Council archive · source document
Development Application part 1 of 2 IDAS Form 1 & 5 MCU11/0178
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)
q No
® Yes - complete either table D, table E or table F as applicable
Table D (note: do not complete this table if lodging the application on-line using Smart eDA)
Name of owner/s of the land
I/We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land
Date
Table E
Name of owner/s of the land
q The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land Simon and Heidi Cronin
By making this application, I, the applicant, declare that the owner has given written consent to the making of
the application.
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
® No q Yes - complete table G
10. Identify if any of the following apply to the premises (tick applicable box/es)
q adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
q on strategic port land under the Transport Infrastructure Act 1994 - complete table I
q in a tidal water area - complete table J
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)
No q Yes - ensure the type, location and dimension of each easement is included in the plans submitted
Application De!ails - IDAS form I
Version 1.0 18 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 1 of 2 IDAS Form 1 & 5 MCU11/0178Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.