07/0387 - Submitted plans [As Published] · 142007.387

of 31

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
4, 207 APR- 2007 09:18 . FROM SCG ENGINEERS . TO 54426549 " P,.004
% _- -

as?

7. Indicate on the plans the avaliable headroom at the entrance to the carparking
- area and at the garage doors. :

8. Indicate on the plans the location and type of the required signposting In
accordance with Condition 29 of the Decision Notica File No. 2004/5045 dated 1
August 2005. . : . .

. Frontage Works .

 

9. Please provide additional detail, width, materials, levels etc of the required
footpath across the frontage of the site. * we so

Site Works

10. {tls noted that the submitted plan, drawing No. 16115-OW-1A prepare by SCG

Consulting Engineers, indicates that sheet piling and other works are to take

place on‘ the adjoining properties. Please revise the drawing to indicate that all

Vans -onuis _—fe works are to be wholly contained within the subject site. Should any temporary
structures be placed an and/or works need to be undertaken on the adjoining

properties a letter of approval signed by the adjoining property owners shall be

submitted’ to Council with the revised plans. a

41. Plaase provide comment from a suitably qualified engineer regarding the Impacts. -
: of the proposed site works and the consiruction of the proposed pools will have

on the Council sewer main located on the adjoining properties at the rear of the .
tbis-P) ——2 site. Should this comment indicate that the proposed works would have an
adverse atfect on the sewer main the proposad works shall be modified to ensure

that no adverse affects will occur to the sewer main. .

Please provide four (4) copies of all Information that you are providing. In addition, it
would assist Council If you could also provide an electronic copy of your response. ‘

Pursuant to the conditions of the Development Permit for a Material Change .of Use
please note that all bonds and contributions are required to be paid prior to the issue of |
the Operational Works approval.

Please be aware that under Section 3.2.12 of the Integrated Planning Act, the applicant
is to respond to any information request within 12 months of the request or otherwise,
the application lapses. ‘

Under the provisions of the Integrated Planning Act 1997, you as the applicant, have
three options avallable (n response to this Information Request. You may give the
assessment manager (in this instance Council) and each refarral agency (if any):-

1. all of the information requested; or

2. part of the information requested together with a letter asking the assessment
manager and each referral agency to proceed: with the assessment of the
application; or ’ . :

3. a latter:-

.

3.1. stating that you do not intend to supply any of the information requested;
and . .

3.2." asking the assessment manager and each referral agency to proceed with
: the assessment of the application.

o

Award Winner - Australian Clean Beach /
Challenge 2004 Litter Prevention ‘ ‘

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0387 - Submitted plans [As Published].pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.