Original source · versioned page text
Appendices 4 - Traffic and 5 - Engineering Email 2 of 4 - MCU16/0153 & REC16/0041
Very large file: it may take a few minutes
The original of this document is very large (14.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
1.0 INTRODUCTION
1.1 Background
In November 2016, Pekol Traffic and Transport (PTT) was engaged by Thomco (no 2087) Pty Ltd to
prepare a Traffic Impact Assessment for a proposed residential / visitor accommodation development
located on the balance land at 215 David Low Way, Peregian Beach. The location of the subject site is
shown on Figure 1.1.
Figure 1.1: SITE LOCALITY
SITE
1.2 Aim
The aim of this assessment is to review the proposed development in terms of the access operations,
parking provision, servicing arrangements and likely impact on the surrounding road network.
1.3 Scope of Report
This report begins by summarising the characteristics of the existing road network (Chapter 2), followed
by a description of the scope and scale of the proposed development, including access, parking and
servicing arrangements (Chapter 3). The predicted peak hour traffic generation of the proposed
development is estimated along with a consideration of its likely traffic impact on the surrounding road
network (Chapter 4). The report concludes with a summary of key findings (Chapter 5).
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.