2019-09-12 Special Meeting Agenda - Item 1 - Attachment 3 - Proposed changes to draft New Noosa Plan - significant changes for re-notification

of 223

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance outcomes                                               Acceptable Outcomes
                                                                         Editor’s Note — Water supply capacity for firefighting purposes
                                                                         is in addition to water supply capacity for household use.
      Flood Hazard Area
      PO16                                                             AO16.1
      Where located in the Flood Hazard Area as shown on Flood         TheWhere the development is located in the Flood Hazard Area
      Hazard Overlay Map in Schedule the developmentDevelopment as shown on Flood Hazard Overlay Map in Schedule 2,
      is designed and sited to ensure risk to people and property from the finished floor level of habitable rooms is at least 300
      flooding is avoided or minimised.                                millimetres above the Defined flood event (DFE);

                                                                         OR

                                                                         AO16.2
                                                                         Where the DFE has not been modelled for the area, the finished
                                                                         floor level of habitable rooms is at least 500 millimetres
                                                                         above the highest recorded flood.

                                                                         Editor's noteNote—The QDC mandatory provisions MP3.5 also
                                                                         apply to the construction of buildings in flood hazard areas.
      PO17
      Underground car parking areas are designed to drain and            No acceptable outcome provided
      function safely during a flood event and power failure.

      Major Electricity Infrastructure & Substations
      PO18                                                               AO18.1
      Development is sufficiently separated from major electricity       Development including any sensitive land uses is at least:
      infrastructure and substations to minimise the likelihood of             50 metres from a transmission substation;
                                                                         (a)
      nuisance or complaint.
                                                                         (b)   10 metres from any other substation; and
                                                                         (c)   30 metres from a transmission line easement.

                                                                         AO18.2
                                                                         Habitable buildings are not located within an easement for a
                                                                         distribution line.
      PO19                                                               AO19
      Development is located and designed to avoid or minimise           Noise emissions do not exceed 5db(A) above background noise
      noise nuisance from the use of infrastructure.                     level internal to a habitable building measured in accordance
                                                                         with AS1055.
      PO20                                                               AO20
      Wherever practicable habitable buildings are orientated to avoid   Where adjoining substations or major electricity infrastructure,
      direct overlooking of major electricity infrastructure or          habitable buildings are orientated so that the majority of outdoor
      substations.                                                       living areas and windows of habitable rooms face away from
                                                                         the infrastructure.
      Earthworks and Drainage
      PO21                                                               No acceptable outcome provided
      Earthworks and drainage operational works do not directly,
      indirectly or cumulatively cause adverse                           Editor's noteNote—Development should ensure that filling does
      impacts external to the development site by:                       not impact on the amenity and usability of neighbouring
      (a)   causing ponding of water on the site or nearby land;         properties (including loss of privacy caused by relative level
                                                                         changes) or offsite drainage.
      (b)   increasing flooding, which adversely affects the safety or
            use of any land upstream and downstream;
      (c)   adversely affecting the flow of water in any
            overland flow path; and
      (d)   adversely affecting the privacy or visual amenity
            of surrounding property.




**Draft**New Noosa Plan for the purpose of Community Consultation Round 2 ­ 2019                                                      Page 6 of 6
Log in to download the original file

2019-09-12 Special Meeting Agenda - Item 1 - Attachment 3 - Proposed changes to draft New Noosa Plan - significant changes for re-notification(PDF, 7MB).pdf · 7.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗