APPROVED PLANS
OPW21/0184 24 AUG 2021
[OCR of page images]
NOOSA COUNCIL
APPROVED PLANS
OPW21/0184 24 AUG 2021
LANDSCAPE MANAGEMENT PLAN
SITE MANAGEMENT STRATEGIES TO CURRENT SITE CONDITIONS
ON-GOING MANAGEMENT OF REVEGETATION WITHIN THE WOORO! CREEK BUFFER ZONE
Area of revegetation planting - approx. 1.500m?
~ requires bi-monthly spraying/weed removal
Spr Te: i aa 6
me, PROPERTY eounosgy 2 Area of rehabilitation works - approx. 3950m?
= requires bi-monthly spraying/weed removal
Area to remain unmanaged - approx. 5,400m?
= to be monitored only during above maintenance visits
(inform if weed management is required)
ON-GOING MANAGEMENT OF CENTRAL DRAINAGE CORRIDOR
Area of weed control within Open Space Area - approx. 19,665m?
4
10m wide firebraak along edge of development = requires slashing twice yearly and/or monthly spraying/weed removal
PRECINCT to adjacent Residential properties
Area of weed control within Drainage Corridor - approx. 7,725m?
7 y 86
= requires monthly spraying/weed removal
PRECINGT
8
ON-GOING MANAGEMENT OF EDGE OF DEVELOPMENT
inhi ® Mihk. pequires monthly spraying/weed removal
Area of weed control within existing vegetation - Nom.Sm wide/approx. 2,950m?
3 ( PRECINCT
A 5
Area of weed management to development frontage - Nom.10m wide/approx. 2,620m?
= requires monthly spraying/stashing
10m WIDE FIREBREAK
Area of managed firebreak ~ Nom.10m wide/approx. 1,150?
- requires half-yearly monitoring/vegetation removal
a Weed Management Overview
In general for the purpose of the Rehabilitation and Edge of Development Weed Control areas, weeds are plants
which are not endemic to the Sunshine Coast region and recognised as an invasive species in scientific literature
Noted weed species within the proposed area of works include (but not limited to) dense infestations of Singapore
Daisy (Sphagneticola frilobata/, Mile-a-Minute (Ipomoea cairica), Pepper Tree (Schinus terebinthifolius), Cocos Palm
(Syragrus romanzoffiana) and Umbrella Tree (Schefflera actinophylla). All identified weed species are to be
controlled using appropriate control methods.
The designated areas are to be managed to control all weeds species listed in the following standards and
PRECINCT 5
1
Prope,
TY Boy
UNDA
legislation
(a) Management of weeds in accordance with the provisions of the Biosecurity Act 2014
PRECINCT - \ ce (b) Control of weeds as listed within the Sunshine Coast Local Government Area Pest Management Plan
2012-2016
Herbicide application is to be undertaken in accordance with the South East Queensland Restoration Framework
2: \
(Chenoweth EPLA and Bushland Restoration Services, 2012). Treatment is to target introduced species only and be
carried out in a manner that minimises disturbance to native plants. When undertaking herbicide application for
Lf 7
2 weed control, particular care will be taken to ensure that no off-target damage occurs to native vegetation. To
prevent any unnecessary and excessive use of herbicides during weed control activities, a vegetable based dye will
%
3,
M ‘ a be mixed with all herbicides to be used for spray application. Avoid weed control along drainage corridors during
cky a f==~==--------------55-7 / % amphibian breeding season (typically late spring to early autumn). Avoid using surfactants, as many of these are
NN 0 PY oad %, more toxic to wetland fauna than actual herbicide,
a I Ne = Note: Where Glyphosate is indicated for use in chemical treatments, Glyphosate Biactive or an equivalent ‘Frog
RY
Friendly’ herbicide must be used.
PROPOSED REVEGETATION/REHABILITATION WORKS.
Area of proposed vegetation management - approx. 6,000m?
~ requires initial weed removal followed by monthly spraying/weed removal program
= requires tubestock in-fill planting consistent with the revegetation species
implemented in previous works under OPW 19/0138
~ planting densities to be 1 tree per 6m? / 1 shrub per 2m? / 1 groundcover per 1m?
~ final planting quantities to be confirmed on site (indicative quantities listed on
sheet L501)
The proposed landscape works are to be generally consistent with the Landscape Concept Plan LA03
prepared by Covey Associates Jan 2013
heck all dimensions before commencement of work
Check Site boundary dimensions ‘tor che Tile pla
F Pulling Boundary clearances by set out
standing che information supplied on this deavin
rion, depth and extert oF ancktoround thea
ontinvied and protected ‘
unmencemert of work
ONSISILITY THE CO CTO
RELEVANT AUTHORITIES TO
TION OF ALL EXISTING SERVICES:
ENCEMENT OF EXCAVATIC
ewvices ane to be
tractor prior to
SCALE 1:1000 (A1)
Checked ~_kH 2 Consulting Civil & frees raving tile = * - SUNDALE TEWANTIN Site = roet 172102 she
Pesign — a“ * Structural Engineers) KEVIN COVEY bEro-PEno MBA iE Ke E's | Landscape Management MCKINNON DRIVE igtal ot 9 ees Pl fu
ales — re — FES 2021 [aioacapoe Se | ET POT Cove. Project Management] Strategies - Whole of Site tee - SUNDALE TEWANTIN TH ' opjricht and shall
- a a >| ASSOCIATES PTY LTD 3 Planning itho approval, ror shall tb
\ dacun - OPW By ABN 59 13 99 fi lopment and the
o 14n recinet Plan chyct
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.