Council archive · source document
Traffic Resport MCU22-0038.01 620.30769-M02-v2.0 Minor Change Assessment 20230203 · MCU22/0038.01
Very large file (17.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Rev. Date Description Iss. Appr.
A 08.03.22 WIP ELEVATIONS PW PW
B 08.03.22 WIP ELEVATION PW PW
C 09.03.22 WIP DA PW PW
D 14.03.22 DEVELOPMENT APPLICATION PW PW
2 E
F
14.03.22
15.03.22
DEVELOPMENT APPLICATION
DEVELOPMENT APPLICATION
PW
PW
PW
PW
3000 G 15.03.22 DEVELOPMENT APPLICATION PW PW
5 5 5 H
I
15.03.22
16.03.22
DEVELOPMENT APPLICATION
DEVELOPMENT APPLICATION
PW
PW
PW
PW
2 J 28.04.22 DA RFI - ROOF PITCH PW PW
9 9 9 9 K 18.05.22 DA RFI PW PW
4 2 4
10200 RL20.5
10000 RL20.3
LEVEL 1 LEVEL 1
14.500 m 8 8 14.500 m
7
7
10 3
6 7 6 4 3000
3000
4 2 4
GROUND FLOOR GROUND FLOOR
10.300 m 10.300 m
1 SOUTH WEST ELEVATION
1000 1 : 100 1
3000
Do not scale this drawing. Verify all dimensions on site before commencing
any work. Copyright © 2020 Buchan. This drawing remains the property of
The Buchan Group Australia Pty Ltd. Reproduction in whole or in part without
prior consent is forbidden.
FINISHES: File
1. PROFILE METAL ROOF SHEET TO SELECTION. COLORBOND
"WINDSPRAY".
1 2. MASONRY FINISH TO SELECTION. -
1
3. PROFILE METAL WALL CLADDING TO SELECTION. COLORBOND APPROVED PLAN
4
"BASALT". MCU22/0038
4 4 4. POWDERCOATED ALUMINIUM GLAZING.
5. POWDERCOATED EXTERNAL LOUVRE SCREEN. NOOSA COUNCIL
18 AUGUST 2022
LEVEL 1 LEVEL 1
11 6. PROFILED FIBRE CEMENT CLADDING TO SELECTION.
8500 RL18.8
14.500 m 3 3 14.500 m
7600 RL17.9
7. ALUMINIUM BATTENS. ANODISED FINISH.
8. BALUSTRADE TO SELECTION.
6 9. CHS COLUMNS. PAINTED FINISH.
10. ENTRY ARBOR/COVERED WALKWAY.
11 4 11 11. TILT UP OR MASONRY. TEXTURED PAINT FINISH.
GROUND FLOOR GROUND FLOOR
10.300 m 10.300 m
2 NORTH EAST ELEVATION
1000 1 : 100
1 1
2 5
10200 RL20.5
9 9
4 2 4
LEVEL 1 LEVEL 1
14.500 m
7 8 8 3 14.500 m
7700 RL18.0
10 6 7 7 6
2
4 4
GROUND FLOOR GROUND FLOOR Project
10.300 m 10.300 m
Lot 22 Medihub
3 SOUTH EAST ELEVATION Noosa Business Centre
1000 1 : 100 28 Eenie Creek Road
Noosaville QLD
Project Number
721072
Status
Date Plotted
18-May-22 4:11:20 PM
Date Issued
18.05.22
Scale
5 5 0 1 2 4 6M
9 9 9 9 Drawing Title
4 4 7 2 ELEVATIONS
7
10000 RL 20.3
LEVEL 1 LEVEL 1
7
8600 RL18.9
14.500 m 8 8 8 14.500 m
6 6 6
7 Drawing Number Revision
A-DA-3000 K
2 4 4 2
GROUND FLOOR GROUND FLOOR
10.300 m 10.300 m
DEVELOPMENT APPLICATION
4 NORTH WEST ELEVATION
1000 1 : 100 Brisbane Studio
+ 61 7 3859 9222 / buchangroup.com.au
Document Set ID: 22079516
Version: 1, Version Date: 23/08/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Traffic Resport MCU22-0038.01 620.30769-M02-v2.0 Minor Change Assessment 20230203.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.