Council archive · source document
Extension to Currency Period Report 132003.221172.9
Author Development Planner, Wilhelm Koschade APPLICATION DETAILS Application No. 132003.221172.9 Development Approval Development Permit for Material Change of Use (Duplex) Applicant Wade Jenner Request Received On 30 May 2018 PROPERTY DETAILS Property Address 61 Elanda St Sunshine Beach Qld 4567 RP Description Lot 408 RP 48112 Land Area 505m2 Existing Use of Land Detached Dwelling STATUTORY DETAILS SEQRP Designation Urban Footprint Locality Eastern Beaches Locality Zone Attached Housing Zone Overlays Nil Assessment Type Extension to Currency Period PROPOSAL The applicant seeks an extension to the currency period by a further 2 years. The applicant suggests the extension is being sought as “…the site was recently sold with the new owner submitting the application to change the approved plans. The new owner is committed to commencing construction on the duplex as soon as the relevant approvals have been issued however has noted that the currency period for the approval finishes on 16th December 2018. The owner indicates that the development will take approximately 12 to 18 months to build and therefore requests an extension of 2 years for the Material Change of Use approval.” background On 14 October 2004, Council issued a Preliminary Approval for Material Change of Use - Duplex Dwelling. Following the submissions of representations, Council on 16 December 2004 decided to issue a full Development Permit subject to the conditions contained in the preliminary approval issued on 14 October 2004. In addition, Council agreed to delete Conditions 1, 12 & 13 and agreed to amend Condition 2. In relation to a request to extend the relevant period of the existing approval, Council on 9 December 2008 decided to approve a change to Condition 17 extending the relevant period until 16 December 2010. In relation to a request to extend the relevant period of the existing approval, Council on 9 August 2010 decided to approve a change to Condition 17 extending the relevant period until 16 December 2012. In relation to a request to extend the relevant period of the existing approval, Council on 25 July 2012 decided to approve a change to Condition 17 extending the relevant period to 16 December 2014. In relation to the request to extend the relevant period of the existing approval, Council on 17 October 2014 decided to approve a change to Item 3 and Condition 17 extending the relevant period for 4 years to 16 December 2018. In relation to a request to make a change to the existing approval, Council on 16 February 2015 decided to approve a change to Conditions 2, 6, 11, 21 & 22 and Delete Conditions 14 & 23. The approved changes application related to a new owner purchasing the site with the intent to construct a 2 x 3 bedroom duplex with an amended layout to that which was approved on 16 December 2004. An inset of the amended design is provided below. Note: Provide discussion of known background information leading to the lodgement of the current application (if any), and any site history of general interest and context to the application In relation to a request to make a minor change to the existing approval (relocation of driveway, lift shaft and internal renovations), Council on 4 July 2017 issued approval. On 7 March 2018, Council issued approval to amend conditions 2 and 5 with the addition of condition 50. The approved change relates namely to major amended to the building design externally. Some internal floor areas were also amended. The insert from the officer’s previous report provides a breakdown of the changes: “The applicant seeks approval to change the existing development approval. The proposed change includes an amended exterior building design in addition to alternative bedroom/living configuration, relocation of pool to southern boundary and driveway to north. Minor change is also proposed the approved Operational Works relating to stormwater design, engineering and landscaping design to reflect the building changes. This is being separately assessed. The amended design still keeps the parking areas at ground floor, a central lift shaft with a residential unit on each floor and roof top terrae area. The development still remains a 2 x 3 bedroom duplex dwelling with no increase in gross floor area or site cover beyond what the Planning Scheme permits.” The insert below depicts the new building design. assessment The applicant has requested an extension to the currency period to the development approval under section 86 of the Planning Act 2016. Statutory Instruments – Planning Scheme The site is included in the Eastern Beaches Locality and is zoned Attached Housing. There are no relevant Overlays applicable to the site. The following is an assessment comparison of the proposal against The Noosa Plan and the existing approval: Criteria Noosa Plan Previous Proposal Comply New Proposal Consistent with previous approval Population density 8.09 persons 6.6 6.6 Gross floor area 303.6 m² 303.5 303.6 Site cover 35% 39.96% 39.72% Landscaped open space 198m2 268m2 222m2 Length of wall 15 m 12 23 X Boundary setbacks Frontage Rear Side (north) Side (south) 6m 10 m (3rd storey) 6 m (storey 1 & 2) 8m (3rd storey) 1.5 m 2.0 m 1.5 m 2.0 m 7m 7m 6.2m 6.2m 1.3m 2.5m 1.5m 2.5m x x x x x 6.6m 6.1m (7m to wall) 6.85m 6.85m 1.5m 2.55m 2.0m 2.55m X Building height in storeys in metres 3 storeys 12m NGL 12m FGL 4 storeys (mezzanine) 12m NGL 12m NGL 3 storeys 12m NGL 12m NGL Car parking 3 4 covered 5 covered Roof Form No roof top terrace Roof Pitch Eaves to 75% Roof top terrace 12.5 & 7.5 degrees Eaves to >75% Roof top terrace 5 degrees <75% X X Roof Form The proposed design does not include a roof pitch and eaves to 75% of the roof perimeter consistent with the locality requirements and the previous approved development. The code nominates the roof form provisions to ensure buildings and structures contribute positively to the local skyline, complement the beach side character of the area while ensure no opportunities are created for residents to overlook private open space of neighbouring properties. The proposed design does not include eaves to 75% of the roof perimeter and does not use a traditional gable or skillion roof. Although contrary to the code, it is considered that the proposed development includes sufficient articulation, windows, open balconies (with balustrades of open construction), mix of materials and finishes to integrate with the beach side character of the area and existing development in Elanda Street. These design features together soften the appearance of bulk resulting from the roof form shortfall. The proposed design is consistent with both existing development to the north and south and will present a similar scale to Elanda Street. The proposed roof top terrace is generally located in the same position as the approved development and does not permit users to overlook onto the private open space areas of neighbouring residents. The proposed amendments are considered minor and have no ramifications to any key built form provisions under the current Planning Scheme. Any relaxation to the above provisions have previously been assessed and considered compliant with the Planning Scheme under the same provisions currently prescribed. Previous Approvals 132003.221172.8 The previous approval relating to the amended building design was considered in keeping and consistent with the existing approved design and the relevant provisions of The Noosa Plan. There has been no changes to these provisions since the date of the previous approval and therefore the further request to extend the currency period does not raise concern. Furthermore, numerous extensions has been approved by Council for the superseded approved duplex development. The new design is considered in keeping and consistent with the previous design and considered to comply with the key built form requirements of the Eastern Beaches Locality Code. RECOMMENDATION That Council note the report regarding Application No. 132003.221172.9, for a Development Permit for Material Change of Use, situated at 61 Elanda St Sunshine Beach Qld 4567 described as Lot 408 RP 48112, and A. Approve the extension to the currency period of application No. 132003.221172.9 until 16 December 2020. B. Amend Item. 3 of the Decision Notice to read as follows: The currency period for this development approval finishes on 16 December 2020. C. Amend condition 17.1 to read as follows: 17.1 the use has not commenced by 16 December 2020, unless application is made and approved by Council for an extension; or D. Include additional advisory note 8 to read as follow: Infrastructure Contributions 8. Infrastructure contributions for additional networks are payable under an Infrastructure Agreement dated 22 October 2014 attached to the site. [word/footer1.xml] Page 5 of 5 [word/header1.xml] 3 [word/header2.xml] EXTENSION TO CURRENCY PERIOD – DELEGATED REPORT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Extension to Currency Period Report 132003.221172.9Related documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
- DOCX
No other editions are linked here.