Council archive · source document
Flood report · MCU26/0104
Very large file (12.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
Figure 3 – Development Plan
2.5 Council Data
The site is located within NSC’s Flooding and Inundation Extent overlay as show below in
Figure 4.
NSC’s Flood Information Certificate (presented in Appendix B) identifies a defined flood level
(1% AEP flood event for year 2100) of RL3.20m AHD and maximum flood velocity of 1.20m/s.
Flooding on the site occurs as a result of backwater (rising waters) from Lake Cootharaba.
5
1534 Louis Bazzo Drive, Cootharaba FLOOD SMART
26-148 ENGINEERING
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Flood report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 12.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.