Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2019-09-12 Special Meeting Agenda - Item 1 - Attachment 3 - Proposed changes to draft New Noosa Plan - significant changes for re-notification

of 223

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Industry Activities
      Extractive industry       Impact assessment

                                                                                      The planning scheme
      Bulk Landscape            Impact assessment
      supplies
                                                                                      The planning scheme
      Transport depot           Code assessment
                                If no more than three heavy vehicles or pieces of     Rural Zone Code
                                plant machinery                                       Industry Activities Code
                                                                                      Works codes
                                Impact assessment
                                  If not otherwise specified                          The planning scheme

      Infrastructure Activities
      Landing                   Code assessment
                                                                                      Rural Zone Code
                                Editor’s Note—An operational works application is     Waterways Works Code
                                required for operational works for prescribed tidal
                                works in other watercourses.


      Renewable energy            Accepted development
      facility
                             Solar cells confined to the roof surface area of a
                             dwelling house or domestic outbuilding if not
      Editor’s Note—domestic
                             exceeding a total surface area of 300m²
      solar systems are not
      included in this use   Code assessment
      definition             If a solar farm with a total surface area of all         Rural Zone Code
                                photovoltaic solar cells not exceeding 1,000m2        Infrastructure Activities Code
                                                                                      Works codes
                                Impact assessment
                                If not otherwise specified                            The planning scheme
      Substation                Impact assessment
                                                                                      The planning scheme
      Telecommunications        Impact assessment
      facility
                                If located at least 100 metres from any sensitive     The planning scheme
                                land use as defined.
      Utility installation      Impact assessment
                                                                                      The planning scheme

      Recreation Activities
      Environment Facility      Code assessment
                                If:                                                   Rural Zone Code
                                (a)     located on a site with an area of 4           Recreation Activities Code
                                        hectares or more; and                         Works codes
                                (b)     involving not more than 20 people in the
                                        use on the site at one time
                                Impact assessment
                                If not otherwise specified                            The planning scheme
      Outdoor sport and         Impact assessment


**Draft**New Noosa Plan for the purpose of Community Consultation Round 2 ­ 2019                                       Page 4 of 9
Log in to download the original file

2019-09-12 Special Meeting Agenda - Item 1 - Attachment 3 - Proposed changes to draft New Noosa Plan - significant changes for re-notification(PDF, 7MB).pdf · 7.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.