2.8
SEDIMENT CONTROL FENCE
APPROX. DRIVEWAY 2.8
2.63
3
NGL 2.710
0.63
2.68
BY OWNER
H) BRIGHTON HOMES WILL CONNECT POWER WITH A SEPARATE CIRCUIT TO THE SEPTIC TANK.
FILL 0.455
TOTAL AREA: 168m²
NGL 2.641
6,000
Bo
TO BDY: 168m²
tto
FILL 0.524 2.8
LOT 1
Found
Stake
5
m
(Total Canopy)
of
4,00
2.50
Ba
Found
Stake
2.6
nk
9
I) NO ALLOWANCE TO PROVIDE AND INSTALL AN INTERNAL SEPTIC ALARM. (ALARM SUPPLIED AND INSTALLED AT TANK LOCATION
0
300.3
89°0'
2.8
0.64
3
79177M2
2.7
2
NGL 2.833
175,177 WALL
FILL 0.332 NGL 2.780
10
NGL 2.840 NGL 2.727
11,250
APPROX. LOCATION OF 10,000LT
H
Ø
2.56
NGL 2.811 FILL 0.385
BY MANUFACTURE.
WATER TANK BY OWNER FOR
174,019 PORC
FILL 0.325 FILL 0.438
BUSHFIRE PURPOSES. LOCATION
173,636 OMP
FILL 0.354 2.7
0.64
TO BE CONFIRMED BY CLIENT. 8
16,50
2.63
APPROX LOCATION 2x 30,000
15,000
LITRE IN-GROUND CONCRETE
0
RAINWATER TANK (BY BUILDER)
2.8
3
J) NO ALLOWANCE TO PROVIDE SUB-SURFACE IRRIGATION IF REQUIRED.
2.7
0.61
2
2.7
5
N
2.6
6 16.5LM TUNNEL
TRENCHING BY BUILDER
APPROX. LOCATION OF
39,051 DRIVEWAY
K) IF REQUIRED GRASS OR TURF COVER TO BE ESTABLISHED BY OWNER PRIOR TO PLUMBING FINAL FOR EFFLUENT SPRAY OR
0.6 HSTP. LOCATION TBC UPON
2.59
0.60
11
RECEIPT OF HSTP REPORT
0.63
340.42
269°0'
TREE SCHEDULE
2.7
7
0.8
TBM 3 Nail
2.48
0.66
SUB-SURFACE IRRIGATION AREA AS STATED ON SEPTIC SYSTEM APPROVAL.
12
2.7
7
1.0
1.17
2.6
9
13
in Dumpy
RL 2.741
2.6
No. Name T 'Ø' Spr 'Ø' 'H'
4
L) OWNER ACKNOWLEDGES THAT IT IS THE OWNER’S RESPONSIBILITY TO ENSURE PROPOSED EFFLUENT SPRAY DISPOSAL AREA
1.2
PROPOSED SUB-SURFACE IRRIGATION
14
AREA - 240 SQM (20 X 12M) 2.6
2
AS PER REPORT BY ONSITE
WASTEWATER DESIGN DATED 07/07/26
TBM 1 Nail
2.38
APPROX. LOCATION OF
U/G Power
PRIVATE TIMBER LEAD-IN
IS CLEARED OF TREES AND OVERGROWN VEGETATION PRIOR TO COMMENCEMENT OF CONSTRUCTION. OWNER TO OBTAIN ALL
2.7 POLE (BY OWNER).
2.4
6 EXACT LOCATION TO BE
5
1 TREE 0.40 m 10.0 m 22.0 m
CONFIRMED ON SITE.
To
0.79
2.67 2.60
p
of
in Dumpy
2.696 RL
2.7
Ba
1 2.5
nk
9
15
1.20
NECESSARY COUNCIL APPLICATIONS FOR REMOVAL OF TREES AS REQUIRED.
Tr
2.6
1.8 5
4
ac
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Flood report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 12.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.