Condition 4

As per the attached plan, I hereby request to add in a powder coated aluminum frame
“Jetty Tee Head – (JTH)”.

As the diagram highlights, the JTH serves multiples purposes as follows:

       namely it provides a vertical support for the location of CCTV security cameras
       lighting - for safety at the elevation change point of the gangway ramp and hardstand
        timber jetty
       a ‘weigh station’ – and photo background opportunity for “the lucky fisherman” to both
        weigh and photograph their catch upon returning from their fishing tour.

As this marina facility is primarily focused on commercial tour companies etc – it is extremely
important we address the safety of the facility ie: lighting at floor level change points etc.

In parallel it is pre-requisite in this era to offer CCTV camera security for vessels – and after
having contractors on site to assess - this location is the only area in the Lease Area that will
capture the entire mooring facility from camera vision. Extremely important.

To finish the JTH to fit with the rest of the facility, it is anticipated that we will include a weigh
station with “The Jetty” branding to provide a great place for tourists to get that photo of a their
catch of a lifetime….



Condition 7

This condition significantly prohibits the functionality of a commercial marina, as this facility is
recognised as in both the DNR Lease and by Noosa Council.

After discussion with you it is deemed ‘generally in accordance with the approval” – I request
confirmation that:

“It is permissible to install a 240 volt electrical reticulation system beyond the northern boundary
of lease P – to service Leases A – L.

In addressing this risk, these services will be attached to the floating pontoon sections
highlighted on the attached plan, mitigating associated risk of any water inundation.

Where these services are attached to the fixed walkway area, the utility outlets will be located a
minimum of 500mm above the highest recorded flood level, mitigating any risk of flood
inundation.
The areas of Lease A – L will be run on a dedicated circuit from Lease P - with an ELCB (Earth
Leakage Circuit Breaker) further addressing any associated risks.”

Naturally all installations will be carried out by a licensed and certified electrical installer.

Used in these records

About this file

File size
3.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW12.0139.01 Application to change existing approval - forms & plans.pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.