2107-23919 SRA - Response with conditions
Attached to the e-mail 2107-23919 SRA application correspondence - MCU21/0117 Environmental Traffic and Rail Noise Level Impact Assessment for Proposed Residential Unit Development, 54 Elm Street and 5 Pearl Street, Cooroy.
2107-23919 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)
No. Conditions Condition timing
Material change of use for a multiple dwelling
10.9.4.2.4.1—The chief executive administering the Planning Act 2016 nominates the Director-General
of the Department of Transport and Main Roads to be the enforcement authority for the development
to which this development approval relates for the administration and enforcement of any matter
relating to the following conditions:
1. (a) Carry out the development generally in accordance with the Prior to the
Environmental Traffic and Rail Noise Level Impact Assessment, commencement of use
prepared by David Moore dated 2.7.2021, report number and to be maintained at
R21046/D3569/ Rev.0/2.07.2. In particular – all times.
(i) construct a 2 metre noise barrier in the location shown
on Figure 7 Location and Heights of Acoustic Barriers.
(b) The noise barrier must be designed in accordance with:
(i) the Department of Transport and Main Roads' Road
Traffic Noise Management Code of Practice, Chapter 5’
Specifications MRS15 and MRTS15; and
(ii) Standard Drawings Road Manual, Part 13.
(c) RPEQ certification must be provided to North Coast Region via
[email protected] or 5451 7055 within the
Department of Transport and Main Roads, confirming that the
development has been constructed in accordance with parts (a)
and (b) of this condition.
2. (a) Stormwater management of the development must ensure no (a)
worsening or actionable nuisance to the state-controlled road. At all times.
(b) Any works on the land must not: (b)
(i) create any new discharge points for stormwater runoff At all times.
onto the state-controlled road;
(ii) interfere with and/or cause damage to the existing (c)
stormwater drainage on the state-controlled road; Prior to the
(iii) surcharge any existing culvert or drain on the state- commencement of use.
controlled road;
(iv) reduce the quality of stormwater discharge onto the
state-controlled road .
(c) RPEQ certification with supporting documentation must be
provided to North Coast Region via
[email protected] or 5451 7055 within the
Department of Transport and Main Roads, confirming that the
development has been designed and constructed in accordance
with parts (a) and (b) of this condition.
3. (a) The existing vehicular property access located between Lot 2 on Prior to the
RP64750 and Elm Street must be permanently closed and commencement of use.
removed.
State Assessment and Referral Agency Page 3 of 8