approval - forms & plans.pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.