Log in to see the plans as drawn Performance outcomes Acceptable Outcomes
Editor’s Note — Water supply capacity for firefighting purposes
is in addition to water supply capacity for household use.
Flood Hazard Area
PO16 AO16.1
Where located in the Flood Hazard Area as shown on Flood TheWhere the development is located in the Flood Hazard Area
Hazard Overlay Map in Schedule the developmentDevelopment as shown on Flood Hazard Overlay Map in Schedule 2,
is designed and sited to ensure risk to people and property from the finished floor level of habitable rooms is at least 300
flooding is avoided or minimised. millimetres above the Defined flood event (DFE);
OR
AO16.2
Where the DFE has not been modelled for the area, the finished
floor level of habitable rooms is at least 500 millimetres
above the highest recorded flood.
Editor's noteNote—The QDC mandatory provisions MP3.5 also
apply to the construction of buildings in flood hazard areas.
PO17
Underground car parking areas are designed to drain and No acceptable outcome provided
function safely during a flood event and power failure.
Major Electricity Infrastructure & Substations
PO18 AO18.1
Development is sufficiently separated from major electricity Development including any sensitive land uses is at least:
infrastructure and substations to minimise the likelihood of 50 metres from a transmission substation;
(a)
nuisance or complaint.
(b) 10 metres from any other substation; and
(c) 30 metres from a transmission line easement.
AO18.2
Habitable buildings are not located within an easement for a
distribution line.
PO19 AO19
Development is located and designed to avoid or minimise Noise emissions do not exceed 5db(A) above background noise
noise nuisance from the use of infrastructure. level internal to a habitable building measured in accordance
with AS1055.
PO20 AO20
Wherever practicable habitable buildings are orientated to avoid Where adjoining substations or major electricity infrastructure,
direct overlooking of major electricity infrastructure or habitable buildings are orientated so that the majority of outdoor
substations. living areas and windows of habitable rooms face away from
the infrastructure.
Earthworks and Drainage
PO21 No acceptable outcome provided
Earthworks and drainage operational works do not directly,
indirectly or cumulatively cause adverse Editor's noteNote—Development should ensure that filling does
impacts external to the development site by: not impact on the amenity and usability of neighbouring
(a) causing ponding of water on the site or nearby land; properties (including loss of privacy caused by relative level
changes) or offsite drainage.
(b) increasing flooding, which adversely affects the safety or
use of any land upstream and downstream;
(c) adversely affecting the flow of water in any
overland flow path; and
(d) adversely affecting the privacy or visual amenity
of surrounding property.
**Draft**New Noosa Plan for the purpose of Community Consultation Round 2 2019 Page 6 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.