Original source · versioned page text
2019-09-12 Special Meeting Agenda - Item 1 - Attachment 3 - Proposed changes to draft New Noosa Plan - significant changes for re-notification
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Industry Activities
Extractive industry Impact assessment
The planning scheme
Bulk Landscape Impact assessment
supplies
The planning scheme
Transport depot Code assessment
If no more than three heavy vehicles or pieces of Rural Zone Code
plant machinery Industry Activities Code
Works codes
Impact assessment
If not otherwise specified The planning scheme
Infrastructure Activities
Landing Code assessment
Rural Zone Code
Editor’s Note—An operational works application is Waterways Works Code
required for operational works for prescribed tidal
works in other watercourses.
Renewable energy Accepted development
facility
Solar cells confined to the roof surface area of a
dwelling house or domestic outbuilding if not
Editor’s Note—domestic
exceeding a total surface area of 300m²
solar systems are not
included in this use Code assessment
definition If a solar farm with a total surface area of all Rural Zone Code
photovoltaic solar cells not exceeding 1,000m2 Infrastructure Activities Code
Works codes
Impact assessment
If not otherwise specified The planning scheme
Substation Impact assessment
The planning scheme
Telecommunications Impact assessment
facility
If located at least 100 metres from any sensitive The planning scheme
land use as defined.
Utility installation Impact assessment
The planning scheme
Recreation Activities
Environment Facility Code assessment
If: Rural Zone Code
(a) located on a site with an area of 4 Recreation Activities Code
hectares or more; and Works codes
(b) involving not more than 20 people in the
use on the site at one time
Impact assessment
If not otherwise specified The planning scheme
Outdoor sport and Impact assessment
**Draft**New Noosa Plan for the purpose of Community Consultation Round 2 2019 Page 4 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.