Attachment 10: Draft 6 month Capital Works Program
Noosa Council
Draft Capital Works Programme
2013/2014
External Council
Funds Funds Staff
New Program Description Total Total Total Costs
Bridges Forward design for bridge rehab program - 10,000 10,000 10%
Noosa Parade Munna Point Bridge - Investigations and interim
preventative works - 250,000 250,000 10%
Bridges Total - 260,000 260,000 10%
Coastal, Canals and
Waterways David Low Way, Beach Access 49 refurbishment 45,000 45,000 10%
Gympie Terrace and William Street Revetment wall and pathway
rehab 50,000 50,000 10%
Munna Point Holiday Park Bank Protection - Design 50,000 50,000 5%
Noosa Dog Beach SEMP Coastal monitoring 20,000 20,000 0%
Noosa River Mouth Groyne and Rock Wall - Rehab 100,000 100,000 10%
Noosa Waters revetment walls - Stage 2a 1,300,000 1,300,000 4%
Coastal, Canals and
Waterways Total 1,565,000 1,565,000 7%
Community Facilities Peregian Surf Club Public Amenities - Planning & Design 15,000 15,000 100%
Community Facilities
Total 15,000 15,000 100%
Noosa Nth Shore Beach Campground - Upgrade Septic
Page 60 of 95
Holiday Parks treatment 90,000 90,000 10%
Holiday Parks Total 90,000 90,000 10%
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.