Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2019-09-12 Special Meeting Agenda - Item 1 - Attachment 3 - Proposed changes to draft New Noosa Plan - significant changes for re-notification

of 223

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance Outcomes                                               Acceptable Outcomes
      (b)   steps down slopes or uses suspended floor
                                                                         AO20.2
            construction, minimising cut or fill and avoiding benching
                                                                         On properties located on ridgelines or where slope gradient
            of the site;
                                                                         exceeds 15%:
      (c)   retains natural vegetation that assists in screening or            roof lines are generally parallel with contours of the land;
                                                                         (a)
            visually softening development; and
                                                                         (b)   roofs do not exceed a pitch of 15 degrees; and
      (d)   uses materials, finishes and colours that complement
            the natural setting and integrate with the landscape and     (c)   buildings do not protrude above the height of prevailing
            skyline.                                                           vegetation.

                                                                         Editor's note—refer to Figure AP3­3B

                                                                         AO20.3
                                                                         Where slope gradients exceed 15%, split­level buildings with
                                                                         small floorplates are used as an alternative to standard single
                                                                         or double storey construction to minimise building bulk and
                                                                         benching of the sites.

                                                                         Editor's note—refer to Figure 6.9.1A and Figure 6.9.1B

                                                                         AO20.4
                                                                         External building materials are lightweight (such as timber or
                                                                         board, stainless steel, glass, and corrugated iron) and non­
                                                                         reflective with large expanses of solid colours avoided.

     Table 6.3.1.3 Criteria for assessment (part)
      Performance Outcomes                                               Acceptable Outcomes
      Earthworks and drainage
      PO21                                                               AO21
      Filling and excavation for operational works do not directly,      Filling and excavation for operation works are designed and
      indirectly or cumulatively cause adverse impacts external to the   constructed to ensure overland flow and/or flooding is not
      development site by:                                               worsened, impeded, or otherwise diverted to adversely affect
      (a)   causing ponding of water on the site or nearby land;         other properties or downstream environments.

      (b)   increasing flooding, which adversely affects the safety or
            use of any land upstream or downstream; or
      (c)   adversely affecting the flow of water in any overland flow
            path.


 Figure 6.3.1.4 ­ Setbacks




**Draft**New Noosa Plan for the purpose of Community Consultation Round 2 ­ 2019                                                    Page 10 of 12
Log in to download the original file

2019-09-12 Special Meeting Agenda - Item 1 - Attachment 3 - Proposed changes to draft New Noosa Plan - significant changes for re-notification(PDF, 7MB).pdf · 7.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.