75. An inspection is to be carried out with the relevant Council officers, the Contractor and
Supervising Engineer after road centrelines have been established, and prior to clearing
being carried out. This inspection is to deal with the limits of clearing to be carried out for this
development. This meeting is to take place prior to the “Pre-start” meeting.
Damage to Services and Assets
76. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
FOLLOWING CONSTRUCTION / PRIOR TO COMMENCEMENT OF THE USE
Certification
77. Upon completion of the work a certificate must be issued by an RPEQ certifying that the
works have been constructed in accordance with the Operational Works permit.
78. A final inspection and approval of the new works and completed reinstatement works by
Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
inspection.
ON MAINTENANCE
79. All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On
Maintenance’, the supervising RPEQ must submit to Council:
a. certification that all works have been undertaken and completed in accordance with the
requirements of this Permit;
b. a plan showing the constructed footpath;
c. maintenance and operational manuals for all proprietary or site specific devices.
OFF MAINTENANCE
80. Prior to requesting an Off Maintenance inspection the developer must provide a written
request for the Off Maintenance inspection.
81. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
where:
a. A Council inspection reveals works do not comply with approval requirements;
b. Submitted certification falsely states works comply with approval requirements.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
ADVERTISING DEVICES
1. All Advertising Devices must comply with Schedule 10 of Subordinate Local Law No.1
(Administration) 2015 including both temporary and permanent signage. All freestanding,
pylon or pole signs or signage that is illuminated requires approval from Council prior to being
installed. All signage identified in s6 of Schedule 10 of Subordinate Local Law No. 1 is
prohibited from being erected in the Shire.
Page 10 of 14
Document Set ID: 22542722
Version: 4, Version Date: 16/08/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Minor Change - MCU21 0002 01 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 194 KB (small file)
- File type
No other editions are linked here.