2019-09-12 Special Meeting Agenda - Item 1 - Attachment 3 - Proposed changes to draft New Noosa Plan - significant changes for re-notification

of 223

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance Outcomes                                               Acceptable Outcomes
      Growth management
      Infrastructure and services
      PO12                                                               AO12.1
      New lots are located, sized and configured so as to ensure each    All lots are connected to power supply and telecommunications
      lot is capable of being serviced by appropriate levels of          services and where located within the Urban boundaries, power
      infrastructure including:                                          supply and communications infrastructure are provided
      (a)    power supply;                                               underground.

      (b)    telecommunications; and
                                                                         AO12.2
      (c)    where within Local Plan Areas                               If located in a water service area each new lot can be connected
      (d)    reticulated water supply;                                   to Unitywater’s water supply network.
      (e)    reticulated sewerage; and
                                                                         AO12.3
      (f)    stormwater drainage.                                        If located in a sewerage service area each new lot can be
                                                                         connected to Unitywater’s sewerage network.

                                                                         AO12.4
                                                                         If located in a Local plan area lots can be connected to Council’s
                                                                         stormwater drainage network.

                                                                         AO12.5
                                                                         If not in a sewerage service area each lot has sufficient area and
                                                                         other attributes to ensure efficient and effective on­site
                                                                         sewerage disposal.
      PO13                                                               AO13.1
      Each lot is provided with safe and convenient vehicle access       Vehicular access for the development is consistent with the
                                                                         function and design of the road it takes access from.

                                                                         AO13.2
                                                                         Development does not require new or changed access to a
                                                                         state­controlled road that is a limited access road unless in
                                                                         accordance with the limited access policy for the state­controlled
                                                                         road .

                                                                         AO13.3
                                                                         Access easements are in appropriate locations for safe access
                                                                         and egress, and supply appropriate widths and levels of service
                                                                         for the number of vehicles that will utilise them as per the
                                                                         requirements of Council’s Planning Scheme Policy PSP6
                                                                         Engineering design standards – Roads, drainage and
                                                                         earthworks.

                                                                         Editor's note­ Reference should be made to the Queensland
                                                                         Government's Development Assessment Mapping System to
                                                                         confirm which are state­controlled roads or limited access
                                                                         roads.


     Table 9.5.1.3 Criteria for assessable development (part)
      Performance Outcomes                                               Acceptable Outcomes
      Growth management
      Movement Network
      Traffic
      PO14                                                               No acceptable outcome provided
      Traffic generated by the development is within the acceptable
      capacity of external roads and does not have an adverse impact     Editor’s Note— Further detail on traffic and the road network is
      upon the functioning of the road network.                          addressed in Part 9.4.8 Transport Code

**Draft**New Noosa Plan for the purpose of Community Consultation Round 2 ­ 2019                                                     Page 7 of 14
Log in to download the original file

2019-09-12 Special Meeting Agenda - Item 1 - Attachment 3 - Proposed changes to draft New Noosa Plan - significant changes for re-notification(PDF, 7MB).pdf · 7.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.