Original source · versioned page text
Pickup_Dropoff plan
Attached to the e-mail Response to Info Request (Letter, DA Form 1, Owners Consent, carpark plan, masterplan, pickup dropoff plan) - MCU18/0097.
Plans and drawings: the text below has words only, no drawings.
LEGEND BK MK g a el PROPOSED CARPARK - cA i heat A 30 SP170751' PROPOSED BARRIER KERB PROPOSED MOUNTABLE KERB EXISTING KERB TO BE DEMOLISHED & REMOVED EXISTING KERB / EDGE OF BITUMEN RP BOUNDARY EXISTING TREE TO BE REMOVED SS SE GOOD SHEPHERD LUTHERAN COLLEGE 1 SP228052 qe 3.30m | HON) ——s a i WAITING AREA PRELIMINARY ISSUE CONTRACTOR TO CONFIRM AND LOCATE ALL EXISTING SERVICES PRIOR NOT FOR CONSTRUCTION TO COMMENCEMENT OF WORKS 1:250 AT A1 0 5 10 15 20m 1:500 AT A3. QQ ee Rev.| Date | Revision Details om | App @ Builders Name Client Name Project Deals Drawing Tite Drawn Signed Date Scale: [seas Al . ss ject Number ® ouyssey Consulting Group PROPOSED CAR PARK mes [oe ae | K4DTT @ Structural and Civil Engineers GOOD SHEPHERD 415 EUMUNDI ROAD PICK-UP / DROP-OFF See ann re me LUTHERAN COLLEGE NOOSAVILLE LAYOUT PLAN Cet Sone 3 26-10-18 ISSUED FOR INFORMATION ss meanest Contre Email, [email protected] Tne Sod mae Drawing No. Rev. [carrera een For eroraon S P013 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original